GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 1/19 Summary and Future Plans Eduardo do Couto e Silva Instrument Analysis.

Slides:



Advertisements
Similar presentations
GLAST LAT Project Calibration and Analysis Meeting, 28 Nov 2005 E. Grove et al. 1 Proposed Flight Trigger Configuration: Engines and Scheduler Table J.
Advertisements

GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 Preliminary Studies on the dependence of Arrival Time distributions in the LAT using CAL Low Energy Trigger.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
SVAC/PVOC&A Meeting, February 6, 2006 Anders W. Borgland 1 Instrument Analysis Activities Anders W. Borgland Science Verification, Analysis and Calibrations.
SVACInstrument Analysis Meeting, August 5, 2005 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project Integration and Test SVAC Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review SVAC Peer Review July 21,
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 1/19 Introduction to the Workshop Series Eduardo do Couto e Silva Instrument.
GLAST LAT ProjectOnline Peer Review – July 21, – Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo.
GLAST LAT ProjectIA Meeting – June 17,2005 E. do Couto e Silva 1 New additions to the main page.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 E. do Couto e Silva 1 Final Data Taking with SLAC (Data for Instrument Analysis Workshop 7) Eduardo do.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project Instrument Analysis Workshop June 7, 2004 Anders W. Borgland 1/16 What? Where How? Description of the Geometry What? Where How? Description.
SVACInstrument Analysis Meeting, September 23, 2005 Anders W. Borgland 1 GEM Discarded Events Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 1/7 Overview of Data Taking Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project 1S. Ritz All Hands Items 11 August 2004.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 1 Gamma-ray Large Area Space.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT Project 1S. Ritz DC1 Closeout Introduction February 2004 Steven Ritz Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project LAT Monthly Apr SAS 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope WBS 4.1.D SAS LAT Monthly Managerfest.
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
©2015, College for Financial Planning, all rights reserved. Session 16 From Recommendations to Monitoring – Sample Presentation & Client Communication.
R.Dubois Sim/Recon Overview 1/10 GLAST LAT ProjectSoftware Workshop July, SLAC Sim/Recon Overview Elements of Simulation/Reconstruction Development,
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
Fermi Large Area Telescope (LAT) Integration and Test (I&T) Data Experience and Lessons Learned LSST Camera Workshop Brookhaven, March 2012 Tony Johnson.
GLAST Large Area Telescope:
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT Project 1S. Ritz Data Challenge Planning Overview Purpose Boundary conditions Plan: –scope and progression of data challenges –schedule summary.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
FNAL PM kick-off Meeting June 17, 2010 E. do Couto e Silva 1/11 SuperCMDS at SNOLAB Ge Towers System Requirements Eduardo do Couto e Silva
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT Project Instrument Analysis Workshop September 27, 2004 E. do Couto e Silva 1/11 Overview of the Instrument Analysis Workshop Series Eduardo.
GLAST LAT Project Test Beam Meeting, Apr 18, 2006 E. do Couto e Silva 1/2 Beam Test Hardware Delivery Status Eduardo do Couto e Silva February 18, 2006.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
Nucleus – complete Campus Management solution
LAT Instrument Test Data Analysis in Context
GLAST Large Area Telescope:
Integration, Test, and Calibration
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope Instrument Science Operations Center
Integration and Test Organization Chart
Overview of Instrument Analysis Effort
Instrument Analysis Workshop Series
Overview Goal Study GEM variables in SVAC ntuple
How to succeed in my course, part 1
Integration and Test Organization Chart
GLAST LAT System Engineering
Introduction and Overview
Eduardo do Couto e Silva Feb 28, 2006
Overview Cost to Complete
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope: Deputy for Systems Engineering
Presentation transcript:

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 1/19 Summary and Future Plans Eduardo do Couto e Silva Instrument Analysis Workshop 1 SLAC, June 7, 2004

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 2/19 Data Constraints and Idiosyncrasies Data Constraints and Idiosyncrasies (LAT-TD-03775) is intended to collect LAT quirks –Started by Steve Ritz –Goal is to identify, document and capture LAT features (that’s not a bug, it’s a feature), gotchas, limitations or other issues –The lists provided during the Cal and Tracker presentations from this morning will be added to the document We need your help in documenting issues that you uncover during your test data analysis If you find any issues that should be documented in this list, please forward them to any of the following: –Eduardo (he’s first on the list because he’s making me build this chart for his presentation) –Pat Hascall –Steve Ritz From Pat Hascall in Systems Engineering

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 3/19 Sample Entry (Actually the only entry) Item 1: ACD GARC Header Parity Bit Design Error –One of the parity bits covering a portion of the serial data stream between the ACD FREE cards and the AEM is unusable, due to a design error. The issue and implications are described in LAT-TD Alternative data integrity checks, described in LAT-TD-03774, provide equivalent coverage. These integrity checks must be performed and monitored as part of the routine data reduction pipeline processing. From Pat Hascall in Systems Engineering

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 4/19 The LOGO Tkr1X0 Tkr1Y0 Tkr1DieEdge<5 Tkr1DieEdge>40 Oh no! Another project ! Tkr1DieEdge - Distance from die (wafer) edge of initial point (0 is halfway between the dies, increases toward center of die)

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 5/19 The LOGO X : Tkr1X0 Y : Tkr1Y0 Z : Tkr1DieEdge

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 6/19 It was not easy… 29 people signed up for the Workshop 29 showed up in the dinner –if someone did not pay please let me know, otherwise my wife will kill me… ~50 to 60 attended the sessions ! –I think it worked well, but time will tell… To get all of us here was a lot of work since we had to –Convince people that this was worthwhile –Work hard to get the infrastructure needed –Annoy people with continuous requests…

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 7/19 The SVAC Musketeers Xin Warren Eduardo Anders They won’t escape from the geometry review! C’mon Richard, this is not an unreasonable request… The calibration packages are mine ! No mercy, Let’s get that pipeline! Special thanks to the three Musketeers who worked around the clock !

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 8/19 Meanwhile in the SAS kingdom… Our reasonable requests were translated into the Gaudi Framework… Here they come again… The I&T Musketeers want the towers assembled upside down with a diagonal readout and in a grid with a dodecahedron configuration Of course, due yesterday… Cardinal “Richardlieu”

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 9/19 Sign up … 23 entries. LAT instrument Analysis list as of June 8, 2004 Please sign up if your name is not there

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 10/19 What next ? Project lists –Discussed this afternoon we have a lot of work ahead of us User Manual –I would like to prepare a user manual with the info from the workshop to help you analyze data Instrument Analysis VRVS meetings –Weekly basis so that we can follow up –I will call you periodically (to see if you miss California…) –Biweekly reports by me in Steve’s ANA meeting –Instrument Analysis List (IA) is set up (see next slide) Working Meeting in July –Core group (mostly local) –Evaluate where we are –Evaluate what to ask people to do with the EM2 data Workshop 2 in September with the Collaboration Meeting –2 day workshop (TBR) DATA TAKING starts in September/October ! –Would like to see SLAC for a longer period to analyze data

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 11/19 Thank you for coming My personal thanks to the “brains” behind it… Thanks for the Project Management for the Support : Peter, Steve, Lowell, Dick and Elliott Without Diana, Debbie and Chris this could not have been so enjoyable !