GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 Martin Nordby1 Mechanical Systems Martin Nordby Stanford Linear Accelerator.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
Advertisements

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 7.1 Stress Analysis 1 GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 R.P. Johnson, UCSC 1 Silicon-Strip Tracker Converter Robert P. Johnson Santa.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectQuarterly Review of the GLAST/LAT Project, August 14, 2001 Martin Nordby1 GLAST Large Area Telescope: Mechanical Systems Martin Nordby.
LAT-PR Section 44-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
LAT-PR Section 22-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
Page 1 GLAST LAT ProjectAugust 30, 2004 GLAST Large Area Telescope: LAT Accelerometer and Thermal Instrumentation Review Presented by Leonard Lee John.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
1 Mirror subsystem: telescope structure Functions: Functions: Support mirrors subsystem to S/C Support mirrors subsystem to S/C Accommodate cryostat Accommodate.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 1 Introduction & Science Overview 1 GLAST Large Area Telescope: Introduction.
LAT-PR Section 33-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
LAT-PR Section 55-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
1 SPP FIELDS MEP Main Electronics Package Preliminary Design Review Bill Donakowski UCB/SSL 13/14 NOVEMBER 2013 MAVEN PFDPU Flight.
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
LAT TVAC Test Delta-PDR1 GLAST LAT Project25 May 2005 LAT Environmental Test Planning and Design Delta-Preliminary Design Review 25 May 2005 LAT T-Vac.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section 4.4 Heat Pipe Design and Analysis1 GLAST Large Area Telescope: Mechanical.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Prat CNRS/IN2P3-LLR Ecole Polytechnique GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
Date of download: 5/29/2016 Copyright © 2016 SPIE. All rights reserved. Drawing of the Space Infrared Telescope for Cosmology and Astrophysics (SPICA)
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
Rose Navarro HMI Lead Thermal Engineer
GLAST Large Area Telescope:
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2007.
GLAST Large Area Telescope:
7E: Tower test plans GLAST Large Area Telescope: Tracker Subsystem
GLAST Large Area Telescope:
GLAST Large Area Telescope
1. Introduction and Overview
GLAST Large Area Telescope:
GLAST Large Area Telescope:
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2008.
GLAST Large Area Telescope:
LAT Thermal Systems Analysis
Introduction and Overview
GLAST Large Area Telescope:
GLAST Large Area Telescope:
THERMAL CONTROL SYSTEM
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Mechanical Systems Martin Nordby Stanford Linear Accelerator Center Stanford University GLAST LAT Mechanical Systems Engineer Martin Nordby Stanford Linear Accelerator Center Stanford University GLAST LAT Mechanical Systems Engineer

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby2 Mechanical Systems  Overview  Mechanical Systems work breakdown and organization  Parameters management  Technical update  Scheduling and milestones  Budget summary  Issues Outline

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby3 Large Area Telescope (LAT) Design Overview Grid Structure Calorimeter Tracker Anticoincidence Detector Electronics Thermal Shield

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby4 LAT Mechanical Layout Thermal/micro-meteorite shield (MLI and ceramic blankets) Radiator (aluminum) LAT Model with Radiators and Subsystem Stay-Clears Grid support structure (aluminum) Spacecraft mount points (4x) Radiator mounts to SC Heat pipes on top and sides of Grid (aluminum) ACD Tracker Calorimeter

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby5 Mechanical Systems Work Breakdown Mech Systems WBS maps to the three key functions of the subsystem Mechanical Design Integration – Management: SC interface development; materials – Reliability and Quality Assurance – Mechanical Systems Development: mech design, analysis – Thermal Systems Development: thermal design, analysis System-Level Hardware Development – Thermal Control System – Radiators – Grid: development and fab of Grid support structure LAT I & T Support – Subsystem Integration and Test: verification testing – LAT I&T Support –4.1.8.AMission I&T Support

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby6 Mechanical Systems Organization

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby7 Parameters Management: Mass Mass estimate –Current estimates rolled up from subsystem details, supplied by subsystem engineers –Estimates updated quarterly Reserve analysis from ANSI/AIAA G –Independent reserve analysis for Proposal supports AIAA estimating analysis –Analysis plans for controlled draw-down of reserve

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby8 LAT Mass Budget LAT Mass (kg) TKR487 CAL1463 ACD199 Mech192 Elec180 Other0 Total2521 (Eff. Date: 18-Jan-01) Review Threshold Current Estimate ProposalSRRFeb-01 JOGPDRCDRPSR Budget (kg) Estimate (kg) DateNov-99Sep-00Jan-01Aug-01Aug-02Oct-04 Threshold (kg)

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby9 Parameters Management: Dimensions and Volume Three sets of interface volumes being defined –Stay-clear dimensions: subsystem volume allocation managed by table and LAT stay-clear drawing –Integration allowance: the volume and access needed for subsystem integration –Operational stay-clear: region needed for expected static or dynamic motion (a.k.a.: gaps) ICD’s will be developed for each subsystem, as information about the interfaces matures Instrument Outside Dims (m) WidthHeight Gap between TKR stay-clears Module pitch Instr. max dim SI-SC IRD stay-clear square C.G. of instr off Grid bottom TKR SSD size TKR module stay-clear CAL CsI Logs (W x H x L) CAL Module stay-clear ACD ACD stay-clear inside dim ACD outside dimension Thermal Blanket outside dims Top of Therm Blank from Grid Grid Outside dim of Grid

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby10 Key Requirements Thermal –Total dissipated power (orbit average) < 650 W –35 °C operational temp range (-10 °C to +25 °C) Stiffness: first-mode natural frequency > 50 Hz Stability: pointing error knowledge < 10 arc-seconds Operations: point anywhere, anytime Mass: total mass < 3000 kg Volume: footprint and center-of-gravity constrained to dimensions in the SI-SC IRD

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby11 Technical Status: Thermal-Mechanical Analysis Analysis to understand thermal behavior of the LAT –Total power dissipated: 518 W –Heat pipes used for channeling heat to perimeter of LAT Minimize transverse temperature gradients Reduce peak temperature of the TKR Steady-state analysis results –Heat conducted up to heat pipes 40% of heat from Grid base  T = 4 deg C –Grid bows due to gradients +/-120  m Concave upward –TKR’s tip due to Grid bow  X = 100  m at top of TKR module Angle = 42 a-sec 1.5 mm gap closes by 100  m 3/8” Heat pipes on sides held to 0 deg C ACD and SIU boxes in corners cause corner hot spots (5 C) Temperature Contour Plot of LAT (half-model, looking at symmetry plane)

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby12 Technical Status: Dynamic Response to Launch Investigating modes and deflections due to launch loads –4- vs. 8-point mount to spacecraft –LAT stiffness from CAL, TKR –Dynamic motion of TKR Modal analysis –Drum-head mode, F 2 = 60.5 Hz –CAL bottom plate stiffens Grid –Spacecraft mount 4 and 8-point mount results in same drumhead mode 4-point support results in a twisting mode, F 1 = 41.9 Hz Structural analysis –1.5 mm gaps between TKR modules close by 396  m in 6.6 g loading –LAT analysis results used to size hardware for CAL mounting to Grid Drumhead mode F2 = 60.5 Hz ggd49l5mod2

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby13 Technical Status: Thermal Environment Analysis Determining variations in environmental heat load and effect on the LAT –Extreme cases of orbital radiative heat load –Coupling of changes in external heating to internal LAT temperature –Performance requirements for the Radiators On-orbit radiation analysis –Worst-case pointed-mode load change: 0 to 500 watts/orbit –Total heat dissipation needed Generated by LAT: 650 W Parasitic from SC: 10 W Environmental load: 250 W (orbit averaged) –Using variable-conductance heat pipes (VCHP’s) on radiators to isolate LAT from external heat source (sun, earth) Future work –Currently investigating scanning-mode heat load fluctuations for full range of beta angles –Dynamic thermal response of the LAT to variable heat loads on radiators

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby14 Interface Design: Calorimeter and Tracker Calorimeter interfaces –LAT analysis shows that CAL bottom plates stiffen Grid –Analysis being used to size CAL tabs and hardware –Interlocking tabs leave gaps for CAL, TKR cable routing Tracker interfaces –Structural analysis shows that 1.5 mm gap is adequate –Thermal analysis shows static tipping of TKR is OK, with dynamic analysis needed –Flexure support for TKR is being developed now Accommodates thermal expansion mis-match and and distortion effects between CFC Tracker and aluminum Grid Underside View of LAT Grid

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby15 Interface Design: ACD and Spacecraft ACD interfaces –Modal analysis shows that ACD decoupled from TKR is adequately stiff ACD structure deepened to carry loads F 1 = Hz (top panel) –ACD electronics packaging around perimeter under investigation –Impact on LAT, Grid being evaluated Spacecraft interfaces –Spacecraft mounting 4-pt mount minimizes over-constraint Will investigate alternate concepts to avoid first-mode twisting of LAT –Radiator stiffness and SC mount locations Proposed 2-pt mount on SC sides F 1 = 77 Hz, with stiffened radiators Will work with SC Study contractors rad12l1mod1 F1 = 77 Hz for Stiffened Radiator with 2-Pt Mount ACD F1 = Hz acd4el1

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby Mechanical Systems Schedule Currently developing Mechanical Systems schedule Scoping work Identifying key milestones oEstablishing linkages to other subsystems, especially I&T

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby17 Mechanical Systems Milestones Mechanical Systems Requirements Review04/11/01 Mechanical Systems PDR05/23/01 LAT Instrument PDR08/06/01 Engineering Model (EM) Grid Complete05/10/02 Mechanical Systems CDR05/22/02 LAT Instrument CDR08/05/02 Flight Grid Ready for Integration10/01/03 Flight Radiators Ready for Integration08/15/03 Radiator Thermal Balance Testing Complete05/21/04

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby18 Interim Mechanical Systems Cost Estimate* Escalated k$ *DOE/NASA funding Interim cost estimate based on Proposal cost estimate Currently developing and checking grounds-up re-estimate

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby19 Issues Static thermal behavior of the LAT understood; effects of dynamic changes being analyzed –Modelling dynamic changes in temperature, due to external environmental changes –Will work to characterize/specify expected internal dynamic power fluctuations –Investigating thermally isolating heat loads from back of CAL LAT mounting to spacecraft –SC Accommodation Study includes a coupled-loads analysis to understand possible twisting modes of LAT –Will investigate 4-point and 8-point mounting options with SC contractors ACD mass and new baseline design –System-level trades are underway –Working with ACD subsystem engineers to understand implications on mass and volume budgets for the ACD