Recap Clamp Production and Installation RIKEN/RBRC Itaru Nakagawa 1.

Slides:



Advertisements
Similar presentations
SMG facility – 24k Square Feet. Drilling We have 7 fully automated Excellon Drilling/ Routing machines. The drilling program is generated from the customer.
Advertisements

Construction of electronic systems C.Bohm Components + connections 2-pole (resistors), 3-pole (transistors) 4-pole (transformers) pole vacuum tubes)
IS Tech Application Resistance to change.  Is necessary  Competition, consumers, technology demand ▪ Better, more perfect products/services ▪ Lower.
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
HEAT PUMPS.
Recap Clamp 1008 and Production RIKEN/RBRC Itaru Nakagawa 1.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April GeV pp (2+3 weeks) GeV pp (1+6 weeks)?
Energy Delivery Delivering energy safely, reliably, efficiently and affordably. Holland Bottom 500/161/115kV Substation.
MuTr Recapacitation RIKEN/RBRC Itaru Nakagawa 中川格 1.
Coldfire Computer Final Presentation Josh Hudgins Randy Jedlicka Drew Larson Project Staff:
Learn-to-Solder Exercise: Practice Flasher Circuit AEM 1905: Spaceflight with Ballooning University of Minnesota.
1 Guide to Soldering. 2 Key Concepts in Soldering.
Walls crates cables gas chambers electronics CERN adb.
1 New dividers for LAV photomultipliers G.Corradi,D.Tagnani,C.Paglia, M. Raggi LAV working group CERN 3/2/2010.
MuTr Recap Status and Plan. Plan We are shooting for North Station-1 for post Run10 shutdown installation. Best scenario is to mount portable “clamp”
LUMI 1 LUMI Mechanical Design Details Bill Ghiorso.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC.
2007 Electronic Project Kit Remote Control Nightlight Biological & Agricultural Engineering.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
TPC-Meeting : Københaven Ne-CO 2 Gas System : Status CO 2 - Gas System : Insulating Gap Resistor Rod : –Contacts –Cooling --> Liquid –Cooling -->
LSU 09/12/2013Electronics - SkeeterSat1 Building SkeeterSat Inventory Components  Identify components Use the parts list and assembly manual  Tape to.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
Run11 MuTrig-FEE Summary RIKEN/RBRC Itaru Nakagawa 1.
Building a Weather Station for a Near-Space Payload AEM 1905: Spaceflight with Ballooning University of Minnesota.
MuTR/MuTrig Readiness for Run13 Itaru Nakagawa on Behalf of MuTrig/MuTr Group 1.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
IPC Thermal Transfer Components, which for thermal reasons require extensive surface contact with the board or with a heatsink mounted on the.
1 MuTRG-FEE Upgrade Status RIKEN/RBRC Itaru Nakagawa.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
1 South Arm Installation Plan Itaru Nakagawa RIKEN/RBRC.
10/18/20121 PHENIX WEEKLY PLANNING 10/18/12 Don Lynch.
IPC In-Circuit Test Fixtures In-circuit test fixtures are commonly called bed-of-nails fixtures. A bed-of- nails fixture is a device with.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
HV boards 1.FIRST ASDBLR HV PROTO BOARD: leakage currents on 100nA CH, humidity at cern. 2. TRIAL 1 Encapsulate caps in Printed Circuit Board C schock,
Robert Pak, FVTX Annual Review Nov Mechanical Integration WBS Robert Pak Brookhaven National Laboratory.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
Recap Clamp for MuTr Station-3 Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration Especially credit to: Tsutomu Mibe (KEK) Yoshinori Fukao.
Onsite Status RIKEN/RBRC Itaru Nakagawa. OASys Light Source Spacer.
LSU 08/11/2004Electronics 41 Assembly Techniques Electronics Unit – Lecture 4 Component Preparation Component Placement and Soldering Inspection Activity.
Two-Stage Copeland Scroll Compressors. DESIGN AIR UNIVERSITY External view 1 st stage = 67% 2 nd stage = 100% Used in 17 SEER AC.
Recap Clamp Installation RIKEN/RBRC Itaru Nakagawa 1.
Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Fuse Boxes Chiho Wang Duke University.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box & Capacitor Status Chiho Wang Duke University.
Conformal Coat Quality issues Update of November 3, 2004.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Onsite Report Itaru Nakagawa RIKEN/RBRC. Schedule.
Sensor Module v1.1. Step 1: Sand edges of PCB & drill bolt holes (3mm) Use small green power drill or pillar drill (as available) Goggles Use a piece.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for.
Preparation for Run10 RIKEN/RBRC Itaru Nakagawa. TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364.
MODULE 6: Soldering SUMMER CHALLENGE Electrical Engineering: Smart Lighting Michael Rahaim, PhD Candidate Multimedia Communications Lab Boston University.
A Different Soldering Class “Surface Mount Soldering”
LAV HV repair plans Matthew Moulson
Process map NVA VA VA VA VA NVA VA NVA NVA NVA NVA NVA VA NVA NVA NVA
installing electrical system
FEE Electronics progress
F. Ronchetti, INFN-LNF, September
Power Block Implementation
ABE463 AS20 Interface.
Learn-to-Solder Exercise: Practice Flasher Circuit
Testing of the EMCO Prototype Boards
Seyoung Han / Ewha Woman’s Univeristy
GLAST Large Area Telescope:
Presentation transcript:

Recap Clamp Production and Installation RIKEN/RBRC Itaru Nakagawa 1

Components MaterialFlame ResistanceMisc Print boardFR-4UL94 V-0 CapacitorsCeramicUL94 V-0V-resistant 3kV (orig. 4.5kV) Resistors Readout SocketBlass Probe pinBlass rubberUL94 V-0 ScrewSS316 Thru hole tapBlass Clamp Base/spacerpolyphenylene sulfide (PPS) UL94 V-0 Coating 2

Statistics 3

Production Cost US$ = 100 Yen Unit PricePer clamp Capacitor 0.58 Resister Thru whole tap 116 V-Readout Socket 116 Pin Probe 116 Print Board 55 Support Structure Screw116 Total Per clamp560 clamps Material10056k Assembly10056k Total200112k Sub Total 560 Clamps112k Initial Cost10k Profit+TAX12.2k Total152k Coating? Dry Air Cover Unit Price Total16.8k

5 Automation 1.Mount capacitor without cutting legs 2.Soldering 3.Cut off legs Manual Mounting 1.Chop off capacitor legs 2.Mount capacitor 3.Solder

Clamp Schedule clamps production 40 clamps Install Humidity test bench Design Review 5/16 Humidity 1008 ProcurementBid Production Partial Delivery QA Install Delivered to BNL L 6

QA Plan Test RIKEN 7 Contacts (Sampling) Visual Inspection Humidity Performance (Sampling)

PHENIX Requirement Station2&3 Scaffold Dry Air System – Compressor capacity – Pluming – Manifolds – Adapters 8

Station-2&3 Scaffold Access to Anode Area Simultaneously Install Station-2 terminators Simultaneously Install Station-2 terminators 9

PHENIX Dry Air Present40 cfm New Compressor99 cfm Octant Manifold 20 branches/gap 40 branches/gap 10

Installation Duration /clamp/gap/oct/arm Inspection, Mount ¼510 HV test⅕*⅕*12 Debug1224 Dry Air¼510 Total * per 4 clamps Unit : hour 10 weeks man 3 ~ 4 weeks 3man 10 weeks man 3 ~ 4 weeks 3man Installation Crews: IN(2), Yoshimitsu Imazu(4), Kentaro Watanabe(2), Yoshinori Fukao(2), New Senior Ph.D Student(2) Total (12) 11

To be addressed Complete humidity test Dry air test Heat cycle test Optimize coating 12