Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Pedro Calderón Riaño Guillermo Buenadicha.

Slides:



Advertisements
Similar presentations
XMM XMM-NEWTON TTD Meeting: 8 April OPS-OAX (J. Martin) Autocommanding J.Martin, XMM-Newton SOE.
Advertisements

Status update of ASM on Swarm Charlie Swarm 4th DATA QUALITY WORKSHOP 2 December 2014 GFZ Potsdam Jean-Michel Léger.
XMM Calibration/Ops Meeting Mallorca October Using 3X3 Binned Mode for MOS Cameras for Fast(er) Imaging Tony Abbey, Leicester University.
DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 1 PMOD/WRC Davos november 2010 Présenté par : JP. Marcovici Sigle.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting MPE
XMM-Newton 1 Michael Smith, ESAC PN Monitoring MPE, May 2006.
MPE, 4th of May 2006 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 4th of May 2006.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting November 6, 2007, Mallorca María Santos-Lleó (XMM-Newton Science Support.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Palermo, April 2007.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton EPIC SW Status Guillermo Buenadicha TOS/OFX, SOC Operations Support Group MPE, 4 th.
XMM-Newton 1 M.Stuhlinger/M.Smith, ESAC PN Monitoring Mallorca, November 2007.
XMM-Newton Status of EPIC Operations Guillermo Buenadicha & Pedro Calderón Mallorca 8-April-2008.
6 November 2007Cal-Ops Meeting Mallorca Recent Results from EPIC MOS Life Test Facility Tony Abbey and Craig Brown University of Leicester Space Research.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton MOS Timing Mode calibration Marcus.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Calibration of the EPIC MOS Timing.
XMM-Newton 1SCI-SA Populating the CCF Immediate needs are driven by the requirement to test the SAS over the summer before public release. (A release called.
XMM-Newton 1 M.Stuhlinger/P.Calderon, ESAC Re-appearance of the MOS1 CCD1 meteorite column during revs Madrid, 23. March 2010.
XMM-Newton 1SCI-SA Status of MOS and PN Realtime Operations 1) Current Operations Status 2) Eclipse preparation improvements 3) Slew Exposures 4) Offset.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC A time jump analysis on EPIC-pn with some side results Marcus G. F. Kirsch M.J.
Images script M. Ehle & Rosemary Willatt (ESAC) April 2007.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting April 8, 2008, Mallorca María Santos-Lleó (XMM-Newton Science Support Manager)
XMM 1 MOS2 CCD5 anomaly Status of the investigations.
I. de la Calle Astronomy Science Operations Division Science Operations Department Background Working Group Meeting, Mallorca – 30/03/2009 XMM-Newton ESAC.
EPIC TTD#16 SCIENCE OPERATIONS MPE, 04 May 2006 L. Metcalfe SCI-SDX XMM-Newton Science Support Manager 1 Science Operations & Data Systems Division Research.
XMM EPIC MOS Andy Read for the BGWG CAL/OPS/BG Meeting Palermo, Sicily 11-13/04/07 EPIC Background Working Group Summary: Meeting.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, October 2006.
Mallorca, 1st of February 2005 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 1st of February 2005.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC XMM-Newton Instrument Anomaly Tool & Cross-Calibration Tool Marcus G. F. Kirsch.
XMM 1Michael Smith, ESAC EPIC PN Monitoring Provided by Michael Smith.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton EPIC SW Status Guillermo Buenadicha TOS/OFX, SOC Operations Support Group Palma de.
Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.
Page 1 ACTIONS EPIC_10/1 on Munoz. EPIC_10/1 on Munoz. –Closed: MS delivered Slew Data Files  EPIC_10/2 on Smith: to verify whether PHS_tools checks for.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting Mallorca
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Energy calibration refinement of the EPIC-pn Burst mode M.G.F. Kirsch 1, E.
1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Ops. AGENDA Operations status and.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Guillermo Buenadicha PALERMO 11/04/07.
XMM 1 EPIC MOS Monitoring. XMM-Newton 2 Martin Stuhlinger, ESAC MOS Bad Pixel Monitoring.
Guillermo Buenadicha / Neil Cheek SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Guillermo Buenadicha Neil Cheek MALLORCA 26/10/2006.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Long term EPIC in-orbit calibration plan Marcus G. F. Kirsch.
Science Operations Status Maria Santos-Lleo EPIC cal & ops meeting, Madrid March, 2010.
XMM-Newton EPIC OCB, 6-Nov-2007 EPIC OCB, 6-Nov XMM-Newton Future Instrument Operations Mallorca, 6 th -7 th November 2007 M. Casale, J.R. Muñoz.
RGS/MOS-cooling Results February 03, 2003 L. Metcalfe 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton.
EPIC Calibration Meeting, Madrid Correcting spatial inhomogeneities of the absolute energy scale K. Dennerl, 2010 March 23 Correcting spatial inhomogeneities.
EPIC Calibration Meeting, Mallorca Origin of gain offsets K. Dennerl, 2008 April 8 Origin of gain offsets: new insights from eROSITA calibration Mallorca,
ISUAL Long Functional Test H. Heetderks. TRR December, 20012NCKU UCB Tohoku ISUAL Long Functional Test Heetderks Basic DPU Function Verify Power on Reset.
PACS SOVT-2 (SIMS) and CAPs development MPIA PACS ICC Meeting #32 1 st – 3 rd April 2009, MPE Garching Markus Nielbock (MPIA)
Chapter 8: Systems analysis and design
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
SAG+SASWG Meeting Potsdam /15 PN Tasks – Status Report (update since Leicester) Hermann Brunner - MPE  epframes:  The dark quadrant problem.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
May 21, 2009John MacKenty, STScI1 WFC3 SM4 Events and Current Status.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
GIST th -16 th Dec B.Stewart RAL Mirror Anomaly Review Board Update.
CIVA Status Venezia, Palazzo Cavalli Franchetti March 31, 2009 Philae Science Team Meeting.
Mission Operations Review February 8-10, 2010 Cordoba, ARGENTINA SECTION 16.x Aquarius Science Commissioning and Acceptance Draft 2 Prepared by: Gary Lagerloef,
JEM-X Status S. Brandt on behalf of the JEM-X team Partly based on a presentation at ESOC, Feb 2005 at review marking the end of the nominal INTEGRAL mission.
Software Quality Assurance and Testing Fazal Rehman Shamil.
The Slow Slew Survey Richard Saxton / Pedro Rodriguez November 2006.
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Ops Portal New Requirements.
ESA UNCLASSIFIED – For Official Use HSO-OP - Solar and Planetary Missions Division Solar Orbiter Instrument Operations, Data Handling and FDIR Ignacio.
GIST Meeting 5 February MSG-1 - PROGRAMME STATUS Presentation to the GERB GIST/PSG meeting.
InnoSys Park Brake Tool Master Control Panel Screens Revision A, 12Dec /12/20071.
Spring Hill Assembly1 InnoSys Park Brake Tool Master Control Panel Screens 1 3-Mar-2008.
Summary of the technical stop activities on collimators (w17, 2012) O. Aberle – 07/05/12.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, April 2008.
Polar Flight Laptop Application v v Flight Crew Display Baseline File Updated: 23 July 2014 Developer: UAB-CBSE DGUEEXPRSPOLRST1021.
AliRoot survey: Calibration P.Hristov 11/06/2013.
SMOS IOCP KP0, 9 December SMOS DPGS at KP0 1.Production 2.Product Quality 3.Problems Identified 4.Positives.
H. Rème, I.Dandouras and A. Barthe IRAP, Toulouse, France
Presentation transcript:

Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Pedro Calderón Riaño Guillermo Buenadicha MALLORCA 05/11/2007

Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 2 XMM-Newton Contents Status of operations since Palermo Pedro Calderon Future activities and open points Guillermo Buenadicha

Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 3 XMM-Newton Overview Smooth operations, in general MOS2 +32 Volts line drop New hot stuff, 3X3, CCD6 check New MOS CCD thermal control Future procedure changes

Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 4 XMM-Newton Routine Operations RBI clock resync every ~194 days –Last on May 29 th, next on December 10 th Eclipse season fully nominal. –All performed automatically by timeline. A MOS-2 exp in Full Frame 2 Nodes mode –The exposure was erroneously planed. This mode is not commissioned. –A TC failed during the reconfiguration after the end of the exposure. The activity has a flaw at that point -> to be corrected.

Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 5 XMM-Newton MOS2 +32V drop The voltage in the +32V line drop instantaneously to 0 volts in the middle of a normal observation, the CCD stop generating events, and no other telemetry parameter showed any change or spike. After a switch OFF / switch ON the instrument returned to full nominal. Happened a similar incident in MOS-1 on 2002 (NCR#105), but never again. MRB with Saclay, Leicester and ESAC Suspected a SEU in EMVC electronic ??

Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 6 XMM-Newton New Hot Stuff New versions of the MOS Offset Tables –Now at version V12 New versions of the PN Bad Pixel Tables –Fixed the bright 64 column in CCD 11 Changes in place since Rev 1389 (July 11 th ) but they were not in full use until Rev 1408 (August 16 th )

Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 7 XMM-Newton MOS 3x3 pointed obs Mode tested on March 30 th Real observation performed in May 2 nd on PSR B (rev 1354, OBS_ID , ) Real observation performed in May 2 nd on PSR B (rev 1354, OBS_ID , routine calibration obs) Operations OK

Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 8 XMM-Newton New ED for CCD6 checks New ED now available Last check performed on October 29 th using the new ED The operation was quick and easy No changes in results (still full of AFFA hex events)!!!

Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 9 XMM-Newton CCD6 image

Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 10 XMM-Newton New MOS CDD thermal control Exist only 1 circuit (plus redundant) for the 3 cameras CCD substitution heaters. If heater are ON for one camera, they are ON for all. If a camera has problems, all cameras are heated => bad science The new idea : avoid heating the CCD of the cameras that are still working

Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 11 XMM-Newton New MOS CDD thermal control How to do that? Allowing the unpowered CCD to cold down to the minimum tested temperature (-140 degC). That is near to the external radiator temp, so a lot of time is needed. Then trigger heaters ON up to operational temperature, and switch OFF again Heaters will be ON for limited time, so the impact in the other cameras is reduced All this is done via manual procedure

Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 12 XMM-Newton New MOS CDD thermal control

Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 13 XMM-Newton Future actions Change of procedures to recover PN from Safe Standby Now PN never goes normally to SSB, but the procedure should be up to date any way The idea is switch off all PN, switch on the substitution heaters, and when all temperatures are good (remember the problem with the currents when the EPVC is cold, NCR#90), do a full switch on.

Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 14 XMM-Newton Future activities & open issues MOS redundant node readout MOS and PN, comparison of timing flux Rev 1325 Crab timing Periodic CCD-6 health check PN activities foreseen Slew survey S2K support

Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 15 XMM-Newton MOS redundant node readout Action pending since May 2006 The rationale is twofold: –Assess the capability to react against a HW failure in MOS (similar to RGS-2 case) –Gain expertise at ESAC building MOS sequences Sequences currently in DB? Too many… –All delivered sequences were kept since launch (and even since FM) –Naming convention has never been consistent –Not all of them used In Flight –However, there are some sequences capable of reverse clocking  tests in April 2005, MOS-1 CCD-6

Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 16 XMM-Newton MOS redundant node readout How to proceed? –When –It is a task not too urgent, but desirable to be done before T. Abbey runs away –If current DB sequences are able to do the job, then the design part is not an issue –Do we aim for Spring 2008? –Who –Ideally engineers at ESAC and T. Abbey + TBD replacement? –How –Either developing new sequences from scratch, or using the DB ones, followed by tests at the Spare and/or on the real unit. –Last step would be the creation of the DB items (ED’s) to cope with eventual node failure.

Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 17 XMM-Newton Timing events PN/M1/M2  Project started by M. Kirsch and John Olaffson (trainee at ESAC).  The idea is to analyze and compare the normalized flux in timing observations among EPIC cameras  Study is still ongoing, some preliminary cases required some support to understand deviations from a nominal ratio – –Cases in which MOS-1 deviates (above) from MOS-2 and PN (possible influence of MOS-1 hot column under weak sources) – –Cases in which both MOS deviate (below) from PN, all in counting. Analysis is required to assess influence of MOS CCD stuck mechanism and the SAS processing of GTI.  Screening of data is ongoing, also the Long Term Archive for HK analysis is being populated.

Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 18 XMM-Newton 1325 Crab timing… M. Kirsch reported a 600 microseconds absolute time deviation in the Crab observation in rev Nothing abnormal detected in ODF Timing files and no G/S problem found. A TCS generation problem after the given epoch was found at MOC due to old Orbit products. However, TCS vs. TCX analysis seems OK, shows TCX is independent on the MOC orbit file. Mission long TCS vs. TCX analysis is required just to find different behaviors among files. TCX is available and in use for timing observations through SAS.

Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 19 XMM-Newton Periodic CCD-6 health check Past operations –Tests in April 2005 after CCD failure –TTD in MPE May 2006 recommended periodic switch on –Done twice in 2007 (March and October) without success… Is it still worth it? –It is not really time consuming at MOC or SOC, since now is almost fully automatic. Can we link this activity to some periodic calibration or diagnostic for MOS? –Helps programming the activity regularly

Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 20 XMM-Newton PN activities foreseen Past non routine operations since Palermo –Minimal (not to say none!!!) Situation seems very stable for the instrument Any idea or suggestion to: –Improve operations? –Exercise operations under failure cases?

Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 21 XMM-Newton Slew survey, are we done through Past operations –Already reported by Pedro, real target in May. Future activities and open points –Offset maps required?  current ones are still theoretical –Calibration items?  What would be the calibration efforts and type of tests? –Others?

Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 22 XMM-Newton S2K in Spare support Support in the validation of the S2K once it is integrated in the Spare chain. Adaptation of DB items to spare (offsets, BP’s, clocks, voltage settings). Define a mirroring mechanism to upgrade Spare DB in line with future operational concepts.