Presentation is loading. Please wait.

Presentation is loading. Please wait.

Chapter 7 Selecting the Best Alternative Design Strategy

Similar presentations


Presentation on theme: "Chapter 7 Selecting the Best Alternative Design Strategy"— Presentation transcript:

1 Chapter 7 Selecting the Best Alternative Design Strategy
Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter 7 Selecting the Best Alternative Design Strategy 7.1 Copyright 2006 Prentice-Hall, Inc.

2 Copyright 2006 Prentice-Hall, Inc.
Learning Objectives Learn to assemble the various pieces of an alternative design strategy. Learn how to generate at least three alternative design strategies. Discuss selecting the best design strategy using both qualitative and quantitative methods. 7.2 Copyright 2006 Prentice-Hall, Inc.

3 Learning Objectives (continued)
Learn how to use the results of the analysis phase to update a Baseline Project Plan (BPP). 7.3 Copyright 2006 Prentice-Hall, Inc.

4 Selecting the Best Alternative Design Strategy
Two basic steps: Generate a comprehensive set of alternative design strategies Select the one design strategy that is most likely to result in the desired information system Process: Divide requirements into different sets of capabilities Enumerate different potential implementation environments that could be used to deliver the different sets of capabilities Propose different ways to source or acquire the various sets of capabilities for the different implementation environments 7.4 Copyright 2006 Prentice-Hall, Inc.

5 Selecting the Best Alternative Design Strategy(continued)
Deliverables At least three substantially different system design strategies for building the replacement information system A design strategy judged most likely to lead to the most desirable information system A Baseline Project Plan (BPP) for turning the most likely design strategy into a working information system 7.5 Copyright 2006 Prentice-Hall, Inc.

6 Generating Alternative Design Strategies
Best to generate three alternatives: Low-End Provides all required functionality users demand with a system that is minimally different from the current system High-End Solves problem in question and provides many extra features users desire Midrange Compromise of features of high-end alternative with frugality of low-end alternative 7.6 Copyright 2006 Prentice-Hall, Inc.

7 Drawing Bounds on Alternative Designs
Minimum Requirements Mandatory features versus desired features Forms of features Data Outputs Analyses User expectations on accessibility, response time, and turnaround time 7.7 Copyright 2006 Prentice-Hall, Inc.

8 Drawing Bounds on Alternative Designs (continued)
Constraints on System Development: Time Financial Elements of current system that cannot change Legal Dynamics of the problem 7.8 Copyright 2006 Prentice-Hall, Inc.

9 Criteria for Choosing Off-the-Shelf Software
Cost In-house versus purchased Functionality Mandatory, essential, and desired features Vendor Support Installation Training Technical support Viability of Vendor 7.9 Copyright 2006 Prentice-Hall, Inc.

10 Criteria for Choosing Off-the-Shelf Software (continued)
Flexibility Ease of customization Documentation User documentation Technical documentation Response Time Ease of Installation 7.10 Copyright 2006 Prentice-Hall, Inc.

11 Copyright 2006 Prentice-Hall, Inc.
7.11 Copyright 2006 Prentice-Hall, Inc.

12 Validating Purchased Software Information
Information from Vendor Software Evaluation Period Customer References from Vendor Independent Software Testing Service Trade Publications 7.12 Copyright 2006 Prentice-Hall, Inc.

13 Hardware and Software Issues
Existing Platform Lower costs Information system staff is familiar with operation and maintenance Increased odds of successfully integrating system with existing applications No added costs of converting old systems to new platform or transferring data New Hardware and System Software Some software components will only run on new platform Developing system for new platform gives organization opportunity to upgrade technology holdings New requirements may allow organization to radically change its computing operations 7.13 Copyright 2006 Prentice-Hall, Inc.

14 Hardware and Software Issues (continued)
Request for Proposal (RFP) A document provided to vendors to ask them to propose hardware and system software that will meet the requirements of your new system 7.14 Copyright 2006 Prentice-Hall, Inc.

15 Implementation Issues
Technical and social aspects of implementation need to be addressed Training Disruption of Work 7.15 Copyright 2006 Prentice-Hall, Inc.

16 Hoosier Burger’s New Inventory Control System
Replacement for existing system Figure 7-4 ranks system requirements and constraints 7.16 Copyright 2006 Prentice-Hall, Inc.

17 Copyright 2006 Prentice-Hall, Inc.
7.17 Copyright 2006 Prentice-Hall, Inc.

18 Hoosier Burger’s New Inventory Control System (continued)
Figure 7-5 shows steps of current system When proposing alternatives, the requirements and constraints must be considered 7.18 Copyright 2006 Prentice-Hall, Inc.

19 Copyright 2006 Prentice-Hall, Inc.
7.19 Copyright 2006 Prentice-Hall, Inc.

20 Hoosier Burger’s New Inventory Control System (continued)
Figure 7-7 lists 3 alternatives: Alternative A is a low-end proposal Alternative C is a high-end proposal Alternative B is a midrange proposal 7.20 Copyright 2006 Prentice-Hall, Inc.

21 Hoosier Burger’s New Inventory Control System (continued)
Selecting the Most Likely Alternative Weighted approach can be used to compare the three alternatives Figure 7-8 shows a weighted approach for Hoosier Burger Left-hand side of table contains decision criteria Constants and requirements Weights are arrived at by discussion with analysis team, users, and managers Each requirement and constraint is ranked 1 indicates that the alternative does not match the request well or that it violates the constraint 5 indicates that the alternative meets or exceeds requirements or clearly abides by the constraint 7.21 Copyright 2006 Prentice-Hall, Inc.

22 Copyright 2006 Prentice-Hall, Inc.
7.22 Copyright 2006 Prentice-Hall, Inc.

23 Hoosier Burger’s New Inventory Control System (continued)
Selecting the Most Likely Alternative According to the weights used, alternative C appears to be the best choice 7.23 Copyright 2006 Prentice-Hall, Inc.

24 Updating the Baseline Project Plan (BPP)
The Baseline Project Plan (BPP) was developed during systems planning and selection phase Baseline Project Plan (BPP) can be used as an outline of a status report at analysis phase Schedule will be updated to reflect actual activities and durations An oral presentation of project status is typically made at this phase 7.24 Copyright 2006 Prentice-Hall, Inc.

25 PVF WebStore: Selecting the Best Alternative Design Strategy
Requirements and constraints were compiled by consultant and team (see Table 7-4) 7.25 Copyright 2006 Prentice-Hall, Inc.

26 Copyright 2006 Prentice-Hall, Inc.
7.26 Copyright 2006 Prentice-Hall, Inc.

27 Copyright 2006 Prentice-Hall, Inc.
PVF WebStore: Selecting the Best Alternative Design Strategy (continued) Proposed system is a scalable, three-tier approach Scalable The ability to seamlessly upgrade the system through either hardware upgrades, software upgrades or both Three-tier Web Server Provides connection to the Internet and presentation of HTML page Applications Server Middle layer of software and hardware that lies between Web server and corporate network Corporate network Existing organizational computing infrastructure 7.27 Copyright 2006 Prentice-Hall, Inc.

28 Copyright 2006 Prentice-Hall, Inc.
7.28 Copyright 2006 Prentice-Hall, Inc.

29 Copyright 2006 Prentice-Hall, Inc.
Summary Identify requirements and constraints Generate alternative design strategies Select the best design strategy Update the Baseline Project Plan (BPP) Select the best design strategy for Internet applications 7.29 Copyright 2006 Prentice-Hall, Inc.


Download ppt "Chapter 7 Selecting the Best Alternative Design Strategy"

Similar presentations


Ads by Google