Conditions of the Contract for Construction

Slides:



Advertisements
Similar presentations
Construction Contracting
Advertisements

Roles & Responsibilities in Construction Management
Managing Construction Risks
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
Construction Contracts with Private Owners
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
SUBMITTALS PROCESSING Fall 2008 ARCH 330
Bidding Requirements ACT 380. Objective Provide an overview of the bidding process, including documents included in the bidding requirements.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
14.21 Contract Closeout Procedure Update Notice of Completion, Release of Retention and Punchlist Resolution December 8, 2005.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
OCR Payment Process Training 01/17/2012. Article 9 – Compensation and Payment General Conditions – Article 9 – 9.1 Preconstruction Stage Compensation.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Project Close Out CTC-470.
Conditions of the Contract for Construction AIA A 201 General Conditions Foundation Plans.
ESTIMATING By Laith Jacob.
PROCEDURES FOR SELECTING THE CONTRACTOR
Construction Engineering 221 Drawings and Specifications.
Construction Engineering 221 Contracts & Contractor Procurement.
Construction Engineering 221 Cost Estimating and Bidding.
111 Con E 221 Review graded exams on Monday Review presentation guideline for term papers Finalize presentation schedule on Monday.
What Are Construction Documents Construction documents serve as a means of obtaining bids from contractors and are used by contractors to obtain price.
Mechanic’s Lien DENIZE & SARAH. WHAT IS A MECHANIC’S LIEN  A Mechanic’s Lien is a security interest in the title to property for the benefit of those.
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
Standards of Practice Course
The Construction Specifications Institute Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT)
Construction Contracts What You Need to Know March 19, 2015.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
CIVL202 Construction Engineering I Tutorial 3 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
CEM 520 Construction Contracting Dr S. Almohawis Course Content.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
2010 CDBG Recipients’ Workshop The Housing Rehabilitation and Reconstruction Monitoring Reviews… How to Successfully Pass.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
Chapter 30 Final Inspection, Contract Closing, and Project Transfer.
Construction Documents ACT Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.
Chapter 2 Introduction to Construction Procedures
CONSTRUCTION CONTRACTS DOCUEMENTS
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems General Conditions of Contract and Special Conditions of Contract.
Project Closeout Module #14 Prepared by Dr. Randy R. Rapp July 2005.
1 Instructions to bidders  Eligibility  Procedure for clarifications  Bid preparation - form  Number of copies, addressee  Language  Pricing and.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
1 Don’t Let Construction Administration Services Become a Claims Maker Architects and Engineers Professional Liability Workshop.
Presented by: Brienne Berscheid Assistant Vice President & Construction Escrow Underwriter Construction Escrow Documentation Requirements.
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
Contract Review: Practices and Pitfalls Cynthia A. Haines, Esquire Post & Schell, PC LeadingAge PA Annual Conference June 16, 2016.
The Housing Rehabilitation and Reconstruction Monitoring Reviews… How to Successfully Pass.
Engineering a Good Project Drew Seaman. Engineering: the work of designing and creating large structures (such as roads and bridges) or new products or.
CONSTRUCTION ADMINISTRATION Quality Control, Responsibility & Liability TQC Presentation 01/17/08.
EQUIPMENT CONTRACT RUS FORM 395
DOING BUSINESS WITH ALBERTA INFRASTRUCTURE
Warranties Review Questions.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Designers’ Manual Overview and Chapter Contents
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
Directed Change Constructive Change
The Nuts & Bolts of Servicing a 221(d)(4) Construction Loan
Presentation transcript:

Conditions of the Contract for Construction AIA A 201 General Conditions Semester Project

Construction Documents & Contracts

AIA A201 - Introduction Purpose: A legal basis for constructing a project. Use: AIA A201 is the most widely used document for this purpose, especially in “private“ construction projects 2 Basic Things to Remember: It is general and covers items that are common to every project. It must, therefore be tailored to meet the needs of a specific project by supplementary or special conditions. It forms a part of the Owner-Contractor Agreement, which is a contract between those parties only. The architect is not a party to that contract and is not permitted to prepare it. Only an attorney is authorized to prepare such a contract. The architect should forward all legal contract forms to the owner. These documents must be reviewed by the owner’s attorney and incorporated into the project manual. Architects should never act unilaterally concerning general, supplementary or special conditions of the contract.

Standard Form of General Conditions The conditions of the contract establish the “rules” which are consistent from project to project. They deal with contractual matters not with procedural requirements (refer to Division 1). Supplementary Conditions: Modify the standard forms, especially with multiple primes, fast-track & cost-plus-fee projects. Relation to Local Codes & Laws: They override the General Conditions Rights and Obligations of the Owner Implicit: Access to site & cooperation Explicit: $ contractor & furnish evidence, furnish documentation, copies id CD’s, hire his/her own forces or multiple contractors, stop the work for specific reasons (defective, not in accordance with CD’s, slow progress, does not correct mistakes), owner can make corrections using others. General Conditions assumes 1 prime or GC on the job

Major Elements of the General Conditions Bonds: A form if insurance protecting the owner. Bonds are furnished by surety

Major Elements of the General Conditions - Bonds Performance Bond – guarantees the contractor will perform the work in accordance with the CD’s. Bid Bond - guarantees the bidder will sign an agreement; usually for 5%-10% of the bid amount the bond will compensate the owner for the $ difference. Labor & Material Payment Bond - guarantees the contractor will pay all labor and material $

Major Elements of the General Conditions - Insurance Owner Builder’s risk (property) insurance for full cost of construction up to 100’ away; includes riders for theft, vandalism, etc. Contractor Worker’s Compensation - job injuries required by most States Liability - claims for injuries, sickness & death Contractual Liability - indemnification; hold harmless *Personal Injury - slander, libel, false arrest *Property - explosion, sudden collapse *Auto

Major Elements of the General Conditions - Insurance Contractor Worker’s Compensation - job injuries required by most States Liability - claims for injuries, sickness & death Contractual Liability - indemnification; hold harmless *Personal Injury - slander, libel, false arrest *Property - explosion, sudden collapse *Auto

Major Elements of the General Conditions Liens Contractor, supplier or worker can force the sale of property to satisfy the claim of non-payment by the owner. Liens encumber the owners title and effect their credit rating Not permitted in public projects Federal projects require material and labor bonds are per the Miller Act. After each payment the owner may ask for a Release of Liens for the amount of that payment

Major Elements of the General Conditions - Shop Drawings & Submittals Responsibility of the Contractor Prepare shop drawings based on verified field measurements, construction criteria; checked and coordinated drawings with a stamp; submit drawings, data & samples per specs.

Major Elements of the General Conditions - Shop Drawings & Submittals Responsibility of the Architect Review and “approve” or take other action on shop drawings Architects DO NOT review un-stamped submittals Architect's approval is for conformance to the contract documents only; the contractor is responsible for deviations even on architect approved submittals

Major Elements of the General Conditions Time Limits, Schedule & Delay Work must be completed within the allotted # of days; liquidated damages & bonus clauses Time extension for force majeure (Acts of God) Payment Procedures Contractor must submit a schedule of values Contractor get money for mobilization and submittals Contractor must submit payment application for architect certification (approval of rejection) Site Safety

Major Elements of the General Conditions Substantial Completion: Owner occupancy (C of O issued), warranty period starts (contractor & material), partial payment released; not final completion yet, but close. Role of the Contractor: make punch list and review with Architect & correct all problems Role of the Architect: inspect and observe and expand punch list Role of the Owner: signs the Certificate of Substantial Completion; pay full contract sum less incomplete work; property insurance ends, bonds voided, surety notified

Major Elements of the General Conditions Record Drawings Contractor is req. to maintain copies of all dwgs, specs, addenda, change orders and up date them as the project progresses; inc. shop dwgs., product data and samples. Final Completion When punch list work is complete and a final application for payment is issued, final inspection occurs by architect and issues final payment certificate to owner; contractor must issue affidavit of release of liens. Project Closeout Refer to Div. 1, submit record drawings, spare parts, testing, start-up, etc.

How it is supposed to work When things go the way they are supposed to, the architect’s interaction is essentially one of answering questions about design intent and possibly issuing a few supplemental instructions. The contractor significantly marks up submittals, and pre-installation conferences are held at the contractor’s request. If all went as intended, a project would go something like this……

How it is supposed to work Architect designs project and issues design drawings (drawings locate, specifications establish quality) Contractor develops plan for procuring the work and allocates work among trades Contractor and trades develop a plan for placing the work and prepare composite coordination drawings and alternate sketches Trades prepare submittals and submit to contractor

How it is supposed to work Contractor coordinates trade submittals with the plan for the work, marks up and approves submittals, and submits to architect Architect reviews submittals for conformance with design concept Contractor and trades construct with approved submittals Contractor issues RFIs for questions that cannot be answered from the information given or for questions about discrepancies in the architect’s documents The architect responds to RFIs with answers to questions.