1 DØ trigger system 3 levels L1 deadtimeless L1 deadtimeless L2 100  s L2 100  s L3 farm, 50 Hz L3 farm, 50 Hz Brown involvement L2 STT L2 STT L1CTT.

Slides:



Advertisements
Similar presentations
Arnaud Lucotte ISN-Grenoble J/ e + e - selection at D RunII Arnaud Lucotte (ISN Grenoble) Introduction A. J/ production at the TeVatron 1. Prompt production:
Advertisements

Track Trigger Designs for Phase II Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen, S.X. Wu, (Boston.
L2 Online Reinhard Schwienhorst DAQ shifters meeting, 03/12/02.
1 Installation Review Stefan Grünendahl CTT Installation Plan Current status General plan Power supplies + permits Basic installation + checking.
The Silicon Track Trigger (STT) at DØ Beauty 2005 in Assisi, June 2005 Sascha Caron for the DØ collaboration Tag beauty fast …
Status of Eric Kajfasz CPPM/Fermilab GDR-Susy, Lyon - 26 novembre 2001.
L2 Silicon Track Trigger All D0 Meeting 11 January 2002 Ulrich Heintz Boston University.
1 Level1 Central Track Trigger Physics Justification Proposed Implementation Costs and Schedule Meenakshi Narain Boston University / Dzero Collaboration.
Feb 26, 2004 Mike Hildreth – DØ Collaboration Meeting Run IIb Trigger Simulation Report Mike Hildreth & Ela Barberis for the Run IIb Trigger Simulation.
D0 Collaboration Meeting July 2002 L2: The Road Ahead James T. Linnemann MSU D0 Oklahoma Workshop July 9, 2002 Special Thanks to Terry Toole for status.
L2 Trigger Connections V4.2 Page 1 of 3February 1, 1999 Jerry Blazey NIU Si Trker Fi-Glink 1. 3Gb/s, 20-bit L2STT (In Design) L1 CFT Cu-AMCC 1.4Gb/s Fi-Glink.
Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 1 Data Taking Status and Plans Achievements Concerns Plans Arnd Meyer, RWTH Aachen D Ø Collaboration Meeting October.
G. Steinbrück 7-November The DØ Silicon Track Trigger Georg Steinbrück Columbia University, New York On behalf of the DØ collaboration Vertex 2002.
DØ Collaboration Meeting October 10, DØ RunIIb Trigger Upgrade Vivian O’Dell, FNAL for the DØ Trigger Upgrade Group.
C. Foudas, Imperial CMS Upgrades Workshop FNAL – Trigger Introduction Status of the CMS Trigger Upgrade Activities: –uTCA and Optical Link upgrades.
Wesley SmithAug. 17, 2010 Trigger Budget Review: Travel & COLA - 1 US CMS FY 2011 Budget Review Trigger Travel & COLA Wesley Smith Aug. 17, 2010 Outline.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
FTK poster F. Crescioli Alberto Annovi
Workshop on Quarkonium, November 8-10, 2002 at CERN Heriberto Castilla DØ at Run IIa as the new B-Physics/charmonium player Heriberto Castilla Cinvestav-IPN.
BEACH Conference 2006 Leah Welty Indiana University BEACH /7/06.
Global Monitoring Pushpa Bhat Fermilab Shifter Tutorial Feb. 3, 2003.
Search for Randall-Sundrum Gravitons with 1 fb -1 of Data Amitabha Das.
22 June 2000 D  NIU Workshop S. Doulas From Detector to Ntuples: Muons Steven Doulas Northeastern University Boston, MA D0 Muon Upgrade Group.
The DØ Silicon Track Trigger Bill Lee Florida State University 27 October 2003  Introduction + Motivation  Design  Status
What is Particle Physics -- and why I like doing it (Horst Wahl, October 2001) l Particle physics Goals and issues -- Why do it? l How to do a particle.
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
December DZERO Operations Jerry Blazey Northern Illinois University.
G. Steinbrück 11-October The DØ Silicon Track Trigger Georg Steinbrück Columbia University, New York Collaboration Meeting 10/11/2002  Introduction.
1 Triggering on Electromagnetic Objects (e  /  ) at L1 & L2 at L1 & L2 Mrinmoy Bhattacharjee Mrinmoy Bhattacharjee SUNY, Stony Brook SUNY, Stony Brook.
7 Feb 2005T. Yasuda, Fermilab D0 Status Report 2/7/2005 Taka Yasuda Fermilab.
The Online Central Tracker of D0
System-On-a-Programmable-Chip (SOPC) Implementation of the Silicon Track Card (STC) Thesis Defense By Arvindh-kumar Lalam Department of Electrical and.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
FNAL PMG Feb 5, DØ RunIIb Trigger Upgrade WBS 1.2 Paul Padley, Rice University for the DØ Trigger Upgrade Group.
Director’s Review Feb 3-4, Installation and Technical+Physics Commissioning of DØ RunIIb Silicon & Trigger Upgrades Schedule & Costs R.P. Smith.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Silicon Track Trigger Status report 7 Oct (Horst D Wahl) l funding l ongoing activities l what next? l schedule l Webpage of STT group: –
Proposed full upgrade of the L1CTT/DFE for Run2b Meenakshi Narain Boston University Outline: Proposal Reviewers comments and responses Schedule Cost.
Upgraded D  Detector and B Physics D  Detector Upgrade at Run II Overview Focus on Inner Tracker and the Trigger B physics in D , mainly sin(2  ) Preliminary.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
1 DØ RunIIb Trigger Upgrade: Status Darien Wood for the DØ Trigger Upgrade Group.
A proposal for a full upgrade of the L1CTT/DFE for Run2b Meenakshi Narain Boston University Outline: u Why do we need a full upgrade? u The new proposed.
The DØ Silicon Track Trigger Wendy Taylor IEEE NSS 2000 Lyon, France October 17, 2000  Introduction  Overview of STT  STT Hardware Design u Motherboard.
Levan BabukhadiaICHEP02 – 31 st International Conference on High Energy Physics, Amsterdam, 24 – 31 July, 2002 CHEP02 – 31 st International Conference.
1 FTK AUX Design Review Functionality & Specifications M. Shochet November 11, 2014AUX design review.
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
H.Evans Tevatron Connection: 24-Jun-05 1 B-Physics at DØ Recent Results & Plans Hal Evans(for the DØ B group)Columbia U. 1.B-Physics & the DØ Detector.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
L2 Silicon Track Trigger D0 Trigger Workshop 22 April 2002 Ulrich Heintz Boston University.
Upgrade: Calo Trigger Calorimeter detector 20 Link = 4 copper wire Serial LVDS 280Mhz 32
Axel Naumann, DØ University of Nijmegen, The Netherlands 04/20/2002 APS April Meeting 2002 Prospects of the Multivariate B Quark Tagger for the Level 2.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
D0 PMG, 07Jun05 1 D. Wood, Trigger Upgrade Status Trigger Upgrade Status  The DØ Trigger Upgrade consists of u Complete replacement of Level 1 calorimeter.
Director’s Review Dec 1999 DO Timeline Old Version J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup.
Collaboration Mtg April 14, 2000 DO Timeline J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup 1/2.
20 April 2002Bill Lee APS 1 The D0 Silicon Track Trigger Bill Lee Florida State University.
Nikhef Scientific Meeting 2000Onne Peters D0 Muon Spectrometer December 14-15, Amsterdam Onne Peters Nikhef Jamboree 2000.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
NIPHAD meeting, Jan by Sascha Caron How do we trigger beauty ? The Silicon Track Trigger at D0 The Silicon Track Trigger at D0 and ideas for ATLAS.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
DØ Experiment l Physicists Susan Blessing Sharon Hagopian Vasken Hagopian Stephan L. Linn Harrison B. Prosper Horst D. Wahl Bill Lee Silvia Tentindo-Repond.
Update on CSC Endcap Muon Port Card
DC trigger test Present layout Trigger electronics
The Silicon Track Trigger (STT) at DØ
L1FW: towers, tracks, correlations
STT Simulator Status and To Do List
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

1 DØ trigger system 3 levels L1 deadtimeless L1 deadtimeless L2 100  s L2 100  s L3 farm, 50 Hz L3 farm, 50 Hz Brown involvement L2 STT L2 STT L1CTT L1CTT L2FW:Combined objects (e, , j) L1FW: towers, tracks, correlations L1CAL L2STT Global L2 L2CFT L2PS L2Cal L1 CTT L2 Muon L1 Muon L1FPD Detector L1 TriggerL2 Trigger 7 MHz2-5 kHz CAL FPS CPS CFT SMT Muon FPD 1000 Hz L3

2 L2 silicon track trigger Collaborative effort of Boston University Boston University Stony Brook Stony Brook Columbia Columbia Florida State Florida State Electronic cards: 100 motherboards 100 motherboards 250 serial link boards 250 serial link boards 70 silicon trigger cards 70 silicon trigger cards Running since 2002 Brown Responsibilities Maintenance of STC cards Maintenance of STC cards on-call expert support on-call expert support Narain Hazen Wu

3 L1 track trigger essential for all physics: e, ,  (WH  l jj), input for STT track trigger rates highly sensitive to occupancy upgrade stategy: narrow track roads by using hits in individual fibers (singlets) rather than pairing adjacent fibers (doublets) narrow track roads by using hits in individual fibers (singlets) rather than pairing adjacent fibers (doublets) calorimeter-track matching with finer resolution calorimeter-track matching with finer resolution upgrade scope replaced two crates of electronics replaced two crates of electronics Running seamlessly part of the trigger since last summer. Responsibilities: On site expert support On site expert support Firmware generation Firmware generation DFEA2 card maintenance DFEA2 card maintenance Narain Pangilinan