6-7 April 06 MAC Review Global Design Effort 1 RDR Overview Organization, Schedule, Approach and Goals Barry Barish GDE Caltech.

Slides:



Advertisements
Similar presentations
Report from the GDE director Barry Barish Snowmass 14-Aug-05.
Advertisements

Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
20-Nov-06 FALC - KEK Global Design Effort 1 GDE Report Barry Barish Caltech / GDE 20-Nov-06 RDR Design Freeze.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
13-Feb-06 RDR: Goals and Scope Barry Barish Fermilab RDR Meeting 13-Feb-06 ILC Design/Cost WBS.
The ILC Global Design Effort Barry Barish ILC Industrial Forum Japan 28-June-05.
11-Nov-06 ILCSC - Valencia Global Design Effort 1 GDE Report and Discussion of Costs Barry Barish Caltech / GDE 6-Nov-06.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
5 May 06 SLAC SPC 1 ILC Global Activities GDE, FALC Barry Barish GDE Caltech.
1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 1 ILC Report Barry Barish Caltech / GDE 1-Dec-06 RDR Design Freeze.
Status of International Linear Collider Global Design Effort Barry Barish (by telecon) HEPAP Washington DC 18-May-05.
20 April 06 P5 - SLAC Global Design Effort 1 ILC Update from the GDE Barry Barish GDE Caltech.
14-Dec-06 RDR Internal Cost Review Global Design Effort 1 GDE Internal Review ILC Reference Design Costing Barry Barish Caltech / GDE 14-Dec-06.
GDE Report to FALC Status and Plans Barry Barish FALC Fermilab 4-Nov-05 ILC Polarized Electron Source.
GDE: Progress Report Barry Barish ILCSC Report CERN 9-Feb-06.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
22-May-06 FALC - Rome Global Design Effort 1 Report on Progress of the GDE Barry Barish GDE.
Organizing the Linear Collider. Steps toward the ILC 1989 – 1996: Operation of the world’s only linear collider, the 90 GeV SLC at Stanford Linear Accelerator.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
6-7 April 06 MAC Review Global Design Effort 1 BCD Overview Process and Highlights Barry Barish GDE Caltech.
Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding.
US ILC Review by DOE/NSF Apr. 4-6 at Fermilab Consultant reviewers: Ilan Ben-Zvi (BNL/ATF &RHIC) Dixon Bogert (FNAL/NUMI) Isidoro Campisi (ORNL/SNS) Tom.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
Global Design Effort ILC: From RDR to EDR or “How to Spend the Money” Nick Walker GDE.
Global Design Effort1 September 20-22, 2006 MAC Review - Costs Toward a Cost Estimate for the ILC Tetsuo Shidara, Wilhelm Bialowons, and Peter H. Garbincius.
30-May-07 LCWS DESY Meeting Global Design Effort 1 A Vision of the Future RDR to ILC Barry Barish LCWS DESY 30-May-07.
8 May 06 ILCSC Report Global Design Effort 1 GDE R&D Program RDR Status and Plans Barry Barish GDE Caltech.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
Date Event Global Design Effort 1 ILC Engineering Design Phase - Status & Plans Mike Harrison GDE/BNL.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
6-7 April 06 MAC Review Global Design Effort 1 The Global R&D Board Bill Willis GDE Columbia University.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
GDE Plans for Next Year Barry Barish GDE Meeting Frascati 8-Dec-05 Orsay Coupler.
Brian Foster - Cosener's Forum May 06 1 The ILC - Status & Plans Introduction & latest developments The GDE The baseline design and R&D efforts The path.
On the Way to ILC Shekhar Mishra Fermilab Talk presented on behalf of ILC-GDE 2/16/06 Talk Presented at the 2006 Aspen Winter Conference: "Particle Physics.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
6-7 April 06 MAC Review Global Design Effort 1 RDR Management Accelerator Design Towards the RDR Nick Walker ILC-GDE.
04-Feb-07 GDE/ACFA Intro Beijing Global Design Effort 1 GDE Status Barry Barish 4-Feb-07.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
23-April-13 ECFA LC2013 Global Design Effort 1 Barry Barish ECFA LC2013 DESY Hamburg, Germany 27-May-13 GDE The path to a TDR.
ILC Global Design Effort Barry Barish GDE 9-March-06.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
Americas Regional Planning Exercises Tor Raubenheimer SLAC Beijing GDE Meeting February 4 th 2007.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
Global design effort Americas 1 FY08-09 ILC-Americas planning G. Dugan ILC-Americas Planning meeting SLAC Sept. 13, 2006.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
Report on plan to produce an Engineering Design Report
Technical Design Report preparation
ILC Global Design Effort
Barry Barish GDE Caltech
Presentation transcript:

6-7 April 06 MAC Review Global Design Effort 1 RDR Overview Organization, Schedule, Approach and Goals Barry Barish GDE Caltech

6-7 April 06 MAC Review Global Design Effort 2 ILC Timeline Global Design EffortProject Baseline configuration Reference Design ILC R&D Program Technical Design Expression of Interest to Host International Mgmt ….

6-7 April 06 MAC Review Global Design Effort 3 Next Goal – Reference Design Reorganized the GDE toward Design / Cost Effort A global effort to design / cost the ILC is underway and working Configuration Control; International Costing; Industrialization; Siting A sound design must be established with convincing and affordable costing. Review and guidance for the Global R&D program to demonstrate the ILC, improve over the baseline and reduce costs.

6-7 April 06 MAC Review Global Design Effort 4 ICFA FALC Resource Board ILCSC (MAC) GDE Directorate GDE Executive Committee Global R&D Program RDR Design Matrix GDE R & D Board GDE Change Control Board GDE Design Cost Board GDE RDR / R&D Organization Willis Garbincius Walker Foster Takasaki Dugan

6-7 April 06 MAC Review Global Design Effort 5 ICFA FALC Resource Board ILCSC (MAC) GDE Directorate GDE Executive Committee Global R&D Program RDR Design Matrix GDE R & D Board GDE Change Control Board GDE Design Cost Board Reporting technicalresources GDE RDR / R&D Organization

6-7 April 06 MAC Review Global Design Effort 6 ICFA FALC Resource Board ILCSC (MAC) GDE Directorate GDE Executive Committee Global R&D Program RDR Design Matrix GDE R & D Board GDE Change Control Board GDE Design Cost Board GDE GDE RDR / R&D Organization

6-7 April 06 MAC Review Global Design Effort 7 Change Control Board (CCB) MarkiewiczUS MishraUS FunkUS KuboAsia KurikiAsia PaganiEU BlairEU SchulteEU Nobu Toge (chair) Asia

6-7 April 06 MAC Review Global Design Effort 8 Design Cost Board (DCB) PhinneyUS PatersonUS KephartUS EnomotoAsia ShidaraAsia TerunumaAsia BialowonsEU DelahayeEU MuellerEU Peter Garbincius (chair) US

6-7 April 06 MAC Review Global Design Effort 9 Design Cost Board (DCB) The Design / Cost Board will be responsible for assessing and providing guidance for the overall RDR design effort program. The DCB initial goals will be to propose the overall structure and content for the RDR document to be developed by the end of It also will provide early guidance required to enable the design / cost effort to get fully underway by the time of the Bangalore GDE meeting. The DCB will set goals and milestones for producing the RDR, conduct design reviews and provide guidance and assessments of the RDR effort. The DCB will report to the Director and EC regularly as the design / cost effort progresses, reporting on early evaluations of costs, problems and changes needed in the BCD, etc. Garbincius

6-7 April 06 MAC Review Global Design Effort 10 Global R&D Board (RDB) PadamseeUS HimelUS WolskiUS HayanoAsia HigoAsia ElsenEU LiljeEU GarveyEU DamerellEU Bill Willis (chair) US

6-7 April 06 MAC Review Global Design Effort 11 Global R&D Board (RDB) The Global R&D Board will be responsible for assessing and providing guidance for the overall R&D program. The RDB will suggest priorities for the research facilities and R&D supporting the baseline, the R&D on alternatives to the baseline and selective R&D that could further the field in the longer term. The mission will also include global assessments and recommended priorities for the detector R&D program and evaluate the balance between accelerator and detector R&D. The RDB will develop a proposal driven program, structured in the sense of defined goals, and milestones, and resources evaluated on a common basis to allow comparison across different regions and national funding systems. It will conduct reviews and identify gaps in coverage of topics, resource or technical issues, duplications, and other concerns..

6-7 April 06 MAC Review Global Design Effort 12 ICFA FALC Resource Board ILCSC GDE Directorate GDE Executive Committee Global R&D Program RDR Design Matrix GDE R & D Board GDE Change Control Board GDE Design Cost Board ILC Design Effort ILC R&D Program GDE RDR / R&D Organization

6-7 April 06 MAC Review Global Design Effort 13 Approach to ILC R&D Program Proposal-driven R&D in support of the baseline design. –Technical developments, demonstration experiments, industrialization, etc. Proposal-driven R&D in support of alternatives to the baseline –Proposals for potential improvements to the baseline, resources required, time scale, etc. Develop a prioritized DETECTOR R&D program aimed at technical developments needed to reach combined design performance goals

6-7 April 06 MAC Review Global Design Effort 14 How and when to involve industry? Large Scale Project Characterization –Large Project Management –Precision Engineering –International Coordination –Costing Industrialization –Civil Construction & Infrastructure –Cryogenics –Superconducting RF structures, couplers, etc –Electronics and Control Systems –Large Scale Computing

6-7 April 06 MAC Review Global Design Effort 15 Coordinating the RDR RDR Management Group (Walker, Chair) –Guides the design/cost efforts on day by day basis –Composition - Accelerator Leaders (Walker, Raubenheimer, Yokoya); Cost Engineers (Shidara, Garbincius, Bialowons); Integration Scientist (Paterson) Coordinate both ILC design work and costing Reviews are to be conducted by Design Cost Board First Costing by Vancouver to have time for cost reductions by value engineering, scope options … Walker

6-7 April 06 MAC Review Global Design Effort 16 e- sourcee+ source Damping RingsRTML Main Lina cBDS Vacuum systems XXXXXX Warm magnet systems XXXX(X)X Cryomodule XX(X)XX Cavity Package XX(X)XX RF Power XX(X)XX Cryogenics XXXXXX Accelerator Physics XXXXXX Operations & Reliability XXXXXX Instrumentation XXXXXX Controls XXXXXX Systems integration XXXXXX CF&S XXXXXX Cost XXXXXX RDR Matrix Walker

6-7 April 06 MAC Review Global Design Effort 17 Almost complete for major items and cost drivers ILC Design Walker

6-7 April 06 MAC Review Global Design Effort 18 Ecloud: Threshold of electron cloud, 1.4x10 11 m -3. Ion: Feedback system can suppress for 650 MHz (3ns spacing), number of bunch in a train 45, and gap between trains 45ns.. Damping Ring Design Electron Cloud Walker

6-7 April 06 MAC Review Global Design Effort 19 RDR Cost Estimating 500 GeV BCD machine + “essentials” for 1 TeV Follow ITER “Value” & CERN “CORE” model for International Projects –Provides basic agreed to costs [common “value” + in- house labor (man-hr)] RDR will provide information for translation into any country’s cost estimating metric, e.g. Basis of Estimate => contingency estimate, in-house labor, G&A, escalation, R&D, pre-construction, commissioning, etc. Assumes a 7 year construction phase Garbincius

6-7 April 06 MAC Review Global Design Effort 20 Based on a call for world-wide tender: lowest reasonable price for required quality Classes of items in cost estimate: –Site-Specific (separate estimates for each site) –Conventional – global capability (single world est.) High Tech – cavities, cryomodules, regional estimates Cost Engineers will determine how to combine and present multiple estimates WBS ; WBS Dictionary; Costing Guidelines are mature enough to begin the cost estimating ILC Cost Estimate Garbincius

6-7 April 06 MAC Review Global Design Effort 21 WBS Level of Detail - Cryogenics % LHC refrig. single units Garbincius

6-7 April 06 MAC Review Global Design Effort 22 Technical Systems Vacuum systems Magnet systems Cryomodule Cavity Package RF Power Instrumentation Dumps and Collimators Accelerator Physics Global Systems Commissioning, Operations & Reliability Control System Cryogenics CF&S Installation Area Systems e- e+ damping RTML main BDS source source rings linac Cost Roll-ups Garbincius

6-7 April 06 MAC Review Global Design Effort 23 From Baseline to a RDR Jan JulyDec 2006 Freeze Configuration Organize for RDR Bangalore Review Design/Cost Methodology Review Initial Design / Cost Review Final Design / Cost RDR Document Design and CostingRelease Draft RDR FrascatiVancouverValencia

6-7 April 06 MAC Review Global Design Effort 24 TESLA Test Facility Linac - DESY laser driven electron gun photon beam diagnostics undulator bunch compressor superconducting accelerator modules pre- accelerator e - beam diagnostics 240 MeV120 MeV16 MeV4 MeV Willis

6-7 April 06 MAC Review Global Design Effort 25 ILC cryomodule string test facility planned for the New Muon Lab Upgraded FNPL will provide beam tests of ILC cryomodules (FY08 and 09) New Muon Lab (NML) FNPL Photo-Injector Fermilab – SCRF Test Facility Willis

6-7 April 06 MAC Review Global Design Effort 26 ILC R&D KEK STF Willis

6-7 April 06 MAC Review Global Design Effort 27 ILC R&D KEK ATF  ATF2 Yokoya

6-7 April 06 MAC Review Global Design Effort 28 ILC R&D DESY Cavity Preparation Electropolishing DESY Foster

6-7 April 06 MAC Review Global Design Effort 29 ILC RF unit at Fermilab Plan is to build one RF unit to be tested with Beam by Dugan

6-7 April 06 MAC Review Global Design Effort 30 RDR Goals The BCD is now being used as the starting point and basis for the reference design / cost effort this year. Our goal is to produce a consistent design for the ILC, capable of delivering design performance. We will make every attempt to contain costs for the basis machine, while determining costs on an “international basis.” The design will continue to evolve following the RDR, as the R&D provides CCB actions.