The ATLAS/TILECAL Detector Control System Helena Santos (LIP − Lisbon) on behalf of the Tile Calorimeter Group EBC LBC LBA EBC TILECAL is the hadronic.

Slides:



Advertisements
Similar presentations
J. Varela, CERN & LIP-Lisbon Tracker Meeting, 3rd May Partitions in Trigger Control J. Varela CERN & LIP-Lisbon Trigger Technical Coordinator.
Advertisements

ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Scintillation counter installation on EBC cryostat scintillators gap scintillators location of MBTS scintillators MBTS counters will be plugged into fiber.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
An Online Calorimeter Trigger for Removing Outsiders from Particle Beam CalibrationTests Denis O. Damazio José Manoel de Seixas Signal Processing Lab –
The Detector Control System for the ATLAS SemiConductor Tracker
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
TRT Detector Status Report Konstantin Zhukov (Lebedev Physics Institute) for the ATLAS TRT group ID week, 19 May
Electromagnetic Compatibility of a Low Voltage Power Supply for the ATLAS Tile Calorimeter Front-End Electronics G. BLANCHOT CERN, CH-1211 Geneva.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
Robert Gomez-Reino on behalf of PH-CMD CERN group.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
MDT PS DCS for ATLAS Eleni Mountricha
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
The ATLAS Tile Calorimeter: Commissioning and Preparation for Collisions Presented by Oleg Solovyanov On behalf of the Tile Calorimeter Collaboration of.
1 Control Room Model 4 Types of control rooms  Field Control Room (FCR): for example operating near the equipment in USA15. Expected to be needed throughout.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
22 October 20151/23Fabio Vinagre -- TileCal DCS TileCal DCS Expert tutorial - DCS 22 October 2015.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
J. Varela, LIP-Lisbon/CERN LEADE WG Meeting CERN, 29 March 2004 Requirements of CMS on the BST J. Varela LIP Lisbon / CERN LHC Experiment Accelerator Data.
The Detector Control Power System of the Monitored Drift Tubes of the ATLAS Experiment Theodoros Alexopoulos NTU Athens TWEPP08 September 17, 2008 Naxos,
Electronic Systems Support Demonstrator Racks Rack coordination meeting 12 October 2004.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
Installation and Commissioning of the ATLAS LAr Readout Electronics
André Augustinus 16 September 2002 PVSS & Framework How to get started.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
Algorithms for the ROD DSP of the ATLAS Hadronic Tile Calorimeter
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
8/18/2004E. Monnier - CPPM - ICHEP04 - Beijing1 Atlas liquid argon calorimeter status E. Monnier on behalf of the Atlas liquid argon calorimeter group.
Adders in drawer Test of TileCal Level 1 Interface drawer patch panel trigger cable ca 70 m receiver pre-processor TileCal patch panel RP patch panel TileCal.
+ Discussion on outliers Information from Antonella Succurro – list of outliers Oleg – list of pathologies seen in monoCis phase scans.
ATLAS Tile Hadronic Calorimeter:
FPGAs in ATLAS Front-End Electronics Henrik Åkerstedt, Steffen Muschter and Christian Bohm Stockholm University.
The ATLAS Tiles Hadronic Calorimeter
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Nov. 2005Calorimeter Commissioning R. Teuscher 1 Calorimeter Commissioning in : Testbeam 2: Installation, Cosmic Ray Commissioning.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
JBMCambridge Workshop 6th to 7th January DAQ-DCS Communication.
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
SU participation in nn bar Sam Silverstein. Who are we? Particle physics group  ATLAS  IceCube Instrumentation physics division  ATLAS L1Calo trigger.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
Muon Detectors Tile Calorimeter Liquid Argon Calorimeter Solenoid Magnet Toroid Magnets 46m 22m SemiConductor Tracker(SCT) Pixel Detector Transition Radiation.
CLAS12 ECAL PCAL DC FTOF... Region 2 DewPnt Region 3 Region 4 Region 1 Mod 1... Mod 2 HV TEMP LV Hierarchy of Slow Controls: Driven by Finite State Machine.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Status of integration in USA15. Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y A2 equipped with turbine cooling system and nominal.
Matteo Volpi, Luca Fiorini Timing study with Muons at 90º from first beam PRELIMINARY STUDY (Barcelona) 1 Tile Timing Group meeting 17 September 2008.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
The Control and Hardware Monitoring System of the CMS Level-1 Trigger Ildefons Magrans, Computing and Software for Experiments I IEEE Nuclear Science Symposium,
ATLAS Plenary, Feb. 18th, 05Commissioning1 Report on the commissioning activities G. Mornacchi, P. Perrodo and Sub-Systems Collaborators.
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
Status of the Remote HV Tile Upgrade session during the AUW Wednesday, 20 April 2016 François Vazeille on behalf of the Clermont-Ferrand team  Same set-up.
Schedule ● External Links ● Calorimeter Signals ● Internal Tests ● System Tests ● Combined Runs ● Schedule Murrough Landon 19 April 2007 A brief update.
TileCal EM scale status Irene Vichou University of Illinois at Urbana on behalf of TileCal Collaboration MPI Hadronic Calibration Workshop May 3 rd, 2006.
Tile Calorimeter Commissioning Claudio Santoni Université Blaise Pascal and IN2P3 On behalf of the TileCal Collaboration Physique ATLAS France Workshop.
ATLAS Tile Calorimeter Data Quality Assessment and Performance
DAQ for ATLAS SCT macro-assembly
Electrical and electronic systems projects
Front-End Electronics of ATLAS Tile Calorimeter and its Commissioning
TileCal ROD Commissioning Counting Room Installation
ATLAS Tile Calorimeter Interface The 8th Workshop on Electronics for LHC Experiments, Colmar, 9-13 September 2002 K. Anderson, A. Gupta, J. Pilcher, H.Sanders,
TPC Detector Control System
Status at CERN and commissioning
Design Principles of the CMS Level-1 Trigger Control and Hardware Monitoring System Ildefons Magrans de Abril Institute for High Energy Physics, Vienna.
Presentation transcript:

The ATLAS/TILECAL Detector Control System Helena Santos (LIP − Lisbon) on behalf of the Tile Calorimeter Group EBC LBC LBA EBC TILECAL is the hadronic calorimeter of ATLAS. The detector is located 100 m underground and can not be accessed during LHC running due to ionizing radiation. Thus, it must allow full remote diagnosis and operation. This is assured by the DCS – the system responsible for coherent and safe operation of the detector. pictorial view of the ATLAS calorimeters Tile barrel Tile extended barrel

TILE EBA LBA LBC EBC Infrastructure CAN PSU COOLING RACKS LASER Partition COOLING VME Crates DDC 200V PS AUX Boards Branch 1 Branch 2 Branch 3 Branch 4 Module 9 Module 10 …. Module 23 Module 24 LVPS 9 Drawer 9 ROD crate TTC crate SYSTEMS Finite State Machine (FSM)‏ FSM is extensively used in ATLAS DCS. It allows, among other, to enable/disable malfunctioning hardware, automatic detector operations, single subsystem operations and control integration in the ATLAS DCS.

Click to see fLVPS Click to see Drawer FSM NAVIGATION