GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.

Slides:



Advertisements
Similar presentations
GLAST LAT Project Calibration and Analysis Meeting, 28 Nov 2005 E. Grove et al. 1 Proposed Flight Trigger Configuration: Engines and Scheduler Table J.
Advertisements

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.
GLAST LAT ProjectMonthly Status Meeting Jan 26, Project Status January 26, 2006 Gamma-ray Large Area Space Telescope Lowell A. Klaisner Project.
GLAST LAT Project Instrument Analysis Workshop 6 – 06/02/27 F. Piron & E. Nuss (LPTA) 1 Trending CAL performance and mapping crystals Gamma-ray Large Area.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status October 29, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 1 GLAST Large Area Telescope: I&T Integration Readiness.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Elliott.
A.Chekhtman1 GLAST LAT ProjectCalibration and Analysis group meeting, April, 3, 2006 CAL on-orbit calibration with protons. Alexandre Chekhtman NRL/GMU.
GLAST LAT Project Instrument Analysis Workshop 5 – 05/08/29 F. Piron & E. Nuss (IN2P3/LPTA – Montpellier) 1 Comprehensive review of CAL calibrations Gamma-ray.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: On-Orbit Calibration and.
GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 1 GLAST Large Area Telescope: TKR Efficiency Trending.
GLAST LAT ProjectGLAST Flight Software IDT, October 16, 2001 JJRussell1 October 16, 2001 What’s Covered Activity –Monitoring FSW defines this as activity.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 1 Introduction to Instrument Workshop 6 Eduardo do Couto e Silva Feb 27, 2006.
Trending ACD performance Parameters of interest Online tests (CPTs) TCI (charge injection) -> PHA TCI -> Veto mapping Timing PHA Pedestals Offline tests.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST Large Area Telescope Engineering Meeting 23 November 2004 Charge Injection Calibration James Swain Stanford Linear Accelerator Center
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
ACD calibrations Pedestals Measured from online script Measure PHA w/ HV off, no charge injection Use cyclic triggers ~ ADC counts, very narrow.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
Sep/26/05Trigger test plan Trigger ACD/LAT Test Plan Eric Grove, Martin Kocian, Su Dong.
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Current Status Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope:
ACD Calibrations in L&EO Needed Calibrations Pedestals (low and high range) Low range gains via MIP peak positions Veto and HLD discriminator set points.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, February, 27, 2006 CAL features and idiosyncrasies. Alexandre Chekhtman NRL/GMU Gamma-ray Large.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 9 of 12 LAT Test Results 1 GLAST Large Area Telescope LAT Pre-Shipment Review LAT.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectI&T Test Planning Telecon, 8 Nov 2004 CAL Test and Calibration DefinitionJ. Eric Grove GLAST LAT GLAST LAT Calorimeter Subsystem Gamma-ray.
GLAST LAT Project Instrument Analysis Meeting– Feb 28, 2006 Tsunefumi Mizuno TowerTrend_ ppt 1 Tracker Parameters Trending Monitor GLAST I and.
GLAST LAT Project IFC Tour – Sep 5,2003 Larry Wai 1 GLAST Large Area Telescope: Integration and Facility Status Larry Wai SU-SLAC Integration and Facility.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration by File James Swain Stanford.
GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 1 GLAST Large Area Telescope: TKR Updates at SLAC Hiro.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
Acd Veto Latching The Acd front end electronics generate a veto primitive when a discriminator goes above threshold. But. The signal is split: One path.
Mini-Tower test results
Gamma-ray Large Area Space Telescope
Single-CAL Test and Calibration
GLAST LAT System Engineering
GLAST Large Area Telescope
GLAST Large Area Telescope
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
Calorimeter calibrations with Flight Software.
GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST LAT System Engineering
GLAST Large Area Telescope: I&T Test Readiness Review
GLAST Large Area Telescope:
Eduardo do Couto e Silva Feb 28, 2006
GLAST Large Area Telescope: I&T Test Readiness Review
Presentation transcript:

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test Review LAT Test Results J. Eric Grove Naval Research Laboratory Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 2 Purpose / Contents  Demonstrate LAT functionality  Monitor LAT performance via CPT and calibrations from Baseline forward through Environmental test –CPT Detector subsystems Copper paths, interfaces –Calibrations Detector subsystems  Performance baseline successfully established at SLAC prior to shipment

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 3 Data Products, Analysis, and Reports  “Online” analysis – Mobile Computing Rack –Data converted from CCSDS to LSF to LDF Same data format used in LATTE era (i.e. prior to FSW) –Analysis scripts and reports from LATTE  “Offline” analysis – SLAC computer farm –Two reports produced for all runs, corresponding to data products Digi report (basic detector quantities) –Trigger info: Total rate; Rates of trigger types; Arrival times –ACD: Occupancy; Threshold info; Hit map –CAL: Occupancy –TKR: Number of strips and layers hit; Time over threshold Reconstruction report (derived quantities) –Number of tracks –Reconstructed energies, directions, positions –TKR-CAL alignment, track extrapolation to ACD –Full GLAST community has access and tools for offline products

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 4 Test Matrix

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 5 Script/Test Status  Liens against LAT CPT –LAT-22x (Science Ops Demo) Needs follow-up analysis of on-board filter output –LAT-23x (GRB Handling) Tests existing FSW. Awaiting future FSW deliveries.  Current script work –LAT-15x, 16x (Thermal control) Scripts have been developed, V&V is pending Plan: Test after radiator installation –LAT-17x, 18x (EMI/EMC) Data acquisition script defined and demoed on LAT Realtime displays, offline analysis being worked –LAT-52x (Light Tight) Data acquisition script defined and demoed on LAT Plan: Test after Vibe

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 6 Data Integrity  Data integrity issues –Three open issues were identified at PSR 1.Dropped word at 256-byte boundary within packet 2.Dropped word at end of packet 3.Compression error in LCI –All three have been fixed. Issues 1 and 2 have been verified. Issue 3 is planned to be verified 5/23/06. Fixed in FSW updates or VSC firmware update Final fix installed after post-ship CPT –No known issues in current data taking

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 7 T&DF Performance  T&DF functionality –Trigger system demonstration in CPT and LPT Trigger primitive aliveness Scheduler, Engine, and Messaging functionality –Trigger and veto efficiency (calibration) Collected with LATTE, analysis on-going Collected with FSW, analysis on-going  Detector subsystems timed-in at Baseline (calibration) –TREQ aligned ACD veto and TKR time-aligned with CAL-LO –TACK delay optimized ACD and CAL MIP peaks maximized –Analysis of ACD re-acquisition is in progress TKR hit occupancy maximized

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 8 Trigger Summary

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 9 ACD Performance  Subsystem performance –Minimum-ionizing particle (MIP) peaks –Veto rates –Veto thresholds  Electronics performance –Pedestal centroids and widths Width is measure of noise –Gain  Calibration quantities –MIP peaks –Veto thresholds MIP spectra (PHA) Baseline established for all quantities at SLAC by the end of Pre-Ship CPT. All PHA, Veto, and CNO chans within spec except: one Veto, but no flight impact

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 10 ACD Trending  Pedestal width trend –Essentially no changes to electronic noise since ACD was completed –Final phase shown is Baseline CPT  Veto occupancy –Aliveness test for all Veto signals “GEM Veto List” –Muons during LAT CPT and LPT show all channels are alive

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 11 ACD Performance at Baseline  Pedestal width baseline –Low electronic noise ~½% of MIP peak –Measured in each CPT, LPT  MIP peak baseline –PMT gains are adequately balanced –Measured with 4 hrs of muons

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 12 CAL Performance  Subsystem performance –Gain (“MeV/bin”) –Linearity  Electronic performance –Pedestal centroids and widths Width is measure of noise –Gains –Front-end linearity –Threshold DAC gains  Calibration quantities –Gain –Linearity Hit occupancy Baseline established for all quantities at SLAC by the end of Pre-Ship CPT. except: Threshold DAC gains All spectr chans and thresholds in spec

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 13 CAL Trending  Time evolution of pedestal width –Typical FWHM ~ 8 bins (HEX8) –Plot shows stability of 32 channels –Final phase is SLAC Baseline  Front-end linearity –Typical avg non-linearity ~ 0.2% –Stable to ~0.02% or better

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 14 CAL Baseline Performance  Pedestal width at Baseline –Actual performance relative to spec No issues –Measured in each CPT, LPT  Diode light yield at Baseline –No broken optical bonds –Measured with 4 hrs of muons

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 15 TKR Performance  Subsystem performance –Dead, noisy, and disconnected channel lists –Trigger efficiency  Electronics –Noise occupancy  Calibration quantities –Dead channel list –Noisy channel list –Disconnected channel list –Threshold –TOT gain Hit occupancy Baseline established for all quantities at SLAC by the end of Pre-Ship CPT. Efficiency, bad chan count within spec.

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 16 TKR Trending  Disconnected channel trend –Increase in disconnects < 1.5% since delivery of TKR towers.

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 17 Calibration  Calibration –Datasets collected with cosmic muons and test charge injection SLAC calibrations under both LATTE and FSW Test cases LAT-07x, LAT-70x, and LAT-71x –CAL threshold calibrations done in test gain rather than flight gain »Reacquired at NRL (post-ship) in flight gain –Next acquisition at Pre-TVAC phase  Analysis –Combination of online (near real time) and offline processing ACD Baseline analysis complete and new constants are in use CAL reanalysis is in progress TKR Baseline analysis complete; new constants not yet in use –Output is set of calibration constants for each detector subsystem Trending system for constants is under development

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 18 Summary  LAT status –Performance baseline successfully established at SLAC Baseline CPT completed and signed off Calibrations from LATTE and/or FSW –Post-ship CPT at NRL No known performance issues from shipment Data review for sign-off is in progress –Detectors are operating daily at NRL with flight settings