About Us Vision: A national center for new imaging detectors. Mission: To design, develop, and implement new advanced sensor technologies in collaboration.

Slides:



Advertisements
Similar presentations
Willie J. Fitzpatrick, PhD Chief, Aviation Division
Advertisements

Technology Module: Technology Readiness Levels (TRLs) Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture.
Technology readiness levels in a nutshell
What Is A Technical Readiness Level and How Is It Used?
Technology Readiness (TR)
Robbie Hood, Alexander MacDonald, Robert Atlas, Frank Marks, Steve Koch, Jim McFadden, Robert Rogers, Joseph Cione, Michael Black, Eric Uhlhorn, Christopher.
Engineer Research and Development Center Cold Regions Research and Engineering Laboratory “We solve problems to make the world safer and better.” Serving.
Assessment of Undergraduate Programs Neeraj Mittal Department of Computer Science The University of Texas at Dallas.
Measuring Technology Maturity Actual system “flight proven” through successful mission operations Actual system completed and “flight qualified” through.
1 Graduates’ Attributes : EMF, EUR-ACE and Federal Educational Standards Alexander I. Chuchalin, Chair of the RAEE Accreditation Board Graduates’ Attributes.
It’s Alive! Performance and control of prototype Starbug actuators Roger Haynes, Andrew McGrath, Jurek Brzeski, David Correll, Gabriella Frost, Peter Gillingham,
Creating Standards for the Small Satellite Industry Presented by Linda Herrell For Milind Pimprikar*, John Hines** and Andrew Quintero*** *CANEUS **NASA.
Office of Small and Medium Enterprises (OSME) | Bureau des petites et moyennes entreprises (BPME) To Kickstart InnovationEncourager l'innovation Programme.
Toward a Revised Imaging Science Undergraduate Curriculum Motivation, Requirements, Elements, and Scenarios.
1 Distribution A. Approved for public release; distribution is unlimited. Headquarters U.S. Air Force I n t e g r i t y - S e r v i c e - E x c e l l e.
What are MRLs ? Alfred W. Clark Dawnbreaker, Inc.
Ho Cheng Huat, Executive Vice-President, IP Management Division, ETPL Tuesday, 5th May 2015 Session 3: South-South and Triangular Cooperation Partnerships.
Finding a way or making one. Labor’s headquarter is in Rome Labor.
I Forum Technologii Kosmicznych i Satelitarnych „JAK ZWIĘKSZYĆ UDZIAŁ POLSKI WE FLAGOWYCH PROGRAMACH UNII EUROPEJSKIEJ: COPERNICUS, GALILEO, H2020?” „HOW.
SEMICONDUCTEURS « Moteurs de l’Industrie » Conseil d’Orientation du GIP CNFM 30 novembre Gérard MATHERON Président du GIP CNFM SITELESC Chairman.
Technology Input Formats and Background Appendix B.
Liviu LAZAR IS - Staff Officer NIAG Guyonne Le Fournis
Space-Based Network Centric Operations Research. Secure Autonomous Integrated Controller for Distributed Sensor Webs Objective Develop architectures and.
* Backup materials can be found at
Andrew Faulkner1 Technology Readiness Levels 4 th SKADS Workshop, Lisbon Technology Readiness Levels TRLs Andrew Faulkner.
1 1 “Secure the High Ground” Jeff Craver Project Manager Space and Missile Defense Technical Center Jeff Craver Project Manager.
Ocean Observatories Initiative OOI Cyberinfrastructure Architecture Overview Michael Meisinger September 29, 2009.
The Center for Space Research Programs CSRP Technology Readiness Level.
WHO Global Standards. 5 Key Areas for Global Standards Program graduates Program graduates Program development and revision Program development and revision.
Page 1 of 11 Progress developing an evaluation methodology for fusion R&D ARIES Project Meeting March 4, 2008 M. S. Tillack.
1 MRL Assist Tool Website Access the MRL Assist Tool at
EUCISE 2020 EUCISE 2020 has received funding from the European Union’s seventh framework programme under grant agreement no: Participating Countries:
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
Materials Integration of III-V Compounds for Electronic Device Applications The funding for this project has provided us with the means to understand the.
ST5 PDR June 19-20, 2001 NMP 2-1 EW M ILLENNIUM P ROGRA NNMM Program Overview Dr. Christopher Stevens Jet Propulsion Laboratory, California Institute of.
Cross fertilisation Technology readiness level From Space and Aeronautic to ITS ? 11/06/2014Topos proposal done by JPhM1.
1 1 Title of Proposal Programme/Topic Number: SSH Type of Proposal; Collaborative Project (Small) Proposal Number: Programme/Topic Number: SSH
Neutron Chopper Technologies Work Package
1 HIGHER EDUCATION PROGRAMS AT NASA K. E. BLANDING, PH.D. Acting Director, Higher Education Division NASA Office of Education.
045-05/rs PERSISTENT SURVEILLANCE FOR PIPELINE PROTECTION AND THREAT INTERDICTION Technical Readiness Level For Control of Plasma Power Flux Distribution.
MB6025-MB7226 TECHNOLOGY COMMERCIALIZATION
Assessment of Fusion Development Path: Initial Results of the ARIES “Pathways” Program Farrokh Najmabadi UC San Diego ANS 18 th Topical Meeting on the.
SAS_08_Legacy_Safety_Hill Assurance and Recertification of Safety Critical Software In Legacy Systems Janie Hill NASA Kennedy Space Center, Florida
Click to edit Master title style Click to edit Master subtitle style A Small Business Paradigm For Sustainable Technology Insertion Pacific Defense Solutions,
Horizon 2020 – 2016 Transport Call
Cross-Domain Semantic Interoperability ~ Via Common Upper Ontologies ~ Presentation to: Expedition Workshop #53 15 Aug 2006 James Schoening
Energy.gov/sunshot Solar Manufacturing Technology 2 (SolarMat 2) informational webinar Introduction & Concept papers Feb. 18, 2014.
OUTCOMES OBJECTIVES FUNCTIONS ACTIONS TERRITORIES LOCATIONS MARKET SEGMENTS TIME LINESCHALLENGE IMPACT RESOURCESACTIVITIESCHANNELS RELATIONS PARTNERS CUSTOMERS.
NMBP : Cross-cutting KETs for diagnostics at the point-of-care co-funded by LEIT-NMBP (DG RTD) and LEIT-ICT (DG CONNECT) Opening 20 Sep 2016 Closing.
Engineering and Science Directorate Organization Structure June 2016.
Dr. Thomas D. Fiorino November 2002
Bringing Digital Technology Back to Earth ISCe2005 Presented by Ken Dozier USC Viterbi School of Engineering NASA Far West Technology Transfer Center.
Penn State Center for e-Design Site Vision and Capabilities
Technology Readiness Assessment (TRA)
OUTCOME BASED EDUCATION
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Shift2Rail Info Day Call for Proposals 2017
Milestone A to Milestone B Requirements Management Activities
Concept Idea Title Summary of the effort to include:
h t t p : / / w w w . u s c . e d u / g o / t t c
Science and Technology
Isle TECHNOLOGY APPROVAL GROUP(TAG)
Systems Engineering Management
About Us Vision: A national center for new imaging detectors.
Entrepreneurship & Regional Connections
US/Japan Workshop on Fusion Power Plant Studies
VISION AND CHANGE IN UNDERGRADUATE BIOLOGY EDUCATION: A Call to Action
TRL tables: power conversion and lifetime
What Is A Technical Readiness Level and How Is It Used?
G. Technology Readiness Levels (TRL*)
Presentation transcript:

About Us Vision: A national center for new imaging detectors. Mission: To design, develop, and implement new advanced sensor technologies in collaboration with academic researchers, industry engineers, government scientists, and university/college students. Personnel

Detector Development Procure wafer Frontside processing Bonding Thinning Backside implantation Laser annealing Wafer probing DicePackaging Probe test Packaging RIDL UR Wafer supl RIT μE Foundry MOSIS JPL Infotonics AR coating TRL 1Basic principles observed and reported TRL 2Technology concept and/or application formulated TRL 3Analytical and experimental critical function and/or characteristic proof-of-concept TRL 4Component and/or breadboard validation in laboratory environment TRL 5Component and/or breadboard validation in relevant environment TRL 6System/subsystem model or prototype demonstration in a relevant environment (ground or space) TRL 7System prototype demonstration in a space environment TRL 8Actual system completed and “flight qualified” through test and demonstration (ground or space) TRL 9Actual system “flight proven” through successful mission operations

Projects

Education and Training

Future Goals Further differentiate into other detector sectors. Grow collaborative base oNational: NIH, DoE, etc.. oIndustry: Pictometry etc.. Increase level of integration oProvide turn-key systems ready for applications Tech Development oMigrate upstream to TRL levels 7+ Create comprehensive training program Immerse students, researchers, and professionals in the discipline Educational outreach oIntegrate cross-disciplinary detector technology into undergraduate and graduate student sciences oFacilitate and extend external connections with K-12 programs