Beam line review group aims for review paul drumm.

Slides:



Advertisements
Similar presentations
1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.
Advertisements

MR1 Consulting ltd Collaborating for Business Performance
Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
1 Simulation Status/Plans Malcolm Ellis Sci Fi Tracker Meeting Imperial College, 10 th September 2004.
9/10 solenoid case – a snapshot with Transport m. apollonio IC purpose: understand how the beam envelope changes when operating with a reduced solenoid.
Particle ID in the MICE Beamline MICE Collaboration Meeting 30 March Paul Soler, Kenny Walaron University of Glasgow and Rutherford Appleton Laboratory.
1 Approaching the Problem of Statistics David Forrest University of Glasgow CM23 HIT, Harbin January 14th.
Paul drumm, mutac jan MICE Beamline Optics Design Kevin Tilley, RAL, 12th June MICE Needs Generic Solution Pion Injection & Decay Section (a) Inputs.
Emittance–momentum matrix1 Demonstrating the emittance-momentum matrix Mark Rayner, MICE Video Conference, 21 January Initial 4D.
SLIDE Beam measurements using the MICE TOF counters Analysis meeting, 23 September 2008 Mark Rayner.
Slide 1 MICE Beamline Design and Commissioning Review 16 th Nov 2007 Simulation comparison / tools / issues Henry Nebrensky Brunel University There are.
1 September 09Mark Rayner – Emittance measurement by The TOFs1 Emittance measurement by the TOFs Via trace space reconstruction of individual muons. Complementary.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
A Few Words on Emittance Chris Rogers MICE vc 27/05/05.
Beam line summary paul drumm for beam line group.
California Association for Research in Astronomy W. M. Keck Observatory KPAO Keck Precision Adaptive Optics Keck Precision AO (KPAO) SSC Presentation January.
Beam line characterization with the TOFs1 Demonstrating the emittance-momentum matrix Mark Rayner, CM26 California, 24 March Initial.
MICE Beam Line Design Oct 24 th 2005 Dean Adams, Kevin Tilley Based on TURTLE element definitions by K Walaron, T Roberts and K Tilley.
1 Statistics David Forrest University of Glasgow.
Session 13 Page 11 ECE361 Engineering Practice Verification & Test Plan.
1 Project Management CIS 375 Bruce R. Maxim UM-Dearborn.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
13 Nov 2007 Analysis PC 13 Nov Analysis PC Schedule 2007/ 08 Tuesdays alternate weeks, 16:30 – 18:00 GMT, with ad hoc exceptions 30 October  13.
Tracker Software Update Adam Dobbs, MICE CM37 7 th Nov 2013.
MARCH 1 Project Management AIM l to provide a broad and practical understanding of the practice of Project Management l to improve Project Management practices.
MICE Status (with a UK slant) Paul Drumm, MICE Collaboration UK-NF June 2003.
Project manager report paul drumm CM16 October 2006.
1 Beamline DayTimePresenterTopic Thurs9:00C.BoothMICE Target Wed16:00K.TilleyRecent Beamline Design Work Wed16:30T.RobertsMICE Beamline Performance + Emittance.
1 Status of NERON/HCN-M for The Committee for Climate Analysis, Monitoring, and Services (CCAMS) John Hahn NWS Office of Science and Technology.
Bob Kois PMP MBA Project Management Basics Scope Management EPICPM ®
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities CD-2 Planning May 8, 2007.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
European design study on Neutrinofacilities - Euronu within FP7.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Project Status Report Presenter Name Presentation Date.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
In Confidence Building a better business update.
Status of HGL R&D collected significant test beam/cosmic data –analysis in progress (Chunhui, Hongkai) –preliminary results: good linearity energy resolution:
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
2 Oct 2008PC We have only 1 hour today May need to be brief.
Paul drumm, mutac jan Precursor: - Resources since cm16. Beamline Review Response. Optics related work: the major threads: -Current (ε,p) status.
M. Ellis - MICE Collaboration Meeting - Thursday 28th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
RMS Dynamic Simulation for Electron Cooling Using BETACOOL He Zhang Journal Club Talk, 04/01/2013.
14/01/2008MICE CM23 - Beam Line Parallel Session1 Simulations: tools and status Marco Apollonio, Imperial College - London.
1June 2 nd 2009MICE CM24 - RAL1 m. apollonio Beamline+( ,P) matrix.
The Project Concept Phase - Concept Report Requirements Presented by the Georgia Department of Transportation Roxana Ene – LCI Coordinator
M. Ellis - MICE Collaboration Meeting - Wednesday 27th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
7 November 2006Program Management Basics Purdue FIRST Programs Slide 1 Program Management Basics Purdue FIRST Programs Chris Fultz Rolls-Royce Corporation.
CKOV1 design status 1. Generation of muon and pion beam files 2. PID performances with water radiator 3. Does it help with fluorocarbon FC72 ? 4. Conclusion.
Paul drumm, mutac jan Status of Muon Beamline design work Kevin Tilley, RAL, 9th Feb Including Beamline Materials in new revision Reference ('True')
1June 1 st 2009MICE CM24 - RAL1 Beamline Optics m. apollonio.
(one of the) Request from MPB
Rob Connatser NSS Instrument Work Packages and XLPM.
K. Long, 28 June, 2016 Introduction to MICE — and the role of the Hydrogen Delivery System.
MICE at Step IV without SSD
Project Management Institute
The DBD: Outline and Scope
Lecture 6 Initiating and Planning Systems Development Projects
K. Tilley, ISIS, Rutherford Appleton Laboratory, UK Introduction
Definitions EPC EPCM Design/Build Contract Lump Sum
The Detector System of the MICE Experiment
Charge for CSPEC Detector Construction Workshop
CICA Project of the Year Entry Template
Presentation transcript:

Beam line review group aims for review paul drumm

Scope of beam line review: * Establish that the front end (geometry) is invariant under emittance and momentum settings and is capable of delivering. * That the designs so far demonstrate low risk; that the matching section can deliver the beams we require. * That the design process is capable of providing the optics solutions of the 3x3 matrix. * Engineering, power supplies, controls and other: status & plans

3x3 design matrix pp 11 66 10  Baseline Design 140 MeV/c

people Beam line team: –RAL: Kevin Tilley* – linear optics Dean Adams “ “ Paul Drumm* – Coordination & Engineering –Glasgow: Kenny Walaron* – Simulation & performance –Chicago (IIT): Tom Roberts*“ & “ –Imperial Chris Rogers* - emittance and matching in MICE * Present for review

What we want from today! The beam line optics design is far from finished! We seek comments on our belief that: –The current design strategy will meet needs of MICE and is appropriate –That our confidence in the stability of the geometry is not misplaced To keep to the schedule we seek: –Your confidence that the strategy for engineering ( i.p. the front end ) is low risk

Documents & Presentations: Description of the design process 1) Linear optics 2) Detailed monte carlo simulation Description of the engineering: 3) Engineering design & construction - schedule and - design & construction strategy