ARIES Studies L.M. Waganer 18 Sept 00/Page 1 Power Core Maintenance Approach and Maintainability Analysis By L. M. Waganer The Boeing Company For the ARIES.

Slides:



Advertisements
Similar presentations
Agenda of Week X. Layout Capacity planning Process selection Linebalancing Review of week 9 13 Approaches Purposes : Finishing the capacity planning Understanding.
Advertisements

1 Copyright Electric Power Research Institute 2008 Steam Turbine-Generator Guidelines Quick Start VolumeContent 1General Practices Condition assessment,
TORE SUPRA Association EURATOM-CEA 1 TORE SUPRA Association EURATOM-CEA Julien WAGREZ EFDA GOTP - ITER PPE WP2 1 juin 2009 EFDA ITER - Goal Oriented Training.
Frame design Status TB-SWG May 2005 Presented by K. Ioki Prepared by M. Morimoto VV and Blanket Division, ITER Garching ITER.
Steam Generation – Operational Flexibility and Lifetime Extension Considerations Kevin Murray Senior Integrity Engineer Marsh Power Forum – Istanbul, October.
First Wall Heat Loads Mike Ulrickson November 15, 2014.
ACADs (08-006) Covered Keywords Pressurized Water Reactor (PWR), Boiling Water Reactor (BWR), primary loop, reactivity, reactivity control, reactivity.
April 23-24, 2009/ARR 1 Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL A. René Raffray, Siegfried Malang, Xueren Wang University of California,
Siemens Applied Automation Process Gas Chromatography NeSSI – Lets Do It.pptSlide 1; IFPAC; February 22, 2006 Let’s Do It! Using NeSSI IFPAC: February.
1 Failure modes, effects and rates and remote maintenance/downtime Introduction –Failure is defined as the ending of the ability of a design element to.
One powerful future. Maintenance Considerations for Emergency Power Systems Ben Thomas Customer Services Manager.
A Neutrino Factory Target Station Design based on Solid Targets J. R. J. Bennett STFC, Rutherford Appleton Laboratory, Harwell Science.
ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 1 How to Achieve High Reliability, Availability, and Maintainability L. Waganer June 2007.
Coolant Connections to the DCLL Blanket S. Malang, Dara Navaei, Xueren Wang ARIES Project MeetingARIES Project MeetingUCSD January 23-24, 2012January 23-24,
1 EFET EWIV European Fusion Engineering and Technology Balance of Plant Requirements and Concepts for Tokamak Reactors Edgar Bogusch EFET / Framatome ANP.
September 15-16, 2005/ARR 1 Status of ARIES-CS Power Core and Divertor Design and Structural Analysis A. René Raffray University of California, San Diego.
1/11 Maintenance Scheme for Post-ITER Power Reactors S.NISHIO for Reactor Design Team JAERI ; Naka Fusion Research Establishment Naka-machi, Naka-gun Ibaraki-ken.
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintenance and Building Conceptual Approach L. M. Waganer The Boeing Company ARIES Meeting University.
Page 1 of 14 Reflections on the energy mission and goals of a fusion test reactor ARIES Design Brainstorming Workshop April 2005 M. S. Tillack.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
ARIES-AT Study L. M. Waganer 3 May 2000 Status of Vacuum Vessel Design L. Waganer 3 May 2000 ARIES Conference Call.
November 4-5, 2004/ARR 1 ARIES-CS Power Core Options for Phase II and Focus of Engineering Effort A. René Raffray University of California, San Diego ARIES.
Advanced Manufacturing and Power Core Maintainability
Status of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray ARIES Meeting PPPL, NJ Sept.
Update of the ARIES-CS Power Core Configuration and Maintenance X.R. Wang S. Malang A.R. Raffray and the ARIES Team ARIES Meeting Madison, Wisconsin September.
Lesson 15 Heat Exchangers DESCRIBE the difference in the temperature profiles for counter-flow and parallel flow heat exchangers. DESCRIBE the differences.
ARIES-IFE Study L. M. Waganer, June 7, 2000 Page 1 Considerations of HI Beam and Vacuum System Arrangement L. Waganer The Boeing Company 7 June 2001 ARIES.
FNSF Maintenance and Research Strategy Siegfried Malang and Mohamed Abdou FNST Meeting held at UCLA, August 3, 2010.
Maintenance Schemes for a DEMO Power Plant and related DCLL Designs Siegfried Malang 2 nd EU-US DCLL Workshop2 nd EU-US DCLL Workshop University of California,University.
Isograph Reliability Software RiskVu V3. Isograph Reliability Software ESSM – The first risk monitor ? Essential Systems Status Monitor Installed at Heysham.
ARIES -AT Study L.M. Waganer ARIES 3/20-21/00 Page1 ARIES-AT Vacuum Vessel Design Approach L. M. Waganer The Boeing Company 20 March 2000 UCSD San Diego,
3D Finite Element Analysis for Ribbed Structure Vacuum Vessel By: Hamed Hosseini Advisor: Prof. Farrokh Najmabadi.
© 2008 Data Power Services, LLC By: Tom Taranto 2010 Energy Expo Hosted by National Grid NYSERDA Reducing Compressed Air Energy Cost Using a Systems Approach.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 1 Agenda Kick Off Meeting of the contract EFDA-ENEA 05/ Task TW5-SEA 4.2 “Update Failure Mode and Effect.
Page 1 of 11 An approach for the analysis of R&D needs and facilities for fusion energy ARIES “Next Step” Planning Meeting 3 April 2007 M. S. Tillack ?
ARIES Project Meeting, L. M. Waganer, Dec 2007 Page 1 Restructuring System Cost Accounts and Algorithms L. Waganer December 2007 ARIES Project.
Kevin Burgee Janiqua Melton Alexander Basterash
10/25/2015 IENG 471 Facilities Planning 1 IENG Lecture Schedule Design: The Sequel.
The Proposed Materials Test Station at LANSCE Eric Pitcher Los Alamos National Laboratory Presented at the Workshop on High-Power Targetry for Future.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
RAMI Requirements for DEMO, Gaps, and Thrusts 03 March 2009 RAMI Panel Members: Mohamed Abdou (UCLA), Tom Burgess (ORNL), Lee Cadwallader (INL), Wayne.
HL-LHC Annual Meeting, November 2013HQ Planning – G. Sabbi 1 HQ Status and Plans G. Sabbi High Luminosity LHC Annual Meeting Daresbury, UK, November 11-14,
INTEGRATING RELIABILITY, AVAILABILITY, MAINTAINABILITY (RAM) AND SUPPORTABILITY IN REQUIREMENTS Bernard Price Certified Professional Logistician ACHIEVING.
Programmatic issues to be studied in advance for the DEMO planning Date: February 2013 Place:Uji-campus, Kyoto Univ. Shinzaburo MATSUDA Kyoto Univ.
Idaho RISE System Reliability and Designing to Reduce Failure ENGR Sept 2005.
ARIES- ACT, 21-22May 2013, Germantown, MD Page 1 L. Waganer Consultant for ARIES Project / UCSD / DOE ARIES Project Meeting May 2013 Hampton Inn,
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
ARIES- Pathways, October 25-26, 2010 Bethesda, MD Page 1 L. Waganer Consultant for The Boeing Company ARIES-Pathways Project Meeting October 2010.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Page 1 HFP Workshop, RAMI Session, 2-4 Mar 2009k,UCLA Why Is Reliability, Availability, Maintainability, and Inspectability Important to the Future of.
ARIES- ACT, Sept, 2012, Bethesda, MD Page 1 L. Waganer Consultant for ARIES Project / UCSD / DOE ARIES Project Meeting September 2012 Bethesda,
ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 1 Maintenance and Building Conceptual Approach L. Waganer and R. Peipert The Boeing Company 4 October.
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintainability and Availability Analyses L. M. Waganer The Boeing Company ARIES Meeting University.
FIRE Engineering John A. Schmidt NSO PAC Meeting February 27, 2003.
December 13, 2006 Blanket and Shield Design Considerations for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M. Sawan (UW), A.R. Raffray.
Water is the Natural Choice Hydronic Comfort Systems Increase and Maintain Building Efficiency For the Life of Your Building
Teknologi Pusat Data 12 Data Center Site Infrastructure Tier Standard: Topology Ida Nurhaida, ST., MT. FASILKOM Teknik Informatika.
Mu2e Mu2e Remote Handling Review Comparisons: Costs, Risks & Maintainability Ryan Schultz Deputy L3 Manager Target Station 3/3/2015.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
1 Target Station Design Dan Wilcox February 2012.
Maintenance strategies
Description of Thin Liquid Wall Protection w/Porous Walls
X.R. Wang, M. S. Tillack, S. Malang, F. Najmabadi and the ARIES Team
Operations Technical Working Group
Pressurized Water Reactor
Trade-Off Studies and Engineering Input to System Code
Reactor Building Concept Assessment
University of California, San Diego
Presentation transcript:

ARIES Studies L.M. Waganer 18 Sept 00/Page 1 Power Core Maintenance Approach and Maintainability Analysis By L. M. Waganer The Boeing Company For the ARIES Project Meeting 18 September 2000

ARIES Studies L.M. Waganer 18 Sept 00/Page 2 Operational MTTR* Is Critical A new power plant must have high availability to be competitive (< %) Includes both scheduled and unscheduled outages Duration of outages are defined as MTTR/MTBF –MTTR = Mean Time To Repair, MTBF = Mean Time Between Failure Plant must be designed for high maintainability –Modular power core sector replacement –Simple coolant and mechanical connections –Highly automated maintenance operations –Design building for remote maintenance Sectors can be refurbished off-line –Better inspection means higher reliability

ARIES Studies L.M. Waganer 18 Sept 00/Page 3 Criteria for Maintenance Approach Reduce operational maintenance time Improve reliability of replacement sector Reduce cost (size) of building Reduce cost of maintenance equipment Reduce the cost of spares Reduce the volume of irradiated waste Reduce contamination from dust and debris Must apply to scheduled and unscheduled maintenance Increase reliability of maintenance operations (“failsafe” maintenance) List does not imply priority

ARIES Studies L.M. Waganer 18 Sept 00/Page 4 ARIES-AT Maintenance Options Being Assessed In-situ maintenance (not baseline approach) –All maintenance conducted inside power core Replacement in corridor, hot structure returned –Life-limited components replaced in corridor, exo-core Replace with refurbished sector from hot cell –(A) Bare sector transport –(B) Wrapped sector transport –(C) Sector moved in transporter (ala ITER)

ARIES Studies L.M. Waganer 18 Sept 00/Page 5 Example of AT Sector Replacement Basic Operational Configuration Withdrawal of Power Core Sector with Limited Life Components Cross Section Showing Maintenance Approach Plan View Showing the Removable Section Being Withdrawn

ARIES Studies L.M. Waganer 18 Sept 00/Page 6 Sector Removal Remote equipment is designed to remove shields and port doors, enter port enclosure, disconnect all coolant and mechanical connections, connect auxiliary cooling, and remove power core sector

ARIES Studies L.M. Waganer 18 Sept 00/Page 7 Compare Frequency of Power Core Maintenance Actions (Based on a power core lifetime of 4 FPY) Fraction of Core Replaced FrequencyAssessmentRecommendation 1/4 of core (4 sectors) 12 m/availabilityYearly maintenance is feasible. Cooldown and start up durations will be detrimental to availability goals. Requires minimal number of hot maintenance spares. Too frequent. 1/3 of core (5 or 6 sectors) 16 m/availabilityVery similar to annual. Fixed tasks continue to be a major factor of outage time. Requires small number of high temperature structure spares. Maintain BOP every other cycle. #2 choice 1/2 of core (8 sectors) 24 m/availabilityProbably will match up well with BOP major repair. Requires eight sets of spare hot structures. #1 choice Entire core (16 sectors) 48 m/availabilityThis four-year frequency also might be well matched with the BOP major repairs. Requires a large number of spare hot structures and maintenance equipment. Probably would yield highest availability. #3 choice

ARIES Studies L.M. Waganer 18 Sept 00/Page 8 Compare Coolant System Maintenance for Corridor and Hot Cell Approaches Both approaches have same number of coolant plumbing connections, but the blanket to hot shield can be disconnected and reconnected off line for the hot cell approach. The hot cell approach would be faster and would assure a more reliable refurbished sector. Summary of Corridor Maintenance Connections Summary of Hot Cell Maintenance Connections

ARIES Studies L.M. Waganer 18 Sept 00/Page 9 Comparison of Maintenance Approaches Corridor Advantages Less spares Reduced irradiated waste Scoring: 0 = Lowest, 4 = Highest Hot Cell Advantages Faster online replacement Higher sector reliability Better contamination control Applicable to both scheduled and unscheduled maintenance

ARIES Studies L.M. Waganer 18 Sept 00/Page 10 Compare Transport Approaches Totals Little discernible difference between approaches due to lack of definition Criteria stresses maintenance time and contamination control Selected cask enclosed as baseline approach based on safety considerations Nearly Equal Little to no contamination control MAXIMUM SCORE

ARIES Studies L.M. Waganer 18 Sept 00/Page 11 Impact of Power Core Maintenance On Building Configuration Bioshield (2.6-m-thick) is incorporated into building inner wall Building wall radius determined by transporter length + clear area access Extra space provided at airlock to assure that docked cask does not limit movement of other casks

ARIES Studies L.M. Waganer 18 Sept 00/Page 12 Power Core Removal Sequence Cask contains debris and dust Vacuum vessel door removed and transported to hot cell Core sector replaced with refurbished sector from hot cell Vacuum vessel door reinstalled Multiple casks and transporters can be used

ARIES Studies L.M. Waganer 18 Sept 00/Page 13 Fixed Maintenance Times for Power Core Shutdown Timeline Startup Timeline Dominated by cooldown of systems and core Assumes streamlined processes for core evacuation, bakeout, and coolant fills

ARIES Studies L.M. Waganer 18 Sept 00/Page 14 Repetitive Maintenance Times for Replacement of a Single Power Core Sector Assumes a single cask and transporter Defines major maintenance activities Assumes all removal and replacement activities are remote and automated Repetitive actions require less than 1.5 days

ARIES Studies L.M. Waganer 18 Sept 00/Page 15 Maintenance Times for Replacing Different Number of Sectors One cask and one transporter The equivalent maintenance days per operating year (FPY) will be used to determine if this maintenance scheme can achieve the necessary plant availability.

ARIES Studies L.M. Waganer 18 Sept 00/Page 16 Multiple Sets of Casks and Transporters Can Improve Times At least two sets should be used for redundancy (4.23 equivalent d/y) Availability improvements by larger numbers of casks and transporters probably would not justify added cost Equivalent Annual Maintenance Times for Multiple Sets

ARIES Studies L.M. Waganer 18 Sept 00/Page 17 Need to Establish Availability Goals Consistent with Energy Community All reasonably new electricity-generating plants are now operating in the 85-90% class In years, state-of-the-art will be 90+% Separate power plant into three parts –Balance of Plant (buildings, turbine-generators, electric plant, and miscellaneous equipment) –Reactor Plant Equipment (main heat transport, auxiliary cooling, radioactive waste, and I&C) –Power Core

ARIES Studies L.M. Waganer 18 Sept 00/Page 18 Allocate Availability Goals System Group Avail Goal Annual Days –BOP –RPE –Power Core Total Power Plant0.900~ 39.3 The Annual Maintenance Days shown above represent both scheduled and unscheduled time. Assume equal times for both actions.

ARIES Studies L.M. Waganer 18 Sept 00/Page 19 Power Plant Maintenance Times Allowable power core scheduled time is d/FPY (1/2 of d/FPY total) Two casks and two transporters can exchange 1/2 the core in h (8.47 d) every other year Total power core replacement requires d/FPY or 4.23 d/FPY This leaves an allowance of d/FPY d/FPY or 6.05 d/FPY for other scheduled maintenance of other power core systems that do not correspond to the bi-annual replacement period.

ARIES Studies L.M. Waganer 18 Sept 00/Page 20 The ARIES-AT Power Plant Should Be Able To Achieve 90% Availability

ARIES Studies L.M. Waganer 18 Sept 00/Page 21 Summary of Maintainability Approach and Availability Analysis Approach addresses the need to quickly accomplish remote maintenance in a safe and responsible manner Reasonable timelines are postulated for a highly automated maintenance system Power core availability goals should be attainable with a margin