Contemporary Engineering Economics, 4 th edition, © 2007 Methods of Describing Project Risk Lecture No. 46 Chapter 12 Contemporary Engineering Economics.

Slides:



Advertisements
Similar presentations
Contemporary Engineering Economics, 4 th edition, © 2007 When Projects Require Working-Capital Investments Lecture No. 40 Chapter 10 Contemporary Engineering.
Advertisements

1 Project Cash Flow Analysis Lecture No. 27 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Contemporary Engineering Economics, 4 th edition, © 2007 Effects of Inflation on Project Cash Flows Lecture No. 45 Chapter 11 Contemporary Engineering.
Project Analysis and Evaluation
Contemporary Engineering Economics, 4 th edition, © 2007 Variations of Present Worth Analysis Lecture No.17 Chapter 5 Contemporary Engineering Economics.
(c) 2001 Contemporary Engineering Economics 1 Chapter 14 Project Risk and Uncertainty Origin of Project Risk Methods of Describing Project Risk Probability.
(c) 2001 Contemporary Engineering Economics 1 Chapter 14 Project Risk and Uncertainty Origin of Project Risk Methods of Describing Project Risk.
Contemporary Engineering Economics, 4 th edition, © 2007 Generalized Cash Flow Approach – Lease versus Buy Lecture No. 42 Chapter 10 Contemporary Engineering.
Dealing With Uncertainty
Contemporary Engineering Economics, 4 th edition, © 2007 When Projects Require Financing Activities Lecture No. 41 Chapter 10 Contemporary Engineering.
Chapter McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. 11 Project Analysis and Evaluation.
Sensitivity and Breakeven Analysis
Contemporary Engineering Economics, 4 th edition, © 2007 Risk Simulation Lecture No. 49 Chapter 12 Contemporary Engineering Economics Copyright, © 2006.
Contemporary Engineering Economics, 4 th edition, © 2007 Corporate Income Taxes Lecture No. 35 Chapter 9 Contemporary Engineering Economics Copyright ©
Contemporary Engineering Economics, 4 th edition, © 2007 Process of Developing Project Cash Flows Lecture No.38 Chapter 10 Contemporary Engineering Economics.
Contemporary Engineering Economics, 4 th edition, © 2007 Estimating Profit from Production Lecture No. 31 Chapter 8 Contemporary Engineering Economics.
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
Contemporary Engineering Economics, 4 th edition, © 2007 Cost-Volume-Profit Analysis Lecture No. 30 Chapter 8 Contemporary Engineering Economics Copyright.
Lecture No.33 Chapter 10 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Lecture No. 38 Chapter 12 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Chapter 8 Annual Equivalent Worth Analysis
Chapter 10 Sensitivity and Breakeven Analysis. Handling Project Uncertainty Origin of Project Risk Methods of Describing Project Risk.
Copyright © 2003 Pearson Education Canada Inc. Slide 3-28 Chapter 3 Cost-Volume-Profit Analysis.
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. 11 Project Analysis and Evaluation.
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
1 Understanding Project Cost Elements Lecture No. 22 Chapter 9 Fundamentals of Engineering Economics Copyright © 2008.
Chapter 11 Project Analysis and Evaluation Homework: 19, 25 & 26.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 0 Chapter 9 Making Capital Investment Decisions.
Break Even Analysis [Chapter 9]. Objectives Upon completion of this chapter students will be able to: Identify different type of costs. Define type of.
Lecture No. 37 Chapter 11 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Effects of Inflation on Project Cash.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Process of Developing Project Cash.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Risk Simulation Lecture No. 40 Chapter.
Chapter 11 Project Analysis and Evaluation McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Variations in Present Worth Analysis.
Sensitivity and Breakeven Analysis Lecture No. 25 Chapter 10 Fundamentals of Engineering Economics Copyright © 2008.
11 0 Project Analysis and Evaluation. 1 Key Concepts and Skills  Understand forecasting risk and sources of value  Understand and be able to do scenario.
Chapter 9 Analyzing Start-up Financial Risks and Benefits.
L29: Sensitivity and Breakeven Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
Copyright  2004 McGraw-Hill Australia Pty Ltd PPTs t/a Fundamentals of Corporate Finance 3e Ross, Thompson, Christensen, Westerfield and Jordan Slides.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Generalized Cash Flow Approach –
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Cost-Volume-Profit Analysis Lecture.
9-1 Copyright  2007 McGraw-Hill Australia Pty Ltd PPTs t/a Fundamentals of Corporate Finance 4e, by Ross, Thompson, Christensen, Westerfield & Jordan.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Discounted Cash Flow Analysis Lecture.
1 Developing Project Cash Flow Statement Lecture No. 23 Chapter 9 Fundamentals of Engineering Economics Copyright © 2008.
. © 2003 The McGraw-Hill Companies, Inc. All rights reserved. Project Analysis and Evaluation Chapter Ten.
Chapter 16 The Financial Plan. Copyright © Houghton Mifflin Company16-2 Overview Estimating sales and capital expenditures Preparing the pro forma income.
10 Project analysis McGraw-Hill/Irwin
Contemporary Engineering Economics, 4 th edition, © 2007 When Projects Require Only Operating and Investing Activities Lecture No. 39 Chapter 10 Contemporary.
Corporate Income Taxes
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Engineering Economic Decisions Lecture.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Probabilistic Cash Flow Analysis.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Estimating Profit from Production.
Copyright © 2008 Pearson Education Canada 6-1 Chapter 6 Contemporary Business Mathematics With Canadian Applications Eighth Edition S. A. Hummelbrunner/K.
Chapter 9 Project cash flow analysis 1.Understanding project cost elements 2.Why use cash flow in economic analysis 3.Income-tax rate to use in economic.
© John Wiley & Sons, 2011 Chapter 12: Strategic Investment Decisions Eldenburg & Wolcott’s Cost Management, 2eSlide # 1 Cost Management Measuring, Monitoring,
Dealing with Uncertainty Assessing a Project’s Worth under Uncertainty or Risk.
The Total Costs Curve TOTAL COSTS FIXED COSTS Revenue $$$ SALES VOLUME BREAKEVEN VOLUME VARIABLE COSTS.
Effects of Inflation on Project Cash Flows
Methods of Describing Project Risk
Inflation and Its Effects on Project Cash Flows
Probabilistic Cash Flow Analysis
Key Concepts and Skills
Discounted Cash Flow Analysis
Meaning and Measure of Inflation
Project Cash Flow Analysis
FIN3013 Lab #7.
HANDLING PROJECT UNCERTAINTY CHAPTER 11
Capital Budgeting Techniques
Process of Developing Project Cash Flows
Presentation transcript:

Contemporary Engineering Economics, 4 th edition, © 2007 Methods of Describing Project Risk Lecture No. 46 Chapter 12 Contemporary Engineering Economics Copyright © 2006

Contemporary Engineering Economics, 4 th edition, © 2007 Chapter Opening Story – Oil Forecasts Are a Roll of the Dice Suppose that your proposed project depends on the price of oil (common to airline industry, UPS, FedEx, and any petroleum- based manufacturing industry). How would you factor the fluctuation and uncertainty into the analysis?

Contemporary Engineering Economics, 4 th edition, © 2007 Origins of Project Risk Risk: the potential for loss Project Risk: variability in a project’s NPW Risk Analysis: The assignment of probabilities to the various outcomes of an investment project

Contemporary Engineering Economics, 4 th edition, © 2007 Methods of Describing Project Risk Sensitivity Analysis: a procedure of identifying the project variables which, when varied, have the greatest effect on project acceptability. Break-Even Analysis: a procedure of identifying the value of a particular project variable that causes the project to exactly break even. Scenario Analysis: a procedure of comparing a “base case” to one or more additional scenarios, such as best and worst cases, to identify the extreme and most likely project outcomes.

Contemporary Engineering Economics, 4 th edition, © 2007 Sensitivity Analysis – Example 12.1 Transmission- Housing Project by Boston Metal Company Financial Facts:  Known with Great Confidence Required investment = $125,000 Project Life = 5 years Income tax rate = 40% MARR = 15%  Unknown but Predictable (Most Likely Values) Unit variable cost = $15 per unit Number of units = 2,000 units Unit Price = $50 per unit Salvage value = $40,000 Fixed cost = $10,000/Yr Required: Determine the acceptability of the investment

Contemporary Engineering Economics, 4 th edition, © 2007 Develop a Project Cash Flow Statement Using Most- Likely Estimates – “Base Case” Revenues: Unit Price50 Demand (units)2,000 Sales revenue$100,000 Expenses: Unit variable cost$15 Variable cost30,000 Fixed cost10,000 Depreciation17,86330,61321,86315,6135,575 Taxable Income$42,137$29,387$38,137$44,387$54,425 Income taxes (40%)16,85511,75515,25517,75521,770 Net Income$25,282$17,632$22,882$26,632$32,655

Contemporary Engineering Economics, 4 th edition, © 2007 Cash Flow Statement Operating activities Net income 25,28217,63222,88226,63232,655 Depreciation 17,86330,61321,86315,6135,575 Investment activities Investment (125,000) Salvage 40,000 Gains tax (2,611) Net cash flow ($125,500)$43,145$48,245$44,745$42,245$75,619

Contemporary Engineering Economics, 4 th edition, © 2007 Developing an Excel Worksheet to Conduct Sensitivity Analysis % deviation from the base

Contemporary Engineering Economics, 4 th edition, © 2007 Sensitivity Analysis for Five Key Input Variables Deviation-20%-15%-10%-5%0%5%10%15%20% Unit price$57$9,999$20,055$30,111$40,169$50,225$60,281$70,337$80,393 Demand12,01019,04926,08833,13040,16947,20854,24761,28668,325 Variable cost52,23649,21946,20243,18640,16937,15234,13531,11828,101 Fixed cost44,19143,18542,17941,17540,16939,16338,15737,15136,145 Salvage value37,78238,37838,97439,57340,16940,76541,36141,95742,553 Base

Contemporary Engineering Economics, 4 th edition, © % -15%-10%-5% 0%5%10%15%20% $100,000 90,000 80,000 70,000 60,000 50,000 40,000 30,000 20,000 10, ,000 Base Unit Price Demand Salvage value Fixed cost Variable cost Sensitivity Graph (Spider Graph)

Contemporary Engineering Economics, 4 th edition, © 2007 Break-Even Analysis Breakeven analysis is a tool used to determine when a business will be able to cover all its expenses and begin to make a profit from a project.  Excel using a Goal Seek function  Analytical Approach

Contemporary Engineering Economics, 4 th edition, © 2007 Using a Goal Seek Function in Excel NPW Breakeven Value Demand

Contemporary Engineering Economics, 4 th edition, © 2007 Break-Even Analysis (Example 12.2) Goal Seek Function Parameters 12.2

Contemporary Engineering Economics, 4 th edition, © 2007 Analytical Approach Unknown Sales Units (X) Cash Inflows: Net salvage37,389 X(1-0.4)($50)30X 0.4 (dep)7,14512,2458,7456,2452,230 Cash outflows: Investment-125,000 -X(1-0.4)($15)-9X -(0.6)($10,000)-6,000 Net Cash Flow-125,00021X + 1,145 21X + 6,245 21X + 2,745 21X X + 33,617

Contemporary Engineering Economics, 4 th edition, © 2007 PW of cash inflows PW(15%) Inflow = (PW of after-tax net revenue) + (PW of net salvage value) + (PW of tax savings from depreciation = 30X(P/A, 15%, 5) + $37,389(P/F, 15%, 5) + $7,145(P/F, 15%,1) + $12,245(P/F, 15%, 2) + $8,745(P/F, 15%, 3) + $6,245(P/F, 15%, 4) + $2,230(P/F, 15%,5) = 30X(P/A, 15%, 5) + $44,490 = X + $44,490 o PW of cash outflows: PW(15%) Outflow = (PW of capital expenditure_ + (PW) of after-tax expenses = $125,000 + (9X+$6,000)(P/A, 15%, 5) = X + $145,113 PW of Cash Flows

Contemporary Engineering Economics, 4 th edition, © 2007 The NPW: PW (15%) = X + $44,490 - ( X + $145,113) = X - $100,623. Breakeven volume: PW (15%)= X - $100,623 = 0 X b =1,430 units. NPW and Breakeven Volume

Contemporary Engineering Economics, 4 th edition, © 2007 NPW as a Function of Demand (X) Demand PW of inflow PW of OutflowNPW X X - $44, X + $145, X -$100,623 0$44,490$145, , ,773160,198-65, ,055175,282-30, ,197188, ,298188, ,338190,3674, ,620205,45240, ,903220,53775,366

Contemporary Engineering Economics, 4 th edition, © 2007 Outflow $350, , , , , ,000 50, , ,000 Profit Loss Break-even Volume X b = 1430 Annual Sales Units (X) PW (15%) Inflow Break-Even Chart – Break-Even Sales Volume at 1,430 Units

Contemporary Engineering Economics, 4 th edition, © 2007 Scenario Analysis Scenario analysis is a process of analyzing possible future events by considering alternative possible outcomes (scenarios). The analysis is designed to allow improved decision-making by allowing more complete consideration of outcomes and their implications. Source: Wikipedia

Contemporary Engineering Economics, 4 th edition, © 2007 Example 12.3 Scenario Analysis Variable Considered Worst- Case Scenario Most-Likely- Case Scenario Best-Case Scenario Unit demand1,6002,0002,400 Unit price ($) Variable cost ($) Fixed Cost ($)11,00010,0008,000 Salvage value ($)30,00040,00050,000 PW (15%)-$5,856$40,169$104,295