Pemilihan Tipe Komponen D0394 Perancangan Sistem Manufaktur Kuliah Ke XIX - XX.

Slides:



Advertisements
Similar presentations
BU Decision Models Integer_LP1 Integer Optimization Summer 2013.
Advertisements

Introduction to Mathematical Programming
Yazid Mati & Xiaolan Xie CRF Club, 04/07/2004 Scheduling Automated Manufacturing Systems with Transportation and Storage Constraints Yazid MATI Ecole des.
Part IV MANUFACTURING SYSTEMS
WEEK 04C – PROCESSES AND TECHNOLOGY (CH 6) Process types and selection, automation, line balancing SJSU Bus David Bentley1.
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 13 MATERIAL HANDLING SYSTEMS E. Gutierrez-Miravete Spring 2001.
Flexible Manufacturing Systems (FMS)
Ch 1 Introduction Sections: Production Systems
A Review of Different Approaches to the FMS Loading Problem A Review of Different Approaches to the FMS Loading Problem A. Grieco, Q. Semeraro, T. Tolio.
INDUSTRIAL & SYSTEMS ENGINEERING
PRODUCTION PLANNING ELİF ERSOY Production Planning2 WHAT IS PRODUCTION PLANNING?  Production planning is a process used by manufacturing.
© 2007 Pearson Education Computer-Integrated Manufacturing Supplement F.
David O’Sullivan Industrial Automation (IE423 Computer Integrated Manufacturing) (IE215 Design and Make) David O’Sullivan
Engr. Muhammad Bilal Shahid.  Electrical heating principles and applications, induction heating, high frequency heating and dielectric heating.  Speed.
Automated Manufacturing
Manufacturing Engineering Department Lecture 1 - Introduction
Components of an Automated Manufacturing System
Hasan Oben Pullu Dokuz Eylul University Industrial Engineering Department COMPUTER INTEGRATED MANUFACTURING (CIM)
FLEXIBLE MANUFACTURING SYSTEM
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 7 FLEXIBLE MANUFACTURING SYSTEMS E. Gutierrez-Miravete Spring 2001.
FLEXIBLE MANUFACTURING SYSTEMS. FLEXIBLE MANUFACTURING SYSTEMS MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS.
MFGE 404 Computer Integrated Manufacturing CIM A T I L I M U N I V E R S I T Y Manufacturing Engineering Department Lecture 7– Flexible Manufacturing Systems.
Flexible Manufacturing Systems
Flexible Manufacturing Systems (FMS)
Flexible Manufacturing Systems Introduction to FMS/FAS.
Dr. Osama Al-Habahbah Automation Chapter 1 Introduction.
Computer Integrated Manufacturing (CIM). What is CIM? It is the manufacturing process done with the use of a computer for controlling the complete production.
IM MATERIAL HANDLING. Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right.
Introduction to Job Shop Scheduling Problem Qianjun Xu Oct. 30, 2001.
COPYRIGHT © 2008 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein under license.
Integer Programming Key characteristic of an Integer Program (IP) or Mixed Integer Linear Program (MILP): One or more of the decision variable must be.
Notes 5IE 3121 Knapsack Model Intuitive idea: what is the most valuable collection of items that can be fit into a backpack?
Assembly Lines – Reliable Serial Systems
Chapter 1. Formulations 1. Integer Programming  Mixed Integer Optimization Problem (or (Linear) Mixed Integer Program, MIP) min c’x + d’y Ax +
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
CIM Systems Computer Integrated Manufacturing
Operational Research & ManagementOperations Scheduling Economic Lot Scheduling 1.Summary Machine Scheduling 2.ELSP (one item, multiple items) 3.Arbitrary.
UNIT-IV Shop Floor Control and Flexible Manufacturing Systems
© The McGraw-Hill Companies, Inc., Supplement C Operations Technology.
Rough-Cut Capacity Planning in SCM EIN 5346 Logistics Engineering Fall, 2015.
Milestone Developments in Operations Management Industrial Revolution, Growth of Railroads, Scientific Management Movement
Rough-Cut Capacity Planning in SCM Theories & Concepts
ICT in Product Manufacture ICT based Production Scheduling and Logistics.
Industrial Automation and Robotics Mr. Muhajir Ab. Rahim School of Mechatronic Engineering UniMAP.
ISLANDS OF AUTOMATION.
Machines Used in Computer Integrated Manufacturing Applications
Inputs and Outputs to Aggregate Production Planning
Rough-Cut Capacity Planning in SCM Theories & Concepts
Perancangan Sistem Manufaktur
The University of Jordan Mechatronics Engineering Department
Flexible Manufacturing Systems
Course Summary Organization: A process providing goods and services based on a set of inputs, including raw material, capital, labor and knowledge. The.
Rough-Cut Capacity Planning in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Manufacturing system design (MSD)
Automation (21-541) Sharif University of Technology Session # 3
Computer Integrated Manufacturing ( CIM). Chapter One 1.1 Introduction 1.2 Types of Manufacturing 1.3 CIM Hardware and CIM Software 1.4 Nature and Role.
FACILITY LAYOUT Facility layout means:
Integer Programming (정수계획법)
World-Views of Simulation
Flexible Manufacturing Systems
Facilities Planning and Design Course code:
MANUFACTURING SYSTEMS
Chapter 1. Formulations (BW)
Planning and Scheduling in Manufacturing and Services
LINGO LAB 3/4.
Integer Programming (정수계획법)
Flexible Assembly Systems
Chapter 1. Formulations.
Ch 1 Introduction Sections: Production Systems
Presentation transcript:

Pemilihan Tipe Komponen D0394 Perancangan Sistem Manufaktur Kuliah Ke XIX - XX

Flexible Manufacturing Systems (FMS) An FMS is a “reprogrammable” manufacturing system capable of producing a variety of products automatically. Conventional manufacturing systems have been marked by one of two distinct features: –The capability of producing a variety of different product types, but at a high cost (e.g., job shops). –The capability of producing large volumes of a product at a lower cost, but very inflexible in terms of the product types which can be produced (e.g., transfer lines). An FMS is designed to provide both of these features.

FMS Component Numerical Control (NC) machine tools Automated material handling system (AMHS) –Automated guided vehicles (AGV) –Conveyors –Automated storage and retrieval systems (AS/RS) Industrial Robots Control Software

GE-A4 Robot (MH3) Kardex (ASI) Port (P3) Sabre 500 (MP3) Leadwell (MP2) Puma Robot (MH2) Port (P2) Port (P1) Manual Wksstn 1 (OP1) Manual Wksstn 2 (OP1) Adept (MH1) Pratt & Whitney (MP1) Texas A&M Computer Aided Manufacturing Lab

Classification of FMS-related Problems Strategic analysis and economic justification, which provides long-range, strategic business plans. Facility design, in which strategic business plans are coalesced into a specific facility design to accomplish long-term managerial objectives. Intermediate-range planning, which encompasses decisions related to master production scheduling and deals with a planning horizon from several days to several months in duration. Dynamic operations planning, which is concerned with the dynamic, minute-to-minute operations of FMS.

FMS Problems Part type selection (Askin) - selecting parts that will be produced in the FMS over some relatively long planning horizon. Part selection (Stecke) - from the set of parts that have current production requirements and have been selected for processing in the FMS, select a subset for immediate and simultaneous processing. Machine grouping (Stecke) – partition machines into groups where each machine in a group can perform the same set of operations. Loading (Stecke) - allocate the operations and required tools of the selected part types among the machine groups. Control - provide instructions for, and monitor the equipment in the FMS so that the production goals identified by the above problems are met.

FMS Part Type Selection Problem The part type selection problem is involves determining which parts should be produced in an FMS. –In theory, there should by some savings achieved by producing some parts in the FMS rather than producing them on manual equipment or purchasing them from outside. –The objective is to load the FMS to maximize the savings achieved by producing parts in the FMS subject to FMS capacity constraints. Typically, the part type selection problem is solved infrequently For example, the decision to outsource a part rather than producing it in-house requires time for the subcontractors to do the required design and tooling.

Part Type Selection Formulation Parameters/Variables: P is the production time per period available on the key,bottleneck resource. p i is the time per period (time per unit  units per period) required by part type i on the key bottleneck resource. s i is the savings per period (savings per unit  units per period) if part type i is added to the FMS. x i is the binary decision variable indicating whether or not product i is produced in the FMS.

Part Type Selection Formulation Knapsack problem –IP with a single ‘capacity’ constraint –LP relaxation can be solved by inspection. –Solution method : Heuristic Dynamic Programming Branch and Bound Formulation

Greedy Heuristic for Part Type Selection 1.Order the part types [1] to [N] such that: 2.For i = 1 to N, select part type [i] if s i > 0 and inclusion is feasible. 3.Example: Given the following parts, and assuming that there are 250 hours available on the FMS, use the above heuristic to perform the part type selection:

Example ( cont’d ) Parts Unit Savings Unit Proc. Time Demand sisi pipi s i /p i Assignment: Part Hrs. Cumlative Sequence:

Optimal Solutions Dynamic programming –Principle of Optimality - For any initial stage, state, and decision, subsequent decisions must be optimal for the remainder of the problem that results from the initial decision. In other words, given a stage and state, the optimal decision from that point on is independent of how you got to that state. –The decision of whether or not to include each part type in the FMS is a stage. The state is the remaining processing time on the FMS.

Dynamic Programming Let fi(  ) be the cost savings for the optimal decision regarding part types 1 to i if they occupy  time units per period on the FMS. If s  0 For 2  i  N

Comment on the Part Type Selection Problem Assumes that either all or none of a product is produced in the FMS. Assumes that there is a single key, bottleneck resource and that the other resources have sufficient capacity to handle any configuration of parts Assumes that the p i ’s are independent of the parts selected. The s i ’s can be very difficult to assess