The Perfect Shower Team – Clean Mikal Tirfe Sandra Wiese Negar Ehsan Tony Carosa Tim Plummer
Agenda Project Description (Sandra) Design Objectives High Level Implementation (Tony) Digital Control Unit User Interface (Negar) Analog Controls Mechanical System (Tim) Risk and Contingency Plan Cost Estimate (Mikal) Division of Labor Schedule
Primary Design Objectives To control the temperature of the shower Control the water pressure of the shower Manual user override Safe in shower user interface Shower ready indicator Build a working model
Secondary Design Objectives Continuous flow system Four user presets Low hot water warning Advanced user interface (such as optical or voice) Longest shower estimator Power System Metric/English unit selection
High Level Implementation
Digital Control Unit
User Interface Safe for in shower use Four seven segment LED displays Six function buttons (On/Off, Temp set, Pressure set, Up, Down, Emergency off) Five LEDs to indicate display mode
Analog Temperature Controls
Analog Pressure Controls
Mechanical System Build complete demo system Water pump PVC piping Catch tub
Risk and Contingency Plan Possible Risks Not able to build motor controller Sensor characteristics are not good enough for our purposes Unable to meet safety standards Team member unable to fulfill designated tasks Solution to Risk Use stepper motor and digital control Refine baseline objectives External shower control Re-evaluate schedule, workload, and baseline objectives
Cost Estimate Mechanical parts$ Digital Components$ Analog Components$ Total$500.00
Division of Labor and Responsibilities Sandra: Team Coordinator, Analog System Tony: System Interfaces, Digital System Negar: Analog System, User Interface Mikal: Digital System, User Interface Tim: Digital System, Mechanical System
Project Schedule
Questions?