Class 12: Chapter 8: Lean Systems Class 12 Agenda –Review Exam question challenges –Review Grade Sheet –Discuss Classroom Performance Process –Comments.

Slides:



Advertisements
Similar presentations
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
Advertisements

JIT, TPS, and Lean Operations
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
Making your Portable Restroom business Lean and mean – How to boost productivity and increase your bottom line.
Just-In-Time and Lean Systems
Just-in-Time and Lean Systems
Lean Operations (JIT) Module
Operations Management Just-in-Time Systems Supplement 12
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 15 Just-In-Time Systems.
1 Lean Thinking MGMT Lean Thinking A philosophy Principles Practices For the design, operation, management, control and continuous improvement.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
Lean Deployment in Supply Chain: Materials
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Systems Operations Management Chapter 16 Roberta Russell.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Lean operations and JIT
Lean for Process Manufacturing QAD Midwest User Group Meeting Stephen Dombroski – September 2011.
Operations Management
JIT and Lean Operations
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 8 Lean Systems McGraw-Hill/Irwin.
Chapter 7, Lean Thinking and Lean Systems
Introduction to Lean1 LSSG Green Belt Training Lean: An Introduction.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. JIT and Lean Operations.
Toyota Production System (TPS) MGMT- E5060 Operations Management.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Lean Production - Objectives
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
© 1997 Prentice-Hall, Inc Principles of Operations Management Just-In-Time Systems Chapter 11.
Just-In-Time & Lean Systems
LEAN system.
JIT and Lean Operations
Just in Time Neil Towers. Definition of Just in Time Wherever possible no activity should take place in a system until there is a need for it. The system.
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
New Directions Learning & Development  All Rights Reserved. Lean Your Library: How Lean Six Sigma Strategies Can Improve Operations.
Just-in-Time and Lean Operations. Developments of JIT and Lean Operations 1960’s: Developed as Toyota Production System by Taiichi Ohno and his colleagues.
Introduction to lean philosophy
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Lean Manufacturing Chapter 15 pp June 29, 2012.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
Chapter 12 Just-in-Time and Lean Manufacturing. What is JIT? (Just-in-Time) An operations philosophy involving many techniques for improving the effectiveness.
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
“Without the Cost of Waste …”
Slack, Chambers and Johnston, Operations Management 5 th Edition © Nigel Slack, Stuart Chambers, and Robert Johnston 2007 Chapter 15 Lean operations and.
Just-in-Time and Lean Operations. Developments of JIT and Lean Operations 1960’s: Developed as Toyota Production System by Taiichi Ohno and his colleagues.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
13-1 Learning Objectives  Explain what is meant by the term lean operations system.  List each of the goals of JIT and explain its importance.  List.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
Operations Fall 2015 Bruce Duggan Providence University College.
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
Reid & Sanders, Operations Management © Wiley 2002 Just-In-Time Systems 7 C H A P T E R.
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Just In Time ….. Just in Time Philosophy Salient features  The notion of waste in any operating system  JIT as a philosophy of elimination of waste.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 15 JIT and Lean Operations.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
16 - 1© 2011 Pearson Education 16 JIT, Lean Operations, and the Toyota Production System PowerPoint presentation to accompany Heizer and Render Operations.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 9 JIT and Lean Operations.
Lean Production Just in time - It originally referred to the production of goods to meet customer demand exactly, in time quality and quantity, whether.
Lean operations and JIT
Lean Manufacturing Basic Overview XYZ Company.
Pull Manufacturing and Just In Time
Operations Management
Just-In-Time and Lean Production
MGS 4020 Business Intelligence LSS Jul 19, 2018
Contemporary Issues in Industrial and Management Engineering
LEAN PRODUCTION BY Alfredo Moran Johnny Rojas January, 2006.
Presentation transcript:

Class 12: Chapter 8: Lean Systems Class 12 Agenda –Review Exam question challenges –Review Grade Sheet –Discuss Classroom Performance Process –Comments on secondary reseach poposals News of Note –Powerful Women’s Conference Job Outlook DuPont / Kraft / Pepsi / –Revamping Community Colleges – Gates; Foundation / –Chinatowns in Africa – Nothing new? –Charles Gasperino’s Book –Google TV Introduced Complete Coverage of Chapter 7

1.Explain how lean systems improve internal and supply chain operations 2.Describe the culture changes, tools and techniques needed for implementation 3.Apply lean to product design 4. Recognize strengths and limitations of lean systems 8–2 Learning Objectives

Lean Systems Defined 8–3 Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as implemented at Toyota Lean Systems Approach: a philosophy of minimizing the resources needed for processes 1. Only the good/services that customers want 2. As quickly as customers want 3. With only features customers want 4. With perfect quality 5. In minimum possible lead time 6. Without waste 7. With occupational development of workers

Cost Structure Changes 8–4 Figure 8-3

Principle 1: Specify Value Customers determine value Suppliers must provide products/services with customer desired –Outcomes –Product features –Functionality –Capabilities Anything that doesn’t add value is waste 8–5

Principle 2: Indentify Value Stream 8–6 1.Overproduction: processing more than needed 2.Waiting: resources waiting for work/materials 3.Transportation: units moved unnecessarily 4.Processing: excessive or unnecessary steps 5.Inventory: units waiting for processing or delivery 6.Motion: unnecessary or excessive resource activity 7.Defects: scrap, rework or correction Waste is a symptom of a problem, and does not add value

Principle 3 : Make Value Flow Inventory hides problems and slows flow 8–7 Figure 8-4

Principle 4: Customers Pull Value Pull System: processes are activated by actual, not forecasted demand Customer get – what they want – when they want – where they want 8–8

Principle 5: Pursue Perfection Lean System Culture: places a high value on respect for people –Acceptance: agree to goals, veterans teach new employees –Flexibility: responsive pull systems –Teams: cross-functional & cross-organizational –Employee empowerment: employees work to attack waste –Manage with data: objective over subjective –Waste as a symptom: attack root cause –Goals are met: set realistic, achievable goals –Standardization: reduces variation, simplifies problem solving –Process focus: process change for outcome change 8–9

Lean Tools and Techniques Total Productive Maintenance (TPM): prevention of breakdowns Group Technology: bring together resources to process a family of items Focused Factories: processes designed to satisfy specific customer segment Takt Time: synchronizing output rate with demand rate Kanban (Pull): output generated in response to actual demand 8–10

Lean Tools and Techniques cont’d Level, Mixed Model (heijunka): build smaller quantities more frequently Set-up Reduction: shorter, easier change- over leads to smaller batches Single Minute Exchange of Dies (SMED): Process for reducing set-up Statistical Process Control (SPC): use of statistical tools to monitor processes Visual Control: performance and problems easily, immediately visible 8–11

Lean Tools and Techniques cont’d Kaizen Events: short-term, cross-functional focused, intense process improvement Gemba: go see it in person Poka-Yoke: redesign so mistakes are impossible or immediately detectable 5-S: effective housekeeping (sort, straighten, scrub, systematize, standardize) Simplification/Standardization: removing non- value add steps, making processes exactly repeatable 8–12

Lean Tools and Techniques cont’d Process Analysis/Value Stream Mapping: graphical analysis flow through a process Figure 8-5 8–13

Application of Lean Reduction of inventory, lead time and buffers – Purchase for lowest total cost (not price) –Geographically close partners –Fewer suppliers –Focus on root cause –Work with, not against, suppliers Lean Design: strive to meet the objectives of: –Exactly meet customer needs –Support corporate strategy –Reduce opportunities of waste 8–14

Application of Lean Reducing Product Design Waste : –Complexity: few, simple processes –Precision: capability to attain specifications –Variability: attainable specifications –Sensitivity: not easily damaged –Immaturity: tested technology –Danger: customers & environment are safe –High skill: ease for workers and customer 8–15

Lean Systems Summary 1.Corporate wide approach to indentify, control and eliminate waste, within firm and across supply chain 2.Seven major objectives 3.Multiple lean tools that work synergistically 4.Should be expanded across firm functions and across the supply chain 5.Not universally applicable 8–16