© Steven Alter, 2010, all rights reserved Validating Work System Principles for Use in Systems Analysis and Design Steven Alter Ryan Wright

Slides:



Advertisements
Similar presentations
Implementing Quality Concepts
Advertisements

Capacity Planning For Products and Services
HR SCORECARD Presented By ADEEL TARIQ MOBASHIR ALI.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
INVENTORY MANAGEMENT Chapter Twenty McGraw-Hill/Irwin
INDUSTRIAL & SYSTEMS ENGINEERING
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
© Steven Alter, 2010, all rights reserved 02/17/10 Overview of work system analysis paper –Template for paper –Topics –Choose teams.
Introduction to software project management. What is a project? One definition ‘a specific design or plan’ ‘a specific design or plan’ Key elements non-routine.
For Products and Services
Copyright 2012 Delmar, a part of Cengage Learning. All Rights Reserved. Chapter 13 Health Information Systems and Strategy.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
© 2007 Pearson Education O perations as a C ompetitive W eapon Chapter 1 YearExpected Demand Cash Flow 080,000($150,000) 190,000$90, ,000$150,000.
Page 1 Understanding and Defining Issues  Any problem or potential problem facing an organization  Any controversial matter or disputed question affecting.
Operations Management
Developing the Marketing Plan
Chapter 2 The Managerial Role. Copyright © 2006 by Thomson Delmar Learning. ALL RIGHTS RESERVED. 2 Purpose and Overview Purpose –To understand roles of.
Community Planning Training 1-1. Community Plan Implementation Training 1- Community Planning Training 1-3.
© 2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Welcome ISO9001:2000 Foundation Workshop.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
1 NALCAB Conference 2301 Mission St, Co – Ownership Model Presented by: Luis Granados, Mission Economic Development Agency September 4, 2007.
Performance Technology Dr. James J. Kirk Professor of HRD.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Impactful Portfolio Management
Chapter 1 Overview of a Financial Plan
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 4.1.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
HSA 171 CAR. 1436/ 7/4  The results of activities of an organization or investment over a given period of time.  Organizational Performance: ◦ A measure.
1 RBM Background Development aid is often provided on a point to point basis with no consistency with countries priorities. Development efforts are often.
Successful IT Projects slides © 2007 Darren Dalcher & Lindsey Brodie Successful IT Projects By Darren Dalcher & Lindsey Brodie
Service Transition & Planning Service Validation & Testing
General Principles for the Procurement of Goods and Services Asst. Prof. Muhammad Abu Sadah.
ROLE OF INFORMATION IN MANAGING EDUCATION Ensuring appropriate and relevant information is available when needed.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
McGraw-Hill© 2004 The McGraw-Hill Companies, Inc. All rights reserved.
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
PPA 502 – Program Evaluation Lecture 2c – Process Evaluation.
CHAPTER 4: Procurement.
SOCIAL BUSINESS PLAN. SOCIAL BUSINESS  Social enterprise is a business that trades for a social purpose. The social aims of the business are of equal.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Public Relations DPR 3B Template for a Public Relations Strategy based on the TOCOM Model Learning Unit 2.3 Student Manual pp August 2011.
ENTERPRISE RESOURCE PLANNING
Professional Certificate in Electoral Processes Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
© 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
PPTTEST 12/26/ :41 1 IT Ron Williams Information Technology Management Project Management.
Kathy Corbiere Service Delivery and Performance Commission
Capacity Planning Pertemuan 04
Company: Cincinnati Insurance Company Position: IT Governance Risk & Compliance Service Manager Location: Fairfield, OH About the Company : The Cincinnati.
Managing the Planning Process 1. ____ is a system designed to identify objectives and to structure the major tasks of the organization to accomplish them.
Managing the Planning Process
Lecture 27 Electronic Business (MGT-485). Recap – Lecture 26 E-Business Strategy: Implementation – Organizational Structure and e-Business The Boundary-less.
Chapter 1 Overview of a Financial Plan. Copyright ©2014 Pearson Education, Inc. All rights reserved.1-2 Chapter Objectives Explain how you benefit from.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
5-1Capacity Planning William J. Stevenson Operations Management 8 th edition.
Advanced Higher Computing Science
Managing the Planning Process
Constraint Management
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Managing the Planning Process
Production and Operations Management
Managing the Planning Process
Managing the Planning Process
Capacity Planning For Products and Services
Presentation transcript:

© Steven Alter, 2010, all rights reserved Validating Work System Principles for Use in Systems Analysis and Design Steven Alter Ryan Wright Presentation at ICIS 2010 Dec. 14, 2010

© Steven Alter, 2010, all rights reserved Outline Overview of work system method Need for work system principles Proposed principles Validation of principles Discussion –Method for validating principles? –WS principles vs. IS principles ? –Usefulness of principles? –Next steps?

© Steven Alter, 2010, all rights reserved Examples of Work Systems (from papers by MBA students at Georgia State Univ. ) Calculating rates for insurance renewals Managing software development projects Acquiring clients at a professional service firm Receiving materials at a large warehouse Approving real estate loan applications Planning and dispatching trucking services Performing pre- employment background checks Performing financial planning for wealthy individuals Scheduling and tracking health service appointments Operating an engineering call center Purchasing advertising services Determining salary increases Collecting and reporting sales data for a wholesaler Planning for outages in key real time information systems Invoicing for construction work

© Steven Alter, 2010, all rights reserved Definition of Work The application of resources such as people, equipment, time, effort, and money to generate products and services for internal or external customers

© Steven Alter, 2010, all rights reserved Definition of Work System A system in which human participants and/or machines perform work using information, technology, and other resources to produce products and/or services for internal or external customers

© Steven Alter, 2010, all rights reserved Work System Framework

© Steven Alter, 2010, all rights reserved Work system Service system Information system Project Supply chain Use of e-commerce web site One Lens Fits Almost All

© Steven Alter, 2010, all rights reserved Work System Life Cycle Model Initiation Implementation Development Operation & Maintenance

© Steven Alter, 2010, all rights reserved System and Problem –Define work system based on problem –Summarize “as is” using work system snapshot Analysis and Possibilities –Drill down using work system elements and alignment within the work system Recommendation and Justification –Summarize “to be” using work system snapshot –Drill down to understand impact of changes –Various questions related to recommendation and justification Basics of Work System Method

© Steven Alter, 2010, all rights reserved Need for Work System Principles Identifying problems and issues with current work systems Visualizing directions for improvements Evaluating proposed improvements

© Steven Alter, 2010, all rights reserved Quiz After three decades of IS research, what basic principles should govern the operation of systems in organizations? –(Systems in operation, not system development) Is it possible for valid principles to be mutually contradictory? Explain why work system principles belong in systems analysis textbooks.

© Steven Alter, 2010, all rights reserved Sources of Work System Principles (2002) Initial set of principles, one for each work system element (2004) Add revised versions of Cherns (1976) sociotechnical principles (2004) Add several more based on feedback from MBA and Executive MBA classes

© Steven Alter, 2010, all rights reserved Work System Principles (1-12) #1: Please the customers. #2: Balance priorities of different customers. #3: Match process flexibility with product variability. #4: Perform the work efficiently. #5: Encourage appropriate use of judgment. #6: Control variances (problems) at their source. #7: Monitor the quality and timing of both inputs and outputs. #8: Boundaries between process steps should facilitate control. #9: Match the work practices with the participants. #10: Serve the participants. #11: Align participant incentives with system goals. #12: Maintain clear roles and responsibilities

© Steven Alter, 2010, all rights reserved Work System Principles (13-24) #13: Provide information where it will affect action. #14: Protect information from inappropriate use. #15: Use appropriate technology. #16: Minimize effort consumed by technology. #17: Take full advantage of infrastructure. #18: Maintain compatibility and coordination with other work systems #19: Minimize unnecessary conflicts with the external environment. #20: Support the firm’s strategy #21: Incorporate goals, measurement, evaluation, and feedback. #22: Minimize unnecessary risks. #23: Maintain balance between work system elements. #24: Maintain the ability to adapt, change, and grow.

© Steven Alter, 2010, all rights reserved Validate Work System Principles Six small cohorts of Executive MBA students between –101 usable responses Correctness score (1-7) –“Most work systems in my organization should conform” Conformance score (1-7) –“Most work systems in my organization actually do conform.”

© Steven Alter, 2010, all rights reserved Results: Average Correctness = 5.94

© Steven Alter, 2010, all rights reserved Results: Average Conformance = 4.25

© Steven Alter, 2010, all rights reserved Statistical Results Work system principle CorrectConformDiff.T #1: Please the customers * #2: Balance priorities of different customers * #3: Match process flexibility with product variability * #4: Perform the work efficiently * #5: Encourage appropriate use of judgment * #6: Control problems at their source * #7: Monitor the quality of both inputs and outputs * #8: Boundaries between process steps should facilitate control * #9: Match the work practices with the participants * #10: Serve the participants * #11: Align participant incentives with system goals *

© Steven Alter, 2010, all rights reserved #12: Operate with clear roles and responsibilities * #13: Provide information where it will affect action * #14: Protect information from inappropriate use * #15: Use cost/effective technology * #16: Minimize effort consumed by technology * #17: Take full advantage of infrastructure * #18: Minimize unnecessary conflict with the external environment * #19: Support the firm’s strategy * #20: Maintain compatibility and coordination with other work systems * #21: Incorporate goals, measurement, evaluation, and feedback * #22: Minimize unnecessary risks * #23: Maintain balance between work system elements * #24: Maintain the ability to adapt, change, and grow * AVERAGE Note: * p < for a two tailed paired test Work system principle CorrectConformDiffT

© Steven Alter, 2010, all rights reserved Correctness: Highest and lowest Score Work system principle Highest Lowest #1: Please the customers. 6.3 #4: Perform the work efficiently. 6.3 #13: Provide information where it will affect action. 6.2 #19: Support the firm’s strategy 6.2 #24: Maintain the ability to adapt, change, and grow. 6.3 #3: Match process flexibility with product variability. 5.5 #5: Encourage appropriate use of judgment. 5.3 #16: Minimize effort consumed by technology. 5.3 #23: Maintain balance between work system elements. 5.5

© Steven Alter, 2010, all rights reserved Conformance: Highest and lowest Work system principleHighestLowest #1: Please the customers. 4.5 #12: Operate with clear roles and responsibilities 4.5 #14: Protect information from inappropriate use. 5.0 #19: Support the firm’s strategy 4.5 #22: Minimize unnecessary risks. 4.6 #6: Control problems at their source. 3.9 #7: Monitor the quality of both inputs and outputs. 3.9 #11: Align participant incentives with system goals. 3.6 #16: Minimize effort consumed by technology. 3.8 #21:Incorporate goals, measurement, evaluation, and feedback 3.9

© Steven Alter, 2010, all rights reserved Work Principles Gaps Work system principles with highest gapsRaw Diff. Score Stand. Diff. Scores #4: Perform the work efficiently #7: Monitor the quality of both inputs and outputs #11: Align participant incentives with system goals #21: Incorporate goals, measurement, evaluation, and feedback #24: Maintain the ability to adapt, change, and grow Work system principles with lowest gapsRaw Diff. Score Stand. Diff. Scores #5: Encourage appropriate use of judgment #8: Boundaries between process steps should facilitate control #14: Protect information from inappropriate use

© Steven Alter, 2010, all rights reserved Conclusions and Future Research Additional validation –(need to replicate in Paris, Rio de Janeiro, Angor Wat, and Bali.) Evaluate link to organizational success Incorporate into systems analysis and design Test in the practice of systems analysis and design Can we tie performance outcomes to normative principles?

© Steven Alter, 2010, all rights reserved Larger Questions Work system principles vs. information system principles Alternative principles not included Optimal number of principles Criteria for good principles Potential applications of principles