Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA 94720.

Slides:



Advertisements
Similar presentations
16-17 March 2010 CERN Introduction by W. Weingarten Review of SPL RF power couplers 16/17 March 2010 Review of SPL RF power couplers 1.
Advertisements

MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
RF Safety Discussion Derun Li/Bob Rimmer Center for Beam Physics Lawrence Berkeley National Laboratory SRF Institute, JLab.
Progress and Plan for Superconducting RF Cavity RF Group.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 26, 2010 University of California, Riverside,
Progress on the MICE Cooling Channel Solenoid Magnet System
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Status of 201 MHz Prototype Cavity and Curved Be Windows Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
MICE RF Module Safety Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting February 12, 2005.
201 MHz Cavity Studies Derun Li Lawrence Berkeley National Laboratory MuCool RF Workshop (Fermilab) July 7 and 8, 2009.
10 October 2006 MICE CM-16 at RAL 1 Distributed versus Lumped Coupling Magnets Michael A. Green and Soren Prestemon Lawrence Berkeley Laboratory, Berkeley.
MICE AFCSWG Safety Review Summary Mary Anne Cummings Dec. 17, 2003 MICE Video Conference.
D. Li and R. Rimmer, RF Workshop, Fermilab, MHz Cavity Refurbishment and suggestions on future tests Derun Li and Robert Rimmer* Lawrence.
Report from RF Session (1:30-5:40 PM, 3/30/2004) H. Haseroth and Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration.
201 MHz NC RF Cavity R&D Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory WG3 at NuFact 2004 July 28, 2004.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
1 Progress on the MICE Cooling Channel Magnets Michael A. Green Lawrence Berkeley National Laboratory 28 June 2005.
H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 1 RF & RF power H. Haseroth CERN  Situation of 88 MHz test cavity  Availability of amplifiers.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
5-Year RF R&D Plan Derun Li Lawrence Berkeley National Laboratory NFMCC and MCTF Phone Meeting Friday, September 18, 2009.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
NCRF R&D Programs and Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 28, 2004.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
MUCOOL RF Program Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 18, 2007.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
201-MHz RF Cavity Construction (Plan) for MICE Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory NFMCC Meeting March 17, 2008.
MICE RFCC Module Derun Li Lawrence Berkeley National Laboratory MICE Schedule Review RAL, UK May 24, 2011 May 24, 2011.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
Normal Conducting RF Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 5-6, 2013.
201 MHz Cavity Fabrication Update Derun Li Lawrence Berkeley National Lab MICE CM24 at RAL, UK June 1, 2009.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
MICE RFCC Module Status Derun Li Lawrence Berkeley National Lab NFMCC-MCTF Collaboration Meeting LBNL, Berkeley, CA January 25, 2009.
Experience with LEP (and LHC) cryo-modules Workshop on cryogenic and vacuum sectorisations of the SPL O.Brunner – November ’09.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
MTA RF Status 01/31/ 2007 NF&MCC Meeting UCLA A. Moretti.
1 Al Moretti, APC, Fermilab MAP- Winter Meeting February 28 - March 4, 2011 TJNAF Newport News, VA.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
Update on 201-MHz RF Cavity Construction (Plan) for MICE
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
RF Module Integration Colin Whyte University of Strathclyde on behalf of the MICE collaboration 1RF Review 9th & 10th Sept '15 Abingdon.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
RF R&D (Issues) for Muon Ionization Cooling Channels
Completion of the MICE-US construction project
Overview of the RFCC Module and 201-MHz Cavity Design
SNS Fundamental Power Coupler History
Presentation transcript:

Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA 94720

Absorber Safety Review, LBNL, Dec. 9-10, 2003 Outlines Introduction of RF cavities for MICE Introduction of RF cavities for MICE RF modules sit between absorbers RF modules sit between absorbers –Integral part of the whole cooling channel: interfaces of mechanical, vacuum, and sharing magnetic forces  safety –Operational issues Safety concerns and plans Safety concerns and plans –RF safety related –Absorbers related Summary Summary

Absorber Safety Review, LBNL, Dec. 9-10, 2003 RF Cavities for MICE Introduction of RF cavities in MICE cooling channel Introduction of RF cavities in MICE cooling channel –Eight cavities at MHz –Operating at ~ 8 MV/m with ~ 1 MW peak power (~ 1 kW average power) per cavity –Cavity phases can be adjusted independently –Thin Be windows to terminate beam irises Higher shunt impedance Higher shunt impedance Lower peak surface field versus open iris structures Lower peak surface field versus open iris structures

Absorber Safety Review, LBNL, Dec. 9-10, 2003 MICE Cooling Channel Eight MHZ RF cavities Three Absorber Modules

Absorber Safety Review, LBNL, Dec. 9-10, 2003 For each cooling channel ½ cell Four RF cavities sit in between absorbers Four RF cavities sit in between absorbers –Interfaces (vacuum seals & magnetic forces) –No vacuum windows for RF modules –No differential pressures on the curved thin Be windows: 0.38-mm thick and 21-cm radius –Absorber is an integral part of the RF module Mechanical stability (interface + magnetic forces) Mechanical stability (interface + magnetic forces) Vacuum seals for RF operations (may include RF conditioning) Vacuum seals for RF operations (may include RF conditioning)

Absorber Safety Review, LBNL, Dec. 9-10, MHz cavity concept Spinning of half shells and e-beam welding Water cooling channels Be window

Absorber Safety Review, LBNL, Dec. 9-10, 2003 Safety concerns on RF operation Standard RF interlock to preclude people being in the experimental area during operation and conditioning Standard RF interlock to preclude people being in the experimental area during operation and conditioning RF cavity conditioning and operations RF cavity conditioning and operations –With and without magnetic field –Multipactoring –Sparking, dark currents, x-ray radiation Coaxial RF loop couplers Coaxial RF loop couplers –May be conditioned separately –Multipactoring or sparking in the coaxial coupler –With and without magnetic field –Coaxial ceramic windows Isolate vacuum from air or pressurized gas while allowing RF to propagate without reflection Isolate vacuum from air or pressurized gas while allowing RF to propagate without reflection

Absorber Safety Review, LBNL, Dec. 9-10, 2003 Impacts on absorber safety and plans Sparking, multipactoring & high RF fields produce Sparking, multipactoring & high RF fields produce –More dark currents –Extra thermal load to absorbers (estimated to be less than a few watts) –Plan: monitor and minimize sparking rates (standard practice) vacuum gauge and arc detectors vacuum gauge and arc detectors If the thin Be window breaks (cracks) If the thin Be window breaks (cracks) –No shock wave to the absorber –No vacuum load to the absorber –RF power shuts down in less than ms (SW cavity) –Be hazard (unlikely to produce Be powders) requires ES&H personnel at RAL to check and clean the system Vacuum manifold to protect Be windows from having differential pressures Vacuum manifold to protect Be windows from having differential pressures

Absorber Safety Review, LBNL, Dec. 9-10, 2003 Concept to protect Be windows RF Cavity Vacuum Port PUMP Thin Be window

Absorber Safety Review, LBNL, Dec. 9-10, 2003 Impact of RF window breaking If a coaxial ceramic window breaks: If a coaxial ceramic window breaks: –Pressurized gas sucks into the cavity (slowly) –Unlike a shock wave, it usually takes many seconds to minutes; can be detected easily –To protect the Be windows: vacuum manifold to equalize the vacuum inside and outside of the cavity in the module –To prevent oxygen gets into the system from RF transmission lines, we plan to use pressurized nitrogen gas

Absorber Safety Review, LBNL, Dec. 9-10, 2003 Impact of water pipe breaking If water cooling pipe breaks If water cooling pipe breaks –One piece of pipe with joints outside the vacuum vessel –Unlikely water burst, but pinhole leakage (slow) –Vacuum gauge picks up first, not water flow meters –Be windows are protected by the vacuum manifold We plan to have We plan to have –Water valves and vessel pressure release valve –Interlock with vacuum Close both inlet and outlet of water valves Close both inlet and outlet of water valves Turn off RF power Turn off RF power

Absorber Safety Review, LBNL, Dec. 9-10, 2003 Summary Cavity conditioning and operation produce dark currents and x-rays  extra thermal load to absorbers at a few watts (small) Cavity conditioning and operation produce dark currents and x-rays  extra thermal load to absorbers at a few watts (small) Sparking is contained inside the RF cavities Sparking is contained inside the RF cavities Be windows are protected by vacuum manifold, ES&H personnel’s guidance at RAL in the worst cases (unlikely) Be windows are protected by vacuum manifold, ES&H personnel’s guidance at RAL in the worst cases (unlikely) RF window cracking is a relatively slow process, pressurized nitrogen gas not only helps to increase RF breakdown voltage, but also prevents oxygen from the system RF window cracking is a relatively slow process, pressurized nitrogen gas not only helps to increase RF breakdown voltage, but also prevents oxygen from the system RF interlock to preclude people in the experimental area during operations RF interlock to preclude people in the experimental area during operations Operation with strong magnetic fields may make everything worse Operation with strong magnetic fields may make everything worse