Bob Devine & Ed Foerster “Simulation & Modeling” Term Project December 7, 1999 Facilities Planning A Simulation Study of a Flow Shop Vs. a Job Shop Manufacturing.

Slides:



Advertisements
Similar presentations
Process Selection and Facility Layout
Advertisements

Inference Sampling distributions Hypothesis testing.
Introduction to Statistical Quality Control, 4th Edition Chapter 7 Process and Measurement System Capability Analysis.
 1  Outline  Model  problem statement  detailed ARENA model  model technique  Output Analysis.
Chapt 3 Modeling & Simulation Processes Intro/ steps in the process –Formulate problem –Specify the model –Build model –Simulate model –Use model –Support.
Chapter 15 Application of Computer Simulation and Modeling.
Output Data Analysis. How to analyze simulation data? simulation –computer based statistical sampling experiment –estimates are just particular realizations.
Copyright 2004 David J. Lilja1 Errors in Experimental Measurements Sources of errors Accuracy, precision, resolution A mathematical model of errors Confidence.
Lecture 7 Model Development and Model Verification.
Lecture 9 Output Analysis for a Single Model. 2  Output analysis is the examination of data generated by a simulation.  Its purpose is to predict the.
Lantech Case Study Presented by: Ray Essig Natalie Lavergne Karine Lavoie-Tremblay.
Copyright © 1998 Wanda Kunkle Computer Organization 1 Chapter 2.1 Introduction.
Perencanaan Kapasitas Produksi
SIMULATION. Simulation Definition of Simulation Simulation Methodology Proposing a New Experiment Considerations When Using Computer Models Types of Simulations.
WAITING LINES The study of waiting lines, called queuing theory, is one of the most widely used and oldest management science techniques. The three basic.
MNG221- Management Science –
Monté Carlo Simulation MGS 3100 – Chapter 9. Simulation Defined A computer-based model used to run experiments on a real system.  Typically done on a.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Product layout Assembly-line balancing approach. 2 Facility layout Process terminology Cycle time: Average time between completions of successive units.
Analysis of Simulation Results Andy Wang CIS Computer Systems Performance Analysis.
Dr. Godfried Williams1 Project Management – Topic 6 Lecture Content Planning Tools/Techniques Optimization Techniques Resource Planning & Allocation Linear.
Simulation Output Analysis
Introduction to Statistical Quality Control, 4th Edition Chapter 7 Process and Measurement System Capability Analysis.
1 Validation & Verification Chapter VALIDATION & VERIFICATION Very Difficult Very Important Conceptually distinct, but performed simultaneously.
Chapter 10 Verification and Validation of Simulation Models
 1  Outline  stages and topics in simulation  generation of random variates.
22/04/2017 Process selection.
Verification & Validation
Chapter 4 Process Design.
Managing Processes and Capabilities CHAPTER THREE.
Ch. 20: Operation systems Learning Objectives Distinguish among various types of production and manufacturing processes. Describe product innovation.
Simulation Based Production Planning, Scheduling, and Control Johannes Krauth Sim-Serv.
Queuing Theory Basic properties, Markovian models, Networks of queues, General service time distributions, Finite source models, Multiserver queues Chapter.
Waiting Lines and Queuing Models. Queuing Theory  The study of the behavior of waiting lines Importance to business There is a tradeoff between faster.
+ Simulation Design. + Types event-advance and unit-time advance. Both these designs are event-based but utilize different ways of advancing the time.
Simulation is the process of studying the behavior of a real system by using a model that replicates the behavior of the system under different scenarios.
Simulation of a Generic Cellular Manufacturing System Using Rockwell Arena Simulation Software This document provides a generic simulation model of a cellular.
Principles of Plant Layout 1. Principle of integration: A good layout is one that integrates men, materials, machines and supporting services and.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
IE450 Models Relating Cycle-time, Throughput, WIP and Batch Sizes
Chapter 10 Verification and Validation of Simulation Models
Simulation is the process of studying the behavior of a real system by using a model that replicates the system under different scenarios. A simulation.
1 OUTPUT ANALYSIS FOR SIMULATIONS. 2 Introduction Analysis of One System Terminating vs. Steady-State Simulations Analysis of Terminating Simulations.
MODELING EXAMPLES Types of model Conceptual Containing components that have not been clearly Identified in terms of theoretic categories such as state,
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Slide 0 of 96 Manufacturing Facility Layout. Slide 1 of 96 Basic Layout Forms Process Product Cellular Fixed position Hybrid.
1 1 Slide Simulation Professor Ahmadi. 2 2 Slide Simulation Chapter Outline n Computer Simulation n Simulation Modeling n Random Variables and Pseudo-Random.
OPERATING SYSTEMS CS 3530 Summer 2014 Systems and Models Chapter 03.
Discrete-Event System Simulation Project Simulation of Complex Manufacturing System Cheryl Yale.
Chapter – 1 Process Costing Chapter outcomes: 1.Meaning and nature of process costing; 2.Application of process costing; 3.Fundamental principles of process.
Simulation Examples And General Principles Part 2
Building Valid, Credible & Appropriately Detailed Simulation Models
Abu Bashar Queuing Theory. What is queuing ?? Queues or waiting lines arise when the demand for a service facility exceeds the capacity of that facility,
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
Chapter 1 What is Simulation?. Fall 2001 IMSE643 Industrial Simulation What’s Simulation? Simulation – A broad collection of methods and applications.
Modelling & Simulation of Semiconductor Devices Lecture 1 & 2 Introduction to Modelling & Simulation.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 3: Cost Estimation Techniques
OPERATING SYSTEMS CS 3502 Fall 2017
Interactive Factors in Manufacturing
Cellular Layouts Cellular Production Group Technology
Manufacturing system design (MSD)
Chapter 10 Verification and Validation of Simulation Models
FACILITY LAYOUT Facility layout means:
Departmental Planning
MECH 3550 : Simulation & Visualization
Simulation Supplement B.
Verification and Validation of Simulation Models
Presentation transcript:

Bob Devine & Ed Foerster “Simulation & Modeling” Term Project December 7, 1999 Facilities Planning A Simulation Study of a Flow Shop Vs. a Job Shop Manufacturing Layout

Bob Devine & Ed Foerster “Simulation & Modeling” Term Project December 7, 1999 Characterized by: Product-oriented layout composed mainly of a few lines. Specialized equipment dedicated to the manufacture of a particular product is used. Processing and Assembly facilities are analyzed in accordance with the products’ sequence of operations. Advantage: Can have very high production rates Disadvantage: Investment is high in the specialized machine. The Flow Shop (Product Layout)

Bob Devine & Ed Foerster “Simulation & Modeling” Term Project December 7, 1999 The Flow Shop (Product Layout) - Continued [Talk about the diagram here]

Bob Devine & Ed Foerster “Simulation & Modeling” Term Project December 7, 1999 The Job Shop (Process Layout) Characterized by: Functional design Variety of products manufactured Performs a wide variety of manufacturing processes General Purpose production equipment, grouped according to the type of manufacturing process (i.e. the lathes are in one department, saws in another, and mill in another) Advantage: Ability to make a wide variety of products Disadvantage: Parts can spend an exuberant amount of time waiting or being transported.

Bob Devine & Ed Foerster “Simulation & Modeling” Term Project December 7, 1999 The Job Shop (Process Layout) - Continued [Talk about the diagram here]

Bob Devine & Ed Foerster “Simulation & Modeling” Term Project December 7, 1999 Problem Formulation & Objectives At issue is the best layout for a proposed plant that will be manufacturing 3 different types of specialty parts for the automotive industry (i.e. gears, pistons, valves). A job shop with a process layout will be compared to a flow shop with a product layout. Performance parameters will include: - Machine Utilization (% Empty and % Partially Occupied). - Work in Process. - Throughput.

Bob Devine & Ed Foerster “Simulation & Modeling” Term Project December 7, 1999 Model Conceptualization & Translation - Flow Shop Data Assumptions: (Ideally based on the collection of reliable data and correct statistical analysis) Arrivals of unfinished parts from the foundry follow a triangular distribution. Source times follow a normal distribution. The normal distribution was chosen because it is often used to model the distribution of a process which can be thought of as the sum of a number of component processes. Parts are assumed to move along linear paths between departments. Structural Assumptions: (Involve simplifications and abstractions from reality) Elements that would be common to both layouts and would not be dependent upon the plant layout were omitted. Breaks, shift changes, and equipment malfunctions would occur regardless of which plant was employed and were therefore not factored in the simulation. The plant operates 7 days a week for 3 shifts/day. A machinist is always available to transport the finished parts between stations. Parts wait a particular location until a specified number accumulates and then transported as one unit. Machines are considered to be “dedicated.”

Bob Devine & Ed Foerster “Simulation & Modeling” Term Project December 7, 1999 Model Conceptualization & Translation - Job Shop Data Assumptions: (Ideally based on the collection of reliable data and correct statistical analysis) Arrivals of unfinished parts from the foundry have the same arrival and service times distributions as the flow shop. Parts are assumed to move along linear paths between departments based on estimates of the proposed plant layout specified in the flow diagram. The time required to convert a machine over from processing gears to pistons and vice versa follows a normal distribution with a mean of 10 minutes and a standard deviation of 2 minutes. Structural Assumptions: (Involve simplifications and abstractions from reality) Same assumptions as the flow shop except: - Machining stations are no longer considered “dedicated.” - Pistons have a higher priority than gears.

Bob Devine & Ed Foerster “Simulation & Modeling” Term Project December 7, 1999 Data Collection Difficulties Encountered: 1. Unable to attain viable data for the desired manufacturing processes. 2. Data which was obtained from Niebels’ “Time and Motion Study” (1972) was specific: cutting times were based on factors such as the lubrication used, the type of material being cut, the number of revolutions per minute of the blade, and the feed rate of the material. 3. The summation of these “tolerances” would have compounded the estimation error which would be introduced by the assumption of a normally distributed processing time with a specified standard deviation. 4. Normal distribution was selected because it often used to model the distribution of a process which can be thought of as the sum of a number of component processes (mentioned earlier). 5. The triangular distribution was chosen to model the arrival time of parts from the foundry because this process was thought to be relatively constant plus or minus a small amount.

Bob Devine & Ed Foerster “Simulation & Modeling” Term Project December 7, 1999 Verification and Validation Validation is the overall process of comparing the model and its behavior with the real system. If the system is in the planning stages and no system operating data can be collected, complete input-output validation is not possible. (DESS, 410) An iterative process was employed to troubleshoot the model. The model was broken down into its constituent parts; yet, viable results were not achieved.

Bob Devine & Ed Foerster “Simulation & Modeling” Term Project December 7, 1999 Experimental Design Both models are considered to be non-terminating systems because they are trying to represent steady-state behavior. (DESS, 436) One simulation run consisting of 14 replications (R) with each being 336 hours in duration - Used the formulas for determining R for a terminating system from data points after 5 replications - justified. (DESS, 462) - Runs of 168, 336, and 672 hours used to simulate steady-state. - No change between 336 and 672 hours. Specifications: - 95% Confidence Interval - Standard Criterion = 0.005

Bob Devine & Ed Foerster “Simulation & Modeling” Term Project December 7, 1999 Conclusion Two models were compared: Flow Shop & Job Shop. Both models need further refinement. This is part of the iterative process of modeling. While it is essential to identify when your models accurately reflect reality, it is of equal importance to be cognizant of the fact when your models are somewhat flawed and are in need of further production runs and analysis.