Bay team’s Output Engineer Yang, Yao-Hung Construction Manager David Walthall Architect Cindy Chan.

Slides:



Advertisements
Similar presentations
Pacific Team TEAM INTRODUCTION Pacific 2001 Crystal LangARCHITECT Robert WrightENGINEER Edgar LeenenCONSTRUCTION MANAGER Will Clift APPRENTICE Robert.
Advertisements

Introduction to Lateral Force Resisting Systems
BIMception Proposal Thomas Villacampa Alexander Stough Christopher Russell Stephen Pfund.
Express Team University of New Mexico February 24, 2006.
Architect: Greg Miller, Georgia Tech Engineer: Stratton Newbert, Stanford Construction: Lori Huneryager, Stanford Apprentice: Forest Flager, Stanford Owner:
Picture Lake Geneva, Switzerland Surrounded by the Alps 20°C mean temperature in summer Annual snow fall – 30in Site Context.
W a v e Mildred van der ZwanArchitect - TUDelft Valerie OuEngineer – Stanford Diego AvilesConstruction Manager - Stanford Daniel KwonApprentice.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
University Health Building Thesis Final Presentation
CENTRAL UNIVERISTY ARCHITECTUREJoy Liu, Cal-Berkeley ENGINEERINGNorm Faris, Stanford CONSTRUCTIONTim Kolaya, Georgia Tech OWNERAlex Barron, Stanford Engineering.
Commercial Foundations
2001 Winter Presentation. Site Location Site View.
Mountain Ridge Project - winter presentation - AEC The making of Ridge University Engineering Building E ngineerMartha Del Campo, Stanford, CA A rchitectKatrin.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Pacific University Architecture Katie Kozarek EngineeringChristian Heimple ConstructionDebbie Sit ApprenticeChristina Cho OwnerPeter Demian School of Engineering.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
2001 Final Presentation. The Atlantic Team JARED Georgia Tech Construction Manager PETER Georgia Tech Construction Manager HANS Georgia Tech Owner KIM.
construction manager Kit Fleming engineer Peng Li architect Xiang Liu owner Hans Verheij Collaboration in Cyberspace E X P R E S S T E A M C.
RAHINAH IBRAHIM Stanford University Architect CRAIG LONG Kansas University Engineer JORGE FUENTES Stanford University Construction Manager ROXANNE ZOLIN.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.
Frames and Walls Lateral Stability
TOPICS COVERED Building Configuration Response of Concrete Buildings
R I V E R A rchitect Elena Paparizou Berkeley E ngineer Paul Kulseth Kansas C onst. Manager Wendy Wang Stanford O wner Jonathan Wong W i n t e.
WRIGHT ENGINEERING BY: CHAMPION HEIGHTS COMMERCIAL BUILDING ERIC BEALS RYAN KRAUSE CAMERON MILLER RANDY RODRIGUEZ HORACIO MONTEJANO.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
Team Central Winter Presentationslide 1 of 65 Winter Presentation AEC Global Team Class 2002 Winter presentation Team Central.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
State-of-Meaning NDSU Area Transit and Bus Stop. Mission Statement “… To Preserve Essential Tradition By Recognizing the existing and adding Innovation.
Kitty Chan UC Berkeley architect Chad S. Green Stanford University Yuning Wang Stanford University engineer contractor owner Robert Alvarado Mission:
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
Pacific Team Winter Quarter Presentation AMaria Zapata, Georgia Tech, Atlanta EAmir Kavousian, Stanford U, Stanford Xin.Zheng Lu, Tsinghua U, Beijing CKarthik.
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Mathew Nirenberg AE Senior Thesis Structural Option.
Third Avenue NY, New York Michelle L. Mentzer Structural Option.
Mountain Hotel Urban Virginia Senior Thesis 2013 Faculty Advisor: Professor Kevin Parfitt Benjamin Borden Structural Option.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Project Introduction  New high-tech classroom and lab facility  Area : 30,000sq.ft.  Function –To provide a home for innovative courses that take a.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Architect (K.U.) ADAM GUMOWSKI V p A c i e w Engineer (S.U.) JASON STONE C.M. (S.U.) BOB FARMAN Winter Quarter Presentation acific P niversity.
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
The Mountain Ridge Team Mountain Ridge Team Final Presentation The Ridge University Engineering Building May 15, 1998 Architect: Humberto Cavallin Engineer:
Final Presentation of Bay Engineer Yang, Yao-Hung ConstructionManager David Walthall Architect Cindy Chan.
An-Najah National University
Introduction James W. & Frances G. McGlothlin Medical Education Center
Lucas Pettinati Rafael Monzon Andreas Dinopoulos
Team Introduction Collaboration in Cyberspace
The Mountain Ridge Team
Mountain Ridge Project
Mississippi Riverbank Project (Final Presentation) May 14, 1999
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Project: 250 West Street, Columbus, Ohio
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

Bay team’s Output Engineer Yang, Yao-Hung Construction Manager David Walthall Architect Cindy Chan

San Francisco Seismic Concern Liquefaction and Landslides

Climate Data San Francisco Oceans, California USA Located at N W, 100 feet above sea level Average Temperature 55.6 °F Annual Rainfall1.9 inches Heating Degree <65°F / Year1921 Cooling Degree23 Reference Site

Urban Texture Campus Transaction of Urban and Nature Campus Grid vs. City Grid N

San Francisco State University Student Health Center Burk Hall Student Service Complex Cesar Chavez Student Center J.P. Leonard Library N

Redesign- Sundial Project Original Concept The Sundial will be a marker of time and movement of the activities that occur inside the building Hallways acting like a Telescope (provide view to SF), allowing outsiders to have a clear view of the activities occurring inside. Goal Add Cafeteria and Gym Using the unique cone structure to centralize main social activity Provide more efficient circulation and encourage interaction.

Floor Plan Gym 2 Floor height open space 660 SF- 26’ 400 SF - 16’ RR Columns and Glass Panels alone the Gym Chair Office Faculty Office Secretaries Cafeteria E N B 1 st 2 nd 3 rd

Attempt of Material Choice A: Using Tensile structure for the cone structure E: Concern about safety Issues: Wind velocity Owner : Low R-Value for the tensile structure Use double glazing for the structure A: short life cycle of the structural material

Redesign Structure Alts Side View Steel SMRF Concrete MRSF

Redesign Concrete selected

Alt 1 - The Spine Project The fundamentals of Engineering Profession… Research Recording Analyzing Storing Information Knowledge Centralize Display Encourage Social Interaction Private Faculty Student Public E`

Spine Floor Plan 1 st 2 nd 3 rd

Spine Material Choice

Spine Structure Alternatives 3D Model Side View Core + Brace, Steel SMRF Brace, Concrete SMRF Shear walls with Concrete SMRF

Spine Spine with glass cladding Brace with Energy dissipation devices

Spine Alt 1 Brace & Damping

The Curve Wall Project

Entrance Curve Wall Cantilever Structure Circulation/Service Strip Concept

Plan Evolution 2 nd Classroom/ Lab Receive defuse North light 1 st Basement Auditorium Public Space alone the Curve Wall Lobby 2 fl height open space Student Office Close to student body Ramp Handicap Access. Curve Wall Sense of continuity Cantilever Bridge to the nature

Material Choice

Curve Alternatives Core with Steel MRF and lightweight concrete slab and steel deck Shear walls, Core with Postensioned Gravity Floor System

Auditorium & Cantilever Auditorium Cantilever Part Shear connection

Foundation: Footing Spread Footing (Shallow Foundation) Used Dimension: 3.6 x 3.6 Square Footing

Retaining Wall – Water table ’ – Soil Friction angle - 20 – Cohesion lb/Ft 2

Construction Constraints and Considerations Site Location –Close to ocean –San Francisco – seismic activity –Metropolitan area – accessibility and construct ability

Location of Site Major Highway

AVOID!!

Trailer Radius of Crane Material Storage Flow of Traffic Alternative Site Layouts

Flow of Traffic Trailer Radius of Crane Material Storage

Funds Available for Project

Conservative values + Inflation + Cyclical Costs + Improved Methods $500,000 =

Equipment Selection Mobility Maneuverability Cost Availability

120 Ton All Terrain Crane Grove GMK- 5120B For use with heavy columns And beams as wells as Decking Reach of 72 feet to 115 feet. Heights from 52 feet to 72 feet. Lift capacities at maximum reach of 1320 pounds to 2200 pounds. Maximum lift of up to 8800 pounds. For use with VRML

Price Breakdown

+ ’s- ’s - Strong sense of directionality - Clear frame and core defined - Repetition, Symmetry - Scarify large amount of space - Complex interactions between systems - Too Expensive - Simple Form and Clear Circulation path - Various informal social space - Two Uniformed structure system - Challenging Design - Exceeding height limit - The form is too Rigid - Eccentric moment issue - Amount of Glass - Strong Form and Gesture - Provide multi level special experiences - Simple gravity system - Reassembly of materials\ - Lack of informal social space - Non-Uninformed Long beams - Complicated concrete Comments

Team Dynamics

Lessons Learned / Improvement Lessons Architect – Communication through 2D and 3D graphic program, Patient and Trust. Engineer – 3D coordination,Communication, CM – Complete Documentation exchange between discipline Improvement Precisely define the size of components 3 D software modeling Always Keep other members inform of ideas, progress, and changes through website Time management and Efficient group meeting