NAIC Visiting Committee Meeting · February 19-21, 2007 Telescope Performance 2007 Visiting Committee Meeting Phil Perillat.

Slides:



Advertisements
Similar presentations
R4 Dynamically loading processes. Overview R4 is closely related to R3, much of what you have written for R3 applies to R4 In R3, we executed procedures.
Advertisements

Fundamentals of Radio Astronomy Lyle Hoffman, Lafayette College ALFALFA Undergraduate Workshop Arecibo Observatory, 2009 Jan. 12.
SupaRule Cable height meters Presented by: Gary Carroll Director Feb 2004.
Surveying I. Lecture 2..
Calibration Ron Maddalena NRAO – Green Bank November 2012.
CALICE WHCAL testbeam at SPS H8 27 sep – 03 oct: 6 days for energies up to 180 GeV (+ polarity)
NAIC AUSAC Meeting – April 19-20, 2010 Telescope and Datataking status 2010 Visiting Committee Meeting Phil Perillat.
AOUC committee 03APR14 Telescope status & RFI 2014 AOUC committee Phil Perillat.
Coaxial Measurements – Common Mistakes & Simple Solutions Sathya Padmanabhan Rocky Teresa Maury Microwave Corp. For electronic copy of presentation go.
NAIC AOUC Meeting – April 25-26, 2012 Telescope and Datataking status 2012 Visiting Committee Meeting Phil Perillat.
EH1 (AD 1&2, IWS, OWS) PMT Jul. 30 – Aug. 20 RollingGain Calibration Summary Zhe Wang (BNL) and Qing He (Princeton) Aug. 22, 2011.
Rick PerleyEVLA Advisory Committee Meeting December 14-15, EVLA Hardware Testing Rick Perley With much essential help from Barry Clark, Ken Sowinski,
Teachers workshop 21feb09 arecibo observatory The Arecibo radio telescope 2009 teachers workshop Phil Perillat.
1 N. Davidson E/p single hadron energy scale check with minimum bias events Jet Note 8 Meeting 15 th May 2007.
Using ALFA for ALFALFA Martha Haynes, Cornell University 2005 ALFALFA Undergraduate Workshop.
Sz. Rózsa: Surveying I. – Lecture 1
1 CTIS # Prepared By John Yurtin Updated Connection Systems Training Vibration & Fretting Corrosion Vibration.
Climate quality data and datasets from VOS and VOSClim Elizabeth Kent and David Berry National Oceanography Centre, Southampton.
Activity 1: The Rotating Earth
Advanced MWA tile beam models Randall Wayth – ICRAR/Curtin University.
April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review Instrumentation K. Constantikes.
Spectral Line Calibration Techniques with Single Dish Telescopes K. O’Neil NRAO - GB.
GBT Spectral Baselines – Tuesday, 11 March 2003 GBT Spectral Baseline Investigation Rick Fisher, Roger Norrod, Dana Balser (G. Watts, M. Stennes)
ALFA Surveys Workshop: december 2009 CIMA STATUS Rfi update 2009 ALFA Surveys Workshop Phil Perillat.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Emmanuel Momjian (NRAO)
NAIC AUSAC Committee Meeting · March Telescope Performance and Datataking 2009 AUSAC Committee Meeting Phil Perillat.
Calibration Ron Maddalena NRAO – Green Bank July 2009.
Tenth Summer Synthesis Imaging Workshop University of New Mexico, June 13-20, 2006 Antennas in Radio Astronomy Peter Napier.
P.Napier, Synthesis Summer School, 18 June Antennas in Radio Astronomy Peter Napier Interferometer block diagram Antenna fundamentals Types of antennas.
Norm Nelson, UCSB Chantal Swan, UCSB / ETH with assistance of: Julia Gauglitz, Teresa Serrano Catala, Erica Aguilera UltraPath in the Oligotrophic Ocean.
NAIC Visiting Committee Meeting February 15-16, 2005 Telescope Performance Pointing the telescope. Gain curves for all receivers Recent high frequency.
Spectral Line Calibration Techniques with Single Dish Telescopes K. O’Neil NRAO - GB.
LBT Progress Report, Feb Marco Xompero 1/14 P45 Test Results and beyond… Marco Xompero Daniela Zanotti Armando Riccardi.
PACS NHSC SPIRE Point Source Spectroscopy Webinar 21 March 2012 David Shupe, Bernhard Schulz, Kevin Xu on behalf of the SPIRE ICC Extracting Photometry.
COMPTON POLARIMETRY Collected data Cavity power Status on counting methods Systematic errors and hardware issues.
Lyot Stop Focal Plane Mask OAP3 Out of plane spherical mirror.
APRPP review committee 24oct13 Telescope status 2013 APRPP review committee Phil Perillat.
NAIC Visiting Committee Meeting · April Telescope Performance and Datataking 2009 Visiting Committee Meeting Phil Perillat.
Extragalactic Absorption Lines Observed from Arecibo Chris Salter (National Astronomy & Ionosphere Center, Arecibo Observatory, Puerto Rico)
IP-BPM status Siwon Jang KNU. Contents The electronics repair status –Repair work status –Electronics RF test (by using Oscilloscope) –Electronics shipment.
The Arecibo Legacy Fast ALFA Drift Survey (ALFALFA/VAVA) and E-ALFA Data Processing Overview Overview Riccardo Giovanelli GALFA/Aug 2004.
The Telescope (pointing) Pointing background Current pointing errors. Some problems with pointing. Can we point during the painting project. For more info:
Thoughts on the Design of a WVR for Alan Roy (MPIfR) the Twin Telescope at Wettzell.
Attenuation measurement with all 4 frozen-in SPATS strings Justin Vandenbroucke Freija Descamps IceCube Collaboration Meeting, Utrecht, Netherlands September.
Calibration You never know – it might be important.
The 25 ‑ m f /0.7 primary mirror for the Giant Magellan Telescope (GMT) is made of seven 8.4 ‑ m segments in a close packed array. Each of the off-axis.
GALFA Test Observations & Plans (A1943)  Testing GALFA Spectrometer  Mapping modes: Basketweave scanning (JOSH’s TALK) & drift/driven mapping.  Observing.
AUSAC Meeting March 2-3, 2005 Telescope Performance Pointing the telescope. Gain curves for all receivers Reflector alignment Recent high frequency results.
MICE Target Failure UKNFIC Meeting Adam Dobbs - when and why 4 th July 2008.
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Task Group Session on Revised.
20 June 2006 Green Bank GBT Performance Dana S. Balser.
Cosmic Origins Spectrograph November 13, 2003 Page 1 “Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public.
Rick PerleyEVLA Feeds CDR 17 February Performance of the L-Band Feed Rick Perley.
January 6, 2005 URSI Nation Radio Science Meeting, Boulder, CO. Pointing and Focusing the GBT K. T. Constantikes NRAO Green Bank.
Analysis of GALFACTS Data for the Study Of Variable Radio Sources Scott Barenfeld 1, Tapasi Ghosh 2, Chris Salter 2 1 NAIC/University of Rochester, 2 NAIC.
EVN Amplitude Calibration Iván Agudo. Quality of Calibration EVN Amplitude Calibration, Iván Agudo (JIVE) EVN TOG Meeting, Cagliari, Italy,
13,14 July 2005 Feasibilty/Concept Study Mid Term Status Review Telescope Mount Concept Vertex RSI.
DVAC PROGRESS OFFSET GREGORIAN DISH (DVAC-1) 郑元鹏 (Yuanpeng Zheng ) Joint Lab. for Radio Astronomy and Technology MAY 29, 2012.
Circular Pointing Scans
Introduction to Using Radio Telescopes
Data Reduction and Analysis Techniques
Data Reduction and Analysis Techniques
Current GBT Performance
2006 ALFALFA Undergraduate Workshop
Metrology Improves Pointing at 12m ALMA Telescopes
Phil Appleton based on material from a study by Roland Vavrek (ESAC)
Telescope Performance and Datataking
Pulsar Data II Single-Pulse Plots
Pulsar Data II Single-Pulse Plots
Author: Skip Crilly GBO volunteer First rev 11/6/2014
Presentation transcript:

NAIC Visiting Committee Meeting · February 19-21, 2007 Telescope Performance 2007 Visiting Committee Meeting Phil Perillat

NAIC Visiting Committee Meeting · February 19-21, 2007 Talk Outline Pointing –Specs and how we point –Current pointing Errors –Pointing related issues. Telescope Gain and T SYS –Current gain for lband and cband –Alfa T SYS and calibration diode stability. More info:

NAIC Visiting Committee Meeting · February 19-21, 2007 Motion: –Radius of curvature:870’, paraxial surface:435’ –1/8” motion in paraxial surface = 5 arcsec error. –1 lambda motion along focus = 3 db gain loss. –5 deg F moves the platform 1 inch vertically. –24 kips lowers platform 1” (td’s left alone). Assuming tiedowns not returned to original tension. Receiver beamwidths: –Lband 200 asecs, Xband: 30 asecs Pointing specs

NAIC Visiting Committee Meeting · February 19-21, 2007 How we point Tiedowns and distomats. –Remove temperature variability. –Tiedowns have 24” stroke, 120 kips max tension per tiedown. Pointing model. –Removes repeatable errors caused by deflections and misalignments. –New model takes 10 days (nights) tracking 20 sources rise to set.

NAIC Visiting Committee Meeting · February 19-21, 2007 Pointing errors Date Az Err (arcsec) Za Err (arcsec) Total Err (arcsec) Dec06 to Feb Historical/current pointing errors from previous models

NAIC Visiting Committee Meeting · February 19-21, 2007 Pointing issues 2005 distomat failures – Failing 10 to 20% of the time –Platform height adjustment needs all 6 distomats. –New type of distomat window solved the problem. Azimuth encoder failures. –Corrosion inside encoders causing failures. –Switched to encoders with better seals (after overcoming rfi problems). People who do the actual work: –Jorge Rodriguez & Hector Camacho

NAIC Visiting Committee Meeting · February 19-21, 2007 Tiedown cables losing tension This can occur when: –Azimuth arm points at tower, dome at high za, and temp > 80F. –Incorrect platform tilt causes a pointing error. Example 1: 2004 calibration run shows size of error –10am, za=16.5, az=155, temp. 84 F. Errs > 1 arcmin. Example 2: 13sep06 ALFA meridian nodding. – 9am, 83F. Tension loss occurred on at least 7 days of this project. Solution to cable tension loss: –Tertiary mirror position controlled by 5 motors (in progress) –Normal tertiary position (where pointing model made). –Alternate position with longer optical path for warm weather. –Increases dynamic range of cable tension.

NAIC Visiting Committee Meeting · February 19-21, 2007 Recent System Performance Data taken Dec06 through Feb07. Lband (1400 Mhz) and Cband (5000 Mhz) –Gain (K/Jy) –SEFD (Jy) System Equivalent Flux Density When comparing two receivers, SEFD is not biased by errors in the calibration diode values. – T SYS (K) –BeamWidths (Arcseconds)

NAIC Visiting Committee Meeting · February 19-21, 2007 ALFA T SYS 2005 to 2007 ALFA spectral line data archived online and accessible via idl routines. ALFALFA cal measurements 2005 thru 2007 used to check ALFA T SYS and calibration diode stability. –Data taken in drift scan mode at the meridian. –10,000+ measurements (1 per 10 minute strip) –T SYS Vs. sample –Normalized T SYS Vs. sample –T SYS Vs. RA (right ascension) –T SYS A/T SYS B ratio Vs. sample

NAIC Visiting Committee Meeting · February 19-21, 2007 Summary STATUS –Current pointing of 7” is still useable. –Lband SEFD=2.5 Jy. –Cband SEFD=2.9 Jy. GBT SEFD: 25K/1.75Jy=14.3 Jy. ALFA T SYS (and calibration diode values) have not been jumping by large amounts. TO COMPLETE: –Make new model after painting. –Tertiary control will help solve the pointing problem when the tiedown cables go loose.