10-1 © Prentice Hall, 2004 Chapter 10: Selecting the Best Alternative Design Strategy Plus Project Management Concepts.
Advertisements

Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Investigating and Determining System Requirements
Chapter 2 The Origins of Software
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Unit 8 Design Strategies and Refactoring. Key Concepts Design strategy deliverables Requirements and constraints Outsourcing Sources of software Platform.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 7.1.
Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1.
7.1 DESIGN OVERVIEW: SELECTING DESIGN ALTERNATIVES IMS Systems Analysis and Design.
Lecture 6 Generating and Selecting Design Alternatives IMS1002 /CSE1205 Systems Analysis and Design.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 7.1.
Chapter 2 The Origins of Software Modern Systems Analysis and Design Seventh Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
CHAPTER 9: Structuring System Requirements: Conceptual Data Modeling Conceptual Data Modeling 1.1 MSIS 5653 Advanced Systems Development Dursun Delen,
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Acquiring Information Systems and Applications
Chapter 2 The Origins of Software
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
Chapter 2 The Origins of Software
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Chapter 2 The Origins of Software Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
Chapter 2 The Origins of Software Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
Chapter 2 The Origins of Software Modern Systems Analysis and Design.
Source: J. Hoffer ,J. George, J. Valacich
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
Chapter 4 Identifying and Selecting Systems Development Projects
© 2005 by Prentice Hall 2-1 Chapter 2 The Origins of Software Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F. George Joseph.
R McFadyen Chapter 10 Selecting the Best Alternative Design Strategy.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 7 Structuring System Requirements: Conceptual Data Modeling 7.1.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 3 Systems Planning and Selection 3.1.
Systems Analysis Requirements Determination Requirements Structuring
Chapter 2 The Origins of Software Modern Systems Analysis and Design Fifth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
Selecting the Best Alternative Class 19. SDLC Project Identification & Selection Project Initiation & Planning Analysis *** Logical Design Physical Design.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 11 Selecting.
Chapter 2 The Origins of Software Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich created by Mr.Mohammed.
Chapter 2 The Origins of Software Modern Systems Analysis and Design Fifth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
10-1 © Prentice Hall, 2004 Chapter 10: Selecting the Best Alternative Design Strategy Object-Oriented Systems Analysis and Design Joey F. George, Dinesh.
Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1.
Cis339 Chapter 2 The Origins of Software 2.1 Modern Systems Analysis and Design Fifth Edition.
8-1 © Prentice Hall, 2007 Topic 8: Selecting the Best Alternative Design Strategy Object-Oriented Systems Analysis and Design Joey F. George, Dinesh Batra,
Chapter 4 Identifying and Selecting Systems Development Projects Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 11 Selecting.
Chapter 4 Identifying and Selecting Systems Development Projects Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
Chapter 11 Selecting the Best Alternative Design Strategy Modern Systems Analysis and Design Third Edition 11.1.
Selecting the Best Alternative Design Strategy. Two basic steps 1.Generate a comprehensive set of alternative design strategies 2.Select the one design.
Lecture 2 The Sources of Software. Copyright © 2011 Pearson Education, Inc. 2 Chapter 2 Introduction There are various sources of software for organizations.
2-1 Chapter 2 The Origins of Software Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
Chapter 2 The Origins of Software
Chapter 2 The Sources of Software
Chapter 2 The Origins of Software
Chapter 7 Structuring System Requirements: Conceptual Data Modeling
Chapter 2 The Origins of Software
Chapter 2 The Origins of Software
Modern Systems Analysis and Design Third Edition
Modern Systems Analysis and Design Third Edition
Chapter 11 Selecting the Best Alternative Design Strategy
Chapter 7 Selecting the Best Alternative Design Strategy
Chapter 2 The Origins of Software
Chapter 7 Structuring System Requirements: Conceptual Data Modeling
Modern Systems Analysis and Design Third Edition
Chapter 11 Selecting the Best Alternative Design Strategy
Modern Systems Analysis and Design Third Edition
Presentation transcript:

Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter 7 Selecting the Best Alternative Design Strategy 7.1

Learning Objectives Describe different sources of software Learn to assemble the various pieces of an alternative design strategy Learn how to generate at least three alternative design strategies Discuss selecting the best design strategy using both qualitative and quantitative methods 7.2

Learning Objectives Learn how to use the results of the analysis phase to update a Baseline Project Plan (BPP) Discuss design strategies and how they are applied to the Internet 7.3

Selecting the Best Alternative Design Strategy Two basic steps 1.Generate a comprehensive set of alternative design strategies 2.Select the one design strategy that is most likely to result in the desired information system Process Divide requirements into different sets of capabilities Enumerate different potential implementation environments that could be used to deliver the different sets of capabilities Propose different ways to source or acquire the various sets of capabilities for the different implementation environments 7.4

Selecting the Best Alternative Design Strategy Deliverables 1. At least three substantially different system design strategies for building the replacement information system 2. A design strategy judged most likely to lead to the most desirable information system 3. A Baseline Project Plan (BPP) for turning the most likely design strategy into a working information system 7.5

Generating Alternative Design Strategies Best to generate three alternatives Low-end  Provides all required functionality users demand with a system that is minimally different from the current system High-end  Solves problem in question and provides many extra features users desire Midrange  Compromise of features of high-end alternative with frugality of low-end alternative 7.6

Drawing Bounds on Alternative Designs Minimum Requirements Mandatory features versus desired features Forms of features  Data  Outputs  Analyses  User expectations on accessibility, response time and turnaround time Constraints on System Development Time Financial Legal Dynamics of the problem 7.7

Issues to Consider in Generating Alternatives Outsourcing The practice of turning over responsibility of some to all of an organization’s information systems applications and operations to an outside firm Can provide a cost-effective solution 7.8

Issues to Consider in Generating Alternatives Sources of Software Hardware manufacturers Packaged software producers Custom software producers Enterprise solution software In-house development 7.9

Criteria for Choosing Off-the-Shelf Software Cost In-house versus purchased Functionality Mandatory, essential and desired features Vendor Support Installation Training Technical Support Viability of Vendor 7.10

Criteria for Choosing Off-the-Shelf Software Flexibility Ease of customization Documentation User documentation Technical documentation Response Time Ease of Installation 7.11

7.12

Validating Purchased Software Information Information from vendor Software evaluation period Customer references from vendor Independent software testing service Trade publications 7.13

Hardware and Software Issues Existing Platform 1.Lower costs 2.Information system staff is familiar with operation and maintenance 3.Increased odds of successfully integrating system with existing applications 4.No added costs of converting old systems to new platform or transferring data New Hardware and System Software 1.Some software components will only run on new platform 2.Developing system for new platform gives organization opportunity to upgrade technology holdings 3.New requirements may allow organization to radically change its computing operations 7.14

Hardware and Software Issues Request for Proposal (RFP) A document provided to vendors to ask them to propose hardware and system software that will meet the requirements of your new system 7.15

Implementation Issues Technical and social aspects of implementation need to be addressed Training Disruption of work 7.16

Hoosier Burger’s New Inventory Control System Replacement for existing system Figure 7-4 ranks system requirements and constraints 7.17

7.18

Hoosier Burger’s New Inventory Control System Figure 7-5 shows steps of current system When proposing alternatives, the requirements and constraints must be considered 7.19

7.20

Hoosier Burger’s New Inventory Control System Figure 7-7 lists 3 alternatives Alternative A is a low-end proposal Alternative C is a high-end proposal Alternative B is a midrange proposal 7.21

7.22

Hoosier Burger’s New Inventory Control System Selecting the most likely alternative Weighted approach can be used to compare the three alternatives Figure 7-8 shows a weighted approach for Hoosier Burger Left-hand side of table contains decision criteria  Constants and requirements  Weights are arrived at by discussion with analysis team, users and managers Each requirement and constraint is ranked  1 indicates that the alternative does not match the request well or that it violates the constraint  5 indicates that the alternative meets or exceeds requirements or clearly abides by the constraint 7.23

7.24

Hoosier Burger’s New Inventory Control System Selecting the most likely alternative According to the weights used, alternative C appears to be the best choice 7.25

Updating the Baseline Project Plan (BPP) The Baseline Project Plan (BPP) was developed during systems planning and selection phase Baseline Project Plan (BPP) can be used as an outline of a status report at analysis phase Schedule will be updated to reflect actual activities and durations An oral presentation of project status is typically made at this phase 7.26

Electronic Commerce Application: Selecting the Best Alternative Design Strategy Pine Valley Furniture WebStore Requirements and constraints were compiled by consultant and team (see Table 7-6) 7.27

7.28

Electronic Commerce Application : Selecting the Best Alternative Design Strategy Proposed system is a scalable, three-tier approach  Scalable The ability to seamlessly upgrade the system through either hardware upgrades, software upgrades or both  Three-tier Web Server Provides connection to the Internet and presentation of HTML page Applications Server Middle layer of software and hardware that lies between Webserver and corporate network Corporate network Existing organizational computing infrastructure 7.29

7.30

Summary Sources of Software Identifying requirements and constraints Generating alternative design strategies Selecting the best design strategy Updating a Baseline Project Plan (BPP) Selecting the best design strategy for Internet applications 7.31