Overall Framework Decision Making (Unit 2) -CVP -Special Orders -Make or Buy -Capital Investments Cost Accumulation Systems (Unit 1) Corporate Strategy.

Slides:



Advertisements
Similar presentations
5 C H A P T E R Operational Budgets.
Advertisements

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Operational Budgeting Chapter 22.
Accounting 6310 Chapter 6 – Budgeting.
1 Budgeting Planning for Future Success Through Effective Resource Allocation.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Master Budget and Responsibility Accounting
OPERATIONAL BUDGETING
Standard Costing and Variances
1 Budgeting Dr. Varadraj Bapat Module 14.. Management Accounting Dr. Varadraj Bapat, IIT Mumbai 2 Index  Introduction  Objectives  Advantages  Components.
Budgeting.
Chapter 9 BUDGETING A budget is a formal written statement of management’s plans for a specified future time period, expressed in financial terms Control.
The Islamic University –Gaza
© 2009 Pearson Prentice Hall. All rights reserved. Master Budgeting and Responsibility Accounting.
Profit Planning (Master Budgeting). Learning Objective 1 Understand why organizations budget and the processes they use to create budgets.
Standard Costing and Variance Analysis
Operational Budgeting and Profit Planning
The Master Budget and Flexible Budgeting
Chapter 20 The Budgeting Process.
Cost Behavior Analysis
WHAT IS THE FUTURE FOR C&C?
Copyright © The McGraw-Hill Companies, Inc 2011 PROFIT PLANNING Chapter 8.
Budgeting and Standard Cost Systems Chapter 13. Budgeting A budget is a financial and quantitative plan for the acquisition and use of resources Use for.
5 C H A P T E R Operating Budgets.
Budgeting - 1 BUDGETING Sales projections Business trends Inventory needs New competition ? ? ? ?
1 The budgeting process The traditional goals of the planning and control process are: - to identify the economic goals and how to achieve them - to measure.
Flexible Budgets and Variance Analysis
Chapter 23 Flexible Budgets and Standard Cost Systems
CHAPTER © jsnyderdesign / iStockphoto 5 PLANNING AND FORECASTING.
Chapter 22 Master Budgets
Copyright © by Houghton Mifflin Company. All rights reserved.1 Financial & Managerial Accounting 2002e Belverd E. Needles, Jr. Marian Powers Susan Crosson.
C H A P T E R 5 Operational Budgets. Learning Objective 1 Describe the importance of personal budgeting.
Overhead and Marketing Variances Chapter Thirteen.
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead 11-1 Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides.
Aggregate Planning Chapter 13. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities & Work Design Products.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
14-1 CHAPTER 14 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. Cost Analysis for Planning.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e By Kim Langfield-Smith 11-1.
ACC3200 STANDARD COSTING.
© 2010 The McGraw-Hill Companies, Inc. Profit Planning Chapter 9.
CHAPTER SIX Budgeting. McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 6-2 Outline of Chapter 6 Budgeting  Generic Budgeting.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Flexible Budgets and Variance Analysis.
Chapter # 19: Sales Mix Considerations Margin of Safety Operating Leverage Cost-Volume-Profit Analysis Business Applications of CVP Additional Considerations.
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Needles Powers Crosson Principles of Accounting 12e The Budgeting Process 22 C H A P T E R ©human/iStockphoto.
© 2013 John Wiley & Sons, Ltd, Accounting for Managers, 1Ce, Ch 14 1.
1 Profit Planning Chapter 9. 2 The Basic Framework of Budgeting A budget is a detailed quantitative plan for acquiring and using financial and other resources.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Budgeting & Budgetary Control
1 Copyright © 2008 Cengage Learning South-Western. Mowen/Hansen Profit Planning Chapter Seven Fundamental Cornerstones of Managerial Accounting.
The Budgeting Process 7. OBJECTIVE 1: Define budgeting, and explain budget basics.
Managing Budgets. Question 2: total planning and operational variances Suppose a budget is prepared which includes a raw materials cost per unit of product.
CHAPTER 14 COST ANALYSIS FOR PLANNING McGraw-Hill/Irwin©The McGraw-Hill Companies, Inc., 2002.
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead.
Budgeting Fomefielding.comoter Text.
ACC602: Strategic Management Accounting Topic 3: Standard costs for control measures: flexible budgets and manufacturing overhead analysis Slides adapted.
Chapter 8: The Master Budget
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a.
Overhead and Marketing Variances
CHAPTER 21: BUDGETARY PLANNING
Planning for Profit and Cost Control
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Chapter 6 The Master Budget and Responsibility accounting
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Financial Management Budget = financial plan used to forecast needs, allocate resources, and track progress set goals and objectives record what is accomplished.
Presentation transcript:

Overall Framework Decision Making (Unit 2) -CVP -Special Orders -Make or Buy -Capital Investments Cost Accumulation Systems (Unit 1) Corporate Strategy Organizational Culture and Controls Performance Evaluation (Unit 3) -Budgets and other benchmarks -Variance analysis -Performance Measures and Control

Budgeting and Variance Analysis Terminology (today) Standards (today) Master Budgets (today) Flexible Budgets (today and Thursday) Variances (Thursday and beyond) –Production Variances –Sales Variances

Some Critical Terms Standards –An expected, or planned, amount of something The standard price for a raw material is what we expect to pay our suppliers per unit of the material The standard rate for direct labor is what we expect to pay our workers on an hourly basis The standard machine time per unit is how long we expect each part to take on a given machine The standard market share is the percent of the market that we expect our products to capture We eventually “dollarize” most standards into an amount per unit of our product

Some Critical Terms Master Budget –An aggregate representation of the firm’s expected activity over some future time period Calculated at one activity level (the most likely) for sales and production Assumes all activity occurs at standard expectations (selling, producing, capital spending, cash collecting, etc.)

Some Critical Terms Flexible Budget –Imagine a master budget set for production of 1,000 units. –Imagine that actual production was 1,100 units because of high demand –Imagine comparing master budgeted materials costs to actual materials costs –Would the manager look good?

Some Critical Terms Flexible Budget –The flexible budget adapts the master budget based on actual activity levels (in sales and production) –The flexible budget depicts what the master budget would have looked like had we accurately estimated activity levels. –The flexible budget is still based on standards

Some Critical Terms Variance Analysis –The comparison of actual activity and resource consumption to expected amounts –VERY FEW such calculations are appropriately done using master budget information –ALMOST ALL such calculations are appropriately done using FLEXIBLE budget information

Determination of Standards Standards are (per unit) expected levels of resource consumption “Ideal” standards assume 100% utilization and perfect implementation “Currently attainable” standards set at achievable work pace –include breaks, “normal” mistakes

Sources of Standards Activity analysis Historical data Benchmarking Market information –quality expectations –target costs Can be mandated or negotiated

Types of Standards Direct Materials –Usage: units of RM per unit of product –Price: cost of RM per unit of product Direct Labor –Usage: labor hours per unit of product –Rate: labor cost per unit of product Mix of materials inputs Mix of labor inputs

Types of Standards Variable Overhead –Usage: Amount of VOH charged per unit of product –Rate: VOH PDOR –Some VOH items, like electricity, may be more traceable than others Budgeted Fixed Overhead Fixed Overhead PDOR

Types of Standards Standards also exist for the selling side of the business –Prices and volumes –Sales mix –Market share –Market size

Standard Cost Card ResourceQuantityUnit CostSubtotalTotal Direct Materials X4 lb$25/lb Y1 lb40/lb Direct Labor5 DLH$40/hr VOH5 DLH$12/DLH FOH5 DLH$24/DLH

Why Budget? Planning –Helps identify resource requirements Coordinating –Communication tool across company units Motivation –Targets for performance Evaluation –Compare actual to expected performance

Strategic Planning External Scan Threats and Opportunities Internal Scan Strengths and Weaknesses Strategy Best Opportunities

Overall Budget Framework Strategic Goals Long Term Objectives Long Term Plan Short Term Objectives Master Budget Operations Capital Budget Internal Controls

Guidelines from top management Initial proposal: bottom or top? Factors: volume changes, new products Review, revise, review, approve (iterative) Budget Process Timeline JanDec Year Being Budgeted NovJune Ongoing Negotiations

Master Budget Framework Strategic Objectives (Short- and Long-Term Sales Forecasts Sales Budget Production BudgetAdministrative Budgets Direct Labor Direct Mats. Mfg. OH Sales & Mktg. Res. & Dev. Corp. OH Cash Budget Capital Budget Cash Collections

Purposes of Specific Budgets Capital Budget –Ensure funding for long-term projects –Ensure capacity requirements met Production Budget –Ensure demand and inventory goals met Materials –Ensure required materials available –Allow planning for purchasing contracts

Purposes of Specific Budgets Labor Budget –Ensure labor capacity adequate –Allow for informed choices among alternatives (e.g., overtime versus new hires) Cash Budget –Ensure enough cash for all activities –Avoid emergency borrowing –Plan investment of excess cash

Approaches to Budgeting Incremental –Ratchet up (or down) from previous year Zero-based –Budget as if current operation did not exist Activity-based –Budget based on activity transactions

Approaches to Budgeting Unilateral –Top management sets budget Top-Down –Top management makes initial proposal, negotiation occurs Bottom-Up –Operations-level employees make initial proposal, negotiation occurs

Budget Target Level Assume you are a worker and you can comfortably complete 100 units per day. At what level would you like your daily budget to be set? – Goal congruence

Budget Shenanigans Budgetary Slack –Expect 100, budget for 125 (expenses) –Expect 125, budget for 100 (sales) “Spending” the Budget –Budget for 125, spend 110, 15 left –Spend it or lose it (?)

Flexible Budgets Master Budget Process is “Static” –One level of activity –Can show how well firm is meeting production goals Flexible budgets are “dynamic” –“Flex” with level of activity –Can help show how well the firm is controlling its costs

Flexible Budget Preparation Determine relevant activity range Separate costs by behavior pattern Prepare Master Budget at expected activity level Prepare Flexible Budget at actual activity level –What MB would have looked like had the expected level been the actual level

Example Flexible Budget Master Budget at 8,000 units $21$168, , , ,200 Total , $74,000

Example Flexible Budget What if we actually sell 7,000? Actual Sales7,000 $ Total

What About Fixed Costs? Not expected to change across activity levels Reasons for inclusion: –Overall performance evaluation –Product costing –Profit planning (must remember to cover FC) Use amount of allocation base at most likely activity level to determine PDORs