MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -

Slides:



Advertisements
Similar presentations
Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
Advertisements

Interlocks for Magnet Protection System1 Beam dumps 4 th 11h33 and 5 th Both beam dumps caused by a stop of a Powering Interlock PLC,
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
Injection test? Mike Lamont For initial discussion.
Tomasz Ladzinski GS/ASE. LASS Annual Maintenance & Tests General Principles Each winter shutdown preventive maintenance of EIS takes place. It is followed.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
05:31 Beam dump due to QPS trigger in sector 78.  Quench heaters discharged in MB10.L8. 07:28 Quench heaters charged ok again in cell B10L8.  Was a EN/EL.
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
Stéphane Gabourin TE/MPE-EP MPP – 23 th Oct 2015 CIBDS beam dump triggers due to glitches in BIS loop B1-A diagnosis and mitigation measures.
Schedule IT General Schedule 9 th, September 09 Today.
:30 meetingEBH 1  4:14 lost cryo conditions in Sector 34/45 due to communication problem  6:30 Faulty IT network switch identified  access.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
08:30 Machines in stand-by 12:30 Access in LHC for QPS and PC:  QPS quench heater power supply RB.A12  EPC for RSF2.A67B2 and RQ9.R8B1.  RCBH27.L1B2.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Tuesday 26 th April – morning shift 08:00 Great news, cryo is back! Unluckily it was followed by many other problems, one after the other one. So, spent.
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
BEAM INSTRUMENTATION GROUP DEPENDABILITY APPROACH CERN, Chamonix 26th January 2016 William Viganò
Another typical LHC day. 06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Beam Interlock System SPS CIBU Connection Review
Wednesday 3rd October - morning
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
EYETS LHC 2016/2017 Works EN/EL/CF
RF interlocks for higher intensities (LMC 15 June)
The LHC - Status Is COLD Is almost fully commissioned
Julie Coupard Schedule and Coordination
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Friday h38: Ramp down and pre-cycle.
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
Summary of week 7 Hardware Commissioning:
Monday 11/07: Recovery Plenty of accesses.
Thursday 09:30 VdM scan for CMS, standard ADT gain.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
Saturday 12:00 Fill 1992 in stable beams.
Thursday morning – optics correction
Technical Stop #4 29th August - 2nd September 2011
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Thu 19/5 06: :00 Investigations from vacuum and cryogenics
LHC Morning Meeting - G. Arduini
LHC Morning Meeting - G. Arduini
Week 35 – Technical Stop and Restart
Technical Stop #4 29th August - 2nd September 2011
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Cold compressor speed S45
MPS commissioning at ESS
Technical Stop #4 29th August - 2nd September 2011
LHC - Week 38 Technical stop: Katy Foraz
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Summary Tuesday h23: Machine closed. Precycle started.
Thursday
Coordination: Eva Barbara Holzer, Mike Lamont
Friday 15th February - morning
Thursday 20th July - morning
Monday 10th December - morning
Presentation transcript:

MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 - 05/09/2011J.Coupard1

MEF - Machines & Experimental Facilities First feedback  RP surveys  RP teams need more and more time to do the survey  increase the length of RP survey till 10:30 and 12:00 on MON morning  Access  Badge of access  access  Problems with some PAD and/or MAD (ODM asked directly)  Access system // Access authorization  Patrols lost  Door   Safety  Pulling of  no VIC and no cryo lock-out asked  CRYO  Stop of the THU afternoon but cryo conditions recovered on FRI afternoon  Closing of the LHC machine on FRI 16:30 LHC-TS4 - 05/09/2011J.Coupard2

MEF - Machines & Experimental Facilities Interventions pointed out before the TS LHC-TS4 - 05/09/2011J.Coupard3  Cryogenics  Done Intervention on oil on surface  Cabling  Done  Done NG18  Done  Done Monitoring  Beam Instrumentation  Done BLM: Direct beam dump connection to dump system  Done BPM: New firmware and SW to increase IIR filter order  Kickers  Done Change of generator pos  Done Change of generator HV  Machine Protection  Done Adjustment of 600 A Energy Extraction Switches  Done Quench Propagation Tests in the sector 56

MEF - Machines & Experimental Facilities Change of the optical fibers  Intervention on MON  Inhibition of the BIW  locking-out of the injection lines Ti2 and Ti8 (coordination with the DSO)  No patrol dropped  LASS – GS/ASE feedback  a very positive exercise for our team and a rare opportunity of testing a degraded network mode of operation: a)The LASS network loop connecting the PLCs works as designed - it can withstand a single network failure without consequences for operation; the associated diagnostics functions correctly. b)If possible, using the exact cable/fiber identifiers in the initial presentation of an intervention scope would be beneficial for a more precise estimation of the intervention’s impact. c)The LASS loop and the BIS fibers today share the same cable between UJ76 and RE78.  BIS – TE/MPE feedback  The attenuation values for the new fibers were a little bit higher than the previous ones (when they have been initially installed); however, within the standard limits.  The additional measurements done, in order to know the new noise margins, validated again the values  Some additional tests have been performed in setting the LHC Beam Permit Loops in test mode. Everything was fine LHC-TS4 - 05/09/2011J.Coupard4

MEF - Machines & Experimental Facilities MANY THANKS TO.... EN/EL and GS/ASE for their fast reactivity and flexibility to identify and solve the problem on the optical fibers.. All groups and Experiments for their collaborations LHC-TS4 - 05/09/2011J.Coupard5 Thanks for your attention