16 th International Laser Ranging Workshop, Poznan Poland, Oct. 14 th, 2008 Laser Ranging (LR)-Lunar Reconnaissance Orbiter (LRO) Data Flow and Scheduling.

Slides:



Advertisements
Similar presentations
2014 Workshop on Spacecraft Flight Software 1 Pasadena, CA, December 16-18, 2014 ICON End-To-End Operations Philosophy Will Marchant, Manfred Bester, Carl.
Advertisements

16 October th International Workshop on Laser Ranging 1 Implementing the Consolidated laser Ranging Data (CRD) Format throughout the ILRS Network.
Missions Working Group report to ILRS General Assembly Friday October 17th 2008 Poznan, Poland Graham Appleby and Peter Shelus GOCE, ESA.
UMBC NASA’s BEST Students B eginning E ngineering, S cience and T echnology ESMD Project Managers Meeting Kennedy.
Pre-Launch Testing of NGSLR Ranging to LRO Anthony Mallama Jan McGarry Tom Zagwodzki Jack Cheek Christopher Clarke All at NASA/GSFC.
The Lunar Reconnaissance Orbiter (LRO) is the first mission in NASA's Vision for Space Exploration, a plan to return to the moon and then to travel to.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center Phase E Kickoff Meeting February 23, 2007.
Laser Ranging to the Lunar Reconnaissance Orbiter (LRO): a Global Network Effort Jan McGarry, Tom Zagwodzki, Ron Zellar, Carey Noll, Greg Neumann NASA.
Michael Lampton Overview of Space Sciences Laboratory 16 July 2003.
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
Canberra, Australia On the Generation of SLR Output Files at Mt Stromlo Chris Moore, Peter Wilson.
16th International a Ranging Workshop. October 13-17, 2008 Poznan, Poland SLR station Riga software upgrade K.Salminsh Institute of Astronomy University.
Analysis Working Group Report ILRS General Assembly Meeting Poznań, Poland, Oct. 16, 2008 Erricos C. Pavlis Analysis Coordinator.
TOR TanDEM-X 16th International Workshop on Laser Ranging, Poznan, October 2008 ILRS Support for TerraSAR-X and TanDEM-X - Status and Future Prospects.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
Laser Ranging Contributions to Earth Rotation Studies Richard S. Gross Jet Propulsion Laboratory California Institute of Technology Pasadena, CA 91109–8099,
14 October th International Workshop on Laser Ranging 1 LRO Operations at the MLRS Jerry R. Wiant Randall L. Ricklefs Peter J. Shelus Center for.
NGSLR: Sharing Eye-safe Kilohertz SLR with Transponder Ranging Jan McGarry, Tom Zagwodzki NASA Goddard Space Flight Center Tom Varghese, Cybioms John Degnan,
Moblas 8 Return to Operations 16 th International Laser Ranging Instrumentation Workshop Poznan, Poland October 16, 2008 Scott Wetzel, Howard Donovan,
INFORMATION SYSTEMS AND THE INTERNATIONAL SPACE STATION -Colby Nortz.
ILRS Network Performance Michael Pearlman Carey Noll ILRS Central Bureau NASA GSFC, Greenbelt, MD USA October 16, 2008.
Poster Design & Printing by Genigraphics ® NASA’s Next Generation Satellite Laser Ranging System (NGSLR) is an autonomous, photon- counting.
The Hubble Telescope Ashley Field. Hubble Facts The Hubble Telescope was launched into low Earth orbit in 1990 Four main instruments observe in the near.
EMC Quiet Planning During Science Operations Andrew Walsh & Chris Watson Solar Orbiter SOC, ESAC, Madrid EMC Working Group #12, Imperial College,
Educator Resources in Space Sciences Caitlin Nolby North Dakota Space Grant Consortium.
Level 1 - LRO Requirements ESMD-RLEP-0010
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
New Prediction System - Introduction  The Consolidated Prediction Format (CPF) provides a single, convenient method for most stations to range to disparate.
Polar Topographic Knowledge Prior to LCROSS Impact David E. Smith 1, Maria T. Zuber 2 1 NASA/Goddard Space Flight Center 2 Massachusetts Institute of Technology.
CHIPSat Cosmic Hot Interstellar Plasma Spectrometer Spacecraft Julius-Maximilians-Universität Würzburg S: Telematik in der Raumfahrt Prof. Dr. Schilling.
E 1 David Murphy 31-Oct-06/1-Nov-02 Agenda + U.S. VSOP-2 Support Plans.
Spacecraft and Ground Segments Status March 21, 2014 Dan Ossing STEREO Mission Operations Manager (240)
Section Number - 1 NASA’s Goddard Space Flight Center Communication Systems Jason A. Soloff NASA/GSFC Code 567 August 16-17, 2005.
Ames Research CenterDivision 1 Information Power Grid (IPG) Overview Anthony Lisotta Computer Sciences Corporation NASA Ames May 2,
RECENT ENHANCEMENTS TO THE CDDIS IGS Network Systems Workshop November 2-5, 1998 Annapolis, MD Carey E. Noll Manager, CDDIS NASA GSFC Greenbelt, MD.
GEOSAT Follow-On (GFO) Radar Altimeter Satellite
ALOS -Advanced Land Observing Satellite Using SLR, The GPS accuracy verification of ALOS JAXA Precise Orbit Determination Team S Nakamura, N Kudo, R Nakamura,
1 Lunar Reconnaissance Orbiter (LRO) Overview CRaTER PDR 6/27/2005 Craig Tooley.
1 JWST Functional Flow Diagrams and Schematic Block Diagrams.
March 2004 At A Glance autoProducts is an automated flight dynamics product generation system. It provides a mission flight operations team with the capability.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG March 27-28, 2007.
NASA’s Goddard Space Flight Center Lunar Reconnaissance Orbiter Ground System Requirements.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
ILRS Web Site Status URL is Van Husson, Mike Pearlman, Carey Noll, Mark Torrence SLR/LLR CSTG Meeting September.
Adrian Gardner, NASA GSFC CIO August 16, 2011 Strategic Computing Strategy for Goddard Space Flight Center.
Transponders A new Working Group in the ILRS. In a very general way a transponder is an active component in space Laser Beacon (synchronized to a caesium.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
© ИАЦ КВНО ЦНИИмаш Собственность ИАЦ. All rights reserved GLONASS Status and Progress Sergey Revnivykh CGSIC Meeting , Savannah, GA, US.
© 2014 Orbital Sciences Corporation. All Rights Reserved. SPRSA Excess Capacity Panel Carol P. Welsch Orbital Sciences Corporation June 10, Welsch.
Educator Resources in Space Sciences Caitlin Nolby North Dakota Space Grant Consortium.
C H A M P International Laser Ranging Service - General Assembly, October 2005 Eastbourne, UK L. Grunwaldt, R. Schmidt, D. König, R. König, F.-H. Massmann.
MOIMS MO & Nav Functions, Services & Interfaces CCSDS Ref Arch Discussion 20 Oct 2015.
Educator Resources in Space Sciences Caitlin Nolby North Dakota Space Grant Consortium.
Determination of the SLR station coordinates and velocities on the basis of laser observations of low satellites Paweł Lejba, Stanisław Schillak Space.
ISRO – NASA Space Science Co-operation S.Seetha Programme Director, Space Sciene Programme Office, ISRO HQ & Co-Chair-INMWG Meeting on 24 th Feb 2016 at.
NASA, CGMS-43, May 2015 Coordination Group for Meteorological Satellites - CGMS Update of the NASA GPM and Precipitation Products and their Availability.
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
Lunar CRater Observation and Sensing Satellite Project LCROSS Astronomer Workshop Feb. 29, 2008 NASA/ARC, Mountain View, California Mission Design & Observation.
Mark Beckman NASA/GSFC Code 595 August 16-17, 2005
Educator Resources in Space Sciences
MMS enters Phase 2b to study Magnetic Reconnection on Earth’s Dark Side On 9 February 2017, NASA’s Magnetospheric Multi-Scale (MMS) mission began a three-month.
LRO Mission Operations Concept
Recent and future space missions
Recent and future space missions
Solar System Exploration Division, GSFC
NASA Satellite Laser Ranging Moblas 4 Monument Peak, CA LRO and HPWREN Scott Wetzel NASA Satellite Laser Ranging Program Near Earth Networks Programs.
Public Engagement Lead LRO and SAM
Apollo and Beyond cont..
Solar eclipse August 21, 2017.
Presentation transcript:

16 th International Laser Ranging Workshop, Poznan Poland, Oct. 14 th, 2008 Laser Ranging (LR)-Lunar Reconnaissance Orbiter (LRO) Data Flow and Scheduling Christopher (Bart) Clarke, Julie Horvath, Oscar Brogdon, Anthony Mann Honeywell Technology Solutions Inc. Jan McGarry, Carey Noll, Greg Neumann NASA Goddard Space Flight Center Mark Torrence SGT Incorporated

16 th International Laser Ranging Workshop, Poznan Poland, Oct. 14 th, 2008 After the launch of LRO in early 2009, NGSLR and all other approved ILRS stations will establish one-way ranging to the LRO- LOLA detector to meet intensive orbit determination requirements needed to develop a new lunar gravity field model. LRO will present new challenges for the ILRS and NASA SLR communities with new data and scheduling requirements that will help ensure the success of the LOLA payload experiment. –Data Format (New CRD format) –Data Flow –Scheduling for LRO Operations NASA SLR and HTSI have coordinated with the LRO mission and LOLA payload science team to develop new data and scheduling processes for LRO ranging. LR-LRO Data Flow and Scheduling

16 th International Laser Ranging Workshop, Poznan Poland, Oct. 14 th, 2008 LOLA SOC LRO MOC / S-Band / Ground Network LRO FDF LRO Spacecraft LOLA LR Flight Segment Laser RangingLOLA LRO Laser Ranging Network Block Diagram Laser Data Flow Tracking Schedule LRO Predictions LR Ranges Gravity Model WOTIS Sched, SCLK file, Go/NoGo file, Visibility File, LRO Predictions, LOLA H/K TLM LOLA TLM HTSI Ground Systems Data inputs to LR-GS Data outputs from LR-GS Laser Fires LR Schedule LRO Predictions, Visibility File, WOTIS sched LR Schedule, Laser Fires All incoming & outgoing LR data, plus Laser Fires & website. JLFM 9/30/2008 CDDIS Ground Stations Predictions, Go/NoGo, SCLK

16 th International Laser Ranging Workshop, Poznan Poland, Oct. 14 th, 2008 LR-LRO Data Products Predictions, in CPF format, will be generated by GSFC Flight Dynamics Facility (FDF): –Predictions will be generated once a week –Predictions will delivered to, and accessed on, a secure location on the CDDIS –Predictions will used to generate station visibilities, and station schedules Approved ILRS stations will establish one-way ranging to the LRO spacecraft and generate LR-LRO laser fire data in CRD format. –CRD format is required for added precision in the data product –Data filename will end in.frf (see CRD format v1.0, Ricklefs) –Data will be delivered to the ILRS Data Operations Centers (HTSI,EDC) –All LR-LRO fire data will be compiled together once an hour compressed and delivered to a secure location on the CDDIS –Data will then be available to the LOLA Science Team, which will combine ground fires and corresponding spacecraft events generate normal points in CRD format (.npt) and deliver to CDDIS (no public access) develop lunar gravity field model

16 th International Laser Ranging Workshop, Poznan Poland, Oct. 14 th, 2008 ILRS LR-LRO Schedules HTSI will generate the full tracking schedule for the NGSLR station, including LRO scheduled opportunities –HTSI will deliver NGSLR tracking schedule directly to station daily –NGSLR will be scheduled for every LR-LRO ranging opportunity Approved ILRS stations will be requested to range to specified LRO passes via a weekly combined LR-LRO schedule –HTSI will use LRO predictions to generate initial 20 o elevation station visibilities, then eliminating portions of the visibilities when LRO is on the far side of the moon –Schedules will then be produced based on: System priority (NGSLR #1 priority during ranging opportunities) High Gain Antenna schedule (WOTIS) - (systems will only be scheduled when antenna will be pointing at a “near by” S-Band stations) –LR-LRO ranging schedules will be generated every Friday, for the following Monday – Monday week –LR-LRO ranging schedule will be delivered to a secure location on the CDDIS

16 th International Laser Ranging Workshop, Poznan Poland, Oct. 14 th, 2008 ILRS LR-LRO Schedules W eekly combined LR-LRO schedule –Approved ILRS stations will access the schedule on the CDDIS –LRO Mission Operations Center (MOC) will also access the combined LR-LRO ranging schedule for the required advanced notification of LR activity –Initially, LR-LRO ranging schedule will not overlap ranging opportunities for stations. This will most likely change later in the mission –LR-LRO ranging schedules will be suggested ranging opportunities for each selected station, however, each station must NOT range to LRO outside of these suggested opportunities –Currently in tests with approved ILRS stations

16 th International Laser Ranging Workshop, Poznan Poland, Oct. 14 th, 2008 Summary All ILRS stations approved to range to the LRO spacecraft will generate fire data (.frf) in CRD format All ILRS approved stations will send LR-LRO fire data to the ILRS Data Operations Centers (HTSI, EDC) HTSI will generate a combined LR-LRO schedule for all approved ILRS stations All LR-LRO products (predictions, fire data, normal points, and ILRS combined station schedules) will be hosted at a secure location on the CDDIS LRO Launch – April 24 th, 2009 Laser Ranging to LRO begins in June of 2009