The Perfect Shower Team – Clean Mikal Tirfe Sandra Wiese Negar Ehsan Tony Carosa Tim Plummer.

Slides:



Advertisements
Similar presentations
PARKER BOILER PARKER BOILER HOT WATER PIPING SYSTEM 1. 3 way valve and O.S.A. reset. 2. Single boiler piping schematic. 3. Single boiler with 3 way valve.
Advertisements

Chapter 4 — Control Principles Chapter 4 Control Principles Control System Components Sensors Controllers Controlled Devices Control Agents Control Functions.
Mini Jet Sample Dyeing M/C Daelim Starlet Co., Ltd.
Lahr,Fornberg,Groves,Henriquez,Lyons 2004 CAPSTONE PDR TEAM S.A.F.E. MEMBERS Sean Groves Alex Henriquez Shannon Lahr Aaron Lyons Anders Fornberg.
Fire Research Pump Boss 400 Pressure Governor
Voice Controlled Helicopter Team Members: Jonathan Lam, Mian Zhu.
Player Guitar Preliminary Design Review Lucas Gilbride Rick Denney Dan Forrester Randy Hood Lucas Gilbride Rick Denney Dan Forrester Randy Hood.
AccuMax Single Point Injection Operation (See Installation and Operation Manual for detailed instructions)
1 116 TEAM 116 SUBGROUP_NAME_HERE Critical Design Review 1/15/2015.
Diesel Generator Reliability: Lessons Learned from Storms
TemperSure Shower Temperature Control System 1 Shower Temperature Control System Tempero Systems Stephen Au-Yeung Francis Merin Victor Tai Jason Wong.
Auto - Drive An Automated Driving Range. Team Members Mike Loiselle Jared Beland Jeremy Paradee.
Auto - Drive An Automated Driving Range. Team Members Mike Loiselle Jared Beland Jeremy Paradee.
Team Impact Intelligent Helmet Impact System Preliminary Design Review January 29 th, 2008 Amanda Brodbeck Wei-Chu Liao Wei-Shen Liao Chris Mintle.
Microcontroller Position Sensors 1-3 Temp Sensor M Increment Motors Manual Override Power Motor Controller System Diagram.
Emergency Response Radio Ashok Basawapatna Joe Friedrichsen Chris Lasek Jeff Ritter.
Digital Guitar Recorder Team RAD – Michael McGuirk, Nick Herrera, David Wormus, Fesehaye G. Abrhaley.
Smart Rover Aaron Westphal Ben Merkel Joe Merrill Mike Wissolik.
Mars Rover TEAM CPNE Crossen Davis Peter Ramer Nancy Robinson Eric Rodriguez.
Team LIT Scott Butler Kristin Haeusler Michael Hatt Brock Smith.
Team GPS Rover Alex Waskiewicz Andrew Bousky Baird McKevitt Dan Regelson Zach Hornback.
The Mechatronics Design Lab Course at the University of Calgary Presented June 2, 2003.
Amr Aldaiel - Andrew Kravitz Katie Noble - Zack Taylor - Alan Yim.
COMPUCCINO Kalani Rathnabharathi Vithya Shanmugam Robert Armstrong Aaron Kulp.
C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 1 1 Some thoughts on RPC gas system slow control (Dongguan, 7/15/2008) Changguo Lu Princeton.
Kabuki 2800 “a real-time digital audio effects system for performance” team “Big Country” presents ECEN4610 Preliminary Design Review 14 September 2006.
COMPUCCINO Kalani Rathnabharathi Vithya Shanmugam Robert Armstrong Aaron Kulp.
2001, 2002 & 3012 Series Operation 2001, 2002 & 3012 Series Operation (See Installation and Operation Manual for detailed instructions)
AccuMax Multi-Point Injection Mechanics
Voice Controlled Helicopter Team Members: Jonathan Lam, Mian Zhu.
Team Members: Nahiyan Ali Shrabantee Chatterjee Vaibhav Kumar Alex Weigel Tao Zeng Advisor: Dr. Mani Mina Client: Senior Design Dr. Gregory Smith.
The Water Benders Final Presentations. Outline Introduction Project Description Motivation Problem Statement Objectives Customer Requirements Design Concepts.
Research Strategy Review: Heat Pump Water Heaters Thermostatic Restriction Valves Jennifer Anziano RTF R&E Subcommittee July 8, 2015.
1. 2  Team Members:  Dan Fenton (CE) – Team Lead  Ryan Muckel (ME)  Christopher Freeman (ME)  Derek Zielinski (EE)  Eric Welch (EE)  Kennedy Kong.
AS ICT.  Have an understanding of how organizations use ICT.  Be able to describe a number of uses, giving the hardware and software requirements. 
Intro Building automation describes the advanced functionality provided by the control system of a building. A building automation system (BAS) is an.
Trax Technologies Inc. Wireless Home Phone-Operated Assistant.
Power Plant Construction and QA/QC Section 5.4 – Key Systems and Components Engineering Technology Division.
Department of Electrical and Computer Engineering PDR Recipe.
Status Report #2 Automatic Child Safety Gate: Corry Winslow Roger Battles Philip So Description: A telescoping gate with sensor technology through the.
Viking Pump Flow Manager - Phase 2 Senior Design May
WHIRLPOOL STEAM WASHER Presented by: Rick Kuemin, MSA Training Director Brought to you by:
SOLAR POWERED SMART BLIND (SPSB) SYSTEM Smart Home Automation
Work Breakdown Schedule. Components Research and find all components  Pressure Sensor  Micro controller  LED Display  Operational Amplifier Order.
Fan Coils Units Control
Service Section Technical Training December 2005.
T BAC Speaker Name Slide 1 Earl Grey and The Boston Tea Party Present The Entourage.
ECEN 4610 Capstone University of Colorado Boulder, CO January 29, 2009 School of Rock PDR Cheyenne Aberle Drew Veldhuizen Swain Brooks Dan Reed.
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
I & C.
REFLOW OVEN MOCRO (Manually Operated Compact Reflow Oven)
Mid Semester Presentation October 4, Team Members Duties: Real Time Clock Website Kevin Wellman Electrical Engineering Reginald Lott Adam Teague.
Pressure Governor System Electronics. 2 Sentry Pressure Governor System Description The Sentry Pressure Governor System (SPGS) is a J1939 CAN based pressure.
The complete flow monitoring solution Measure – Display – Switch – Transmit.
Smart Bench Press System Dat Lee, Sophia Mercurio, Johnny Peguero ME 5643 Final Project Presentation.
Deep Touch Pressure Abdomen Belt Group 32 Kevin Rathbun & Luke Fleming & Chang-O Pyo ECE 445 Senior Design April 28, 2015.
Output and Actuator Output: Any signal or information, digital or analog that has been decided in a system by a systematic processing way is known as.
ADVANCED WATER LEVEL CONTROLLER
Fluid Power Control.
Date of download: 10/9/2017 Copyright © ASME. All rights reserved.
Capstone Presentation 1
Team #3: Group Members Adam Davis Tony Johnson Peter Meyer Isaac Krull
Depth Finder 600 JAPIT Technologies
MAUVE CO2 cooling review
MPU-16A / FPU-16 TEST UNIT TUTORIAL
A.I. and the Automation of Oil Clean Up
Check List Tool Kit A description of your check box can be placed here
Domestic Hot Water Recirculation
‘‘ BUILDING AUTOMATION’’
Presentation transcript:

The Perfect Shower Team – Clean Mikal Tirfe Sandra Wiese Negar Ehsan Tony Carosa Tim Plummer

Agenda  Project Description (Sandra)  Design Objectives  High Level Implementation (Tony)  Digital Control Unit  User Interface (Negar)  Analog Controls  Mechanical System (Tim)  Risk and Contingency Plan  Cost Estimate (Mikal)  Division of Labor  Schedule

Primary Design Objectives  To control the temperature of the shower  Control the water pressure of the shower  Manual user override  Safe in shower user interface  Shower ready indicator  Build a working model

Secondary Design Objectives  Continuous flow system  Four user presets  Low hot water warning  Advanced user interface (such as optical or voice)  Longest shower estimator  Power System  Metric/English unit selection

High Level Implementation

Digital Control Unit

User Interface  Safe for in shower use  Four seven segment LED displays  Six function buttons (On/Off, Temp set, Pressure set, Up, Down, Emergency off)  Five LEDs to indicate display mode

Analog Temperature Controls

Analog Pressure Controls

Mechanical System  Build complete demo system  Water pump  PVC piping  Catch tub

Risk and Contingency Plan Possible Risks  Not able to build motor controller  Sensor characteristics are not good enough for our purposes  Unable to meet safety standards  Team member unable to fulfill designated tasks Solution to Risk  Use stepper motor and digital control  Refine baseline objectives  External shower control  Re-evaluate schedule, workload, and baseline objectives

Cost Estimate  Mechanical parts$  Digital Components$  Analog Components$  Total$500.00

Division of Labor and Responsibilities Sandra: Team Coordinator, Analog System Tony: System Interfaces, Digital System Negar: Analog System, User Interface Mikal: Digital System, User Interface Tim: Digital System, Mechanical System

Project Schedule

Questions?