SCIPP R&D on the International Linear Collider Detector SCIPP Review November 29, 2005 Presenter: Bruce Schumm.

Slides:



Advertisements
Similar presentations
SUSY in the Forward Region Bruce Schumm UC Santa Cruz ECFA/DESY Linear Collider Workshop April 1-4, 2003.
Advertisements

R&D Towards a Solid-State Central Tracker in NA World-Wide Review of LC Tracking January 8, 2004 Bruce Schumm SCIPP & UC Santa Cruz.
The performance of Strip-Fiber EM Calorimeter response uniformity, spatial resolution The 7th ACFA Workshop on Physics and Detector at Future Linear Collider.
Simulation Studies of a (DEPFET) Vertex Detector for SuperBelle Ariane Frey, Max-Planck-Institut für Physik München Contents: Software framework Simulation.
Long Shaping-time Silicon Readout Bruce Schumm University of California, Santa Cruz Amsterdam ECFA-DESY Workshop April
SCIPP R&D on Time-Over-Threshold Electronics and Long-Ladder Readout Beijing Linear Collider Workshop Beijing, China February Bruce Schumm.
Long Shaping-time Silicon Readout Bruce Schumm UC Santa Cruz Arlington Linear Collider Workshop January
SCIPP R&D on Long Shaping- Time Electronics SLAC SiD Workshop October 26-29, 2006 Bruce Schumm.
ILC R&D at SCIPP: Progress Report De-scoped ($97.5K) Proposal Activities Radiation Hardness for BeamCal sensors (new; with SLAC) KPiX/Double Metal Performance.
Testbeams for Tracking Prototypes Two categories: TPC/Gaseous tracking – please chime in Solid-state (silicon  strip) tracking – will present some issues.
SCIPP R&D on Time-Over-Threshold Electronics and Long-Ladder Readout Beijing Linear Collider Workshop Beijing, China February Bruce Schumm.
SUSY studies at UCSC Bruce Schumm UC Santa Cruz Victoria Linear Collider Workshop July 28-31, 2004.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SiLC Meeting November 18, 2005.
SCIPP R&D on the International Linear Collider Detector SCIPP Review May 18, 2006 Presenter: Bruce Schumm.
SCIPP R&D on the International Linear Collider Detector DOE Site Visit June 28, 2005 Presenter: Bruce Schumm.
Thoughts About (Silicon) Tracking for the Linear Collider Detector(s) Bruce Schumm SCIPP & UC Santa Cruz SCIPP Seminar May 10, 2005.
The SCIPP LSTFE Time-Over- Threshold Electronics Readout Project SILC Meeting, Santander, Spain December, 2008 Bruce Schumm Santa Cruz Institute.
E cm up to 1 TeV, de- pending on site chosen Design luminosity of 2x10 34 cm -2 s -1 Beam spot: 550x5.7 nm Crossings every 337 ns for about 1  s; repeats.
SLEPTON MASS RECONSTRUCTION AND DETECTOR RESOLUTION Bruce Schumm University of California at Santa Cruz ALCPG Workshop, Snowmass Colorado August 14-28,
Thoughts on B-Field Uniformity for the SD Tracker SID Tracking Meeting October 22, 2004 Bruce Schumm UC Santa Cruz March 2001 Baseline Thanks to Harry.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LC Workshop January 6-10, 2004.
FORWARD SELECTRON PRODUCTION AND DETECTOR PERFORMANCE Bruce Schumm University of California at Santa Cruz SLAC LCWS05 Special Recognition: Troy Lau, UCSC.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
Tracking Efficiency and Momentum Resolution Analysis Chris Meyer UCSC ILC Simulation Reconstruction Meeting March 13, 2007.
R&D Towards a Solid-State Central Tracker in NA World-Wide Review of LC Tracking January 8, 2004 Bruce Schumm SCIPP & UC Santa Cruz.
CURVATURE RECONSTRUCTION PERFORMANCE SLAC ILC Simulation Meeting September Alex Bogert (Undergraduate student) Bruce Schumm Question: ILD Higgs.
SCIPP R&D on Long Shaping- Time Electronics 4 th SiLC Meeting Barcelona, Spain (by remote connection) December Bruce Schumm.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
SCIPP R&D on Long Shaping- Time Electronics SLAC SiD Workshop October 26-28, 2006 Bruce Schumm.
SIMULATION RESULTS FROM THE SANTA CRUZ LINEAR COLLIDER GROUP Bruce Schumm University of California at Santa Cruz 4 th SiLC Meeting, Barcelona December.
SCIPP R&D on Linear Collider Tracking – Hardware and Simulation DOE Site Visit June Bruce Schumm Santa Cruz Institute for Particle Physics.
General Thoughts About Tracking for the Linear Collider Detector(s) Bruce Schumm SCIPP & UC Santa Cruz Snowmass Linear Collider Workshop August 14-28,
SCIPP R&D on Long Shaping- Time Electronics ALCPG Workshop Vancouver, BC, Canada July 19-22, 2006 Bruce Schumm.
SCIPP R&D on Time-Over- Threshold Electronics and Long- Ladder Readout LCWS 07 DESY May 30 – June Bruce Schumm Santa Cruz Institute for Particle.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz Victoria Linear Collider Workshop July 28-31, 2004.
A new idea of the vertex detector for ILC Y. Sugimoto Nov
Silicon Microstrip R&D at SCIPP and the University of California at Santa Cruz Future Linear Colliders Spanish Network Universidad de Sevilla February.
1 LumiCal Optimization and Design Takashi Maruyama SLAC SiD Workshop, Boulder, September 18, 2008.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz Cornell LC Workshop July 13-16, 2003.
SiD Tracking Simulation: Status and Plans Richard Partridge for the SiD Tracking Group Vancouver Linear Collider Workshop July 19-22, 2006.
ILC Tracking R&D at SCIPP SiD Workshop Thursday, June Bruce Schumm Santa Cruz Institute for Particle Physics.
The Gossamer Tracker: A Novel Concept for a LC Central Tracker Bruce Schumm SCIPP & UC Santa Cruz UC Davis Experimental Particle Physics Seminar June 3,
Non-prompt Track Reconstruction with Calorimeter Assisted Tracking Dmitry Onoprienko, Eckhard von Toerne Kansas State University, Bonn University Linear.
Impact parameter resolution study for ILC detector Tomoaki Fujikawa (Tohoku university) ACFA Workshop in Taipei Nov
Highlights From ILC R&D at SCIPP LCWS 2010 Friendship Hotel, Beijing, PRC March Bruce Schumm Santa Cruz Institute for Particle Physics.
The Santa Cruz Linear Collider Group Simulation Effort SiLC Workshop Prague, Czech Republic April 26, 2007 Bruce Schumm.
26 Apr 2009Paul Dauncey1 Digital ECAL: Lecture 1 Paul Dauncey Imperial College London.
ILC Instrumentation R&D at SCIPP ALCPG ‘09 University of New Mexico September 29 – October Bruce Schumm Santa Cruz Institute for Particle Physics.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
Tracking at the ILC: Why Silicon Tracking is Best, and How it Might Be Optimized Bruce Schumm SCIPP & UC Santa Cruz STD6 “AbeFest” September 11, 2006.
SCIPP R&D on the International Linear Collider Detector DOE Site Visit June 28, 2005 Presenter: Bruce Schumm.
Silicon Detector Tracking ALCPG Workshop Cornell July 15, 2003 John Jaros.
1 Nick Sinev, ALCPG March 2011, Eugene, Oregon Investigation into Vertex Detector Resolution N. B. Sinev University of Oregon, Eugene.
Andrei Nomerotski, University of Oxford ILC VD Workshop, Menaggio 22 April 2008 SiD Vertex Detector.
J. Brau LCWS 2006 March, J. Brau LCWS Bangalore March, 2006 C. Baltay, W. Emmet, H. Neal, D. Rabinowitz Yale University Jim Brau, O. Igonkina,
Tracking R&D at SCIPP: Charge Division Long Ladder Readout Noise Non-Prompt Tracks with SiD CERN Linear Collider Workshop October
SCIPP R&D on the International Linear Collider Detector DOE Site Visit June 8, 2006 Presenter: Bruce Schumm.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
VXDBasedReco TRACK RECONSTRUCTION PERFORMANCE STUDIES Bruce Schumm University of California at Santa Cruz ALCPG Workshop, Snowmass Colorado August 14-28,
Silicon Microstrip Tracking R&D in the US SiLC Collaboration Meeting University of Paris VII January 25, 2010 Bruce Schumm Santa Cruz Institute for Particle.
ILC Instrumentation R&D at SCIPP ALCPG ‘09 University of New Mexico September 29 – October Bruce Schumm Santa Cruz Institute for Particle Physics.
SiD Tracking in the LOI and Future Plans Richard Partridge SLAC ALCPG 2009.
Simulation Plan Discussion What are the priorities? – Higgs Factory? – 3-6 TeV energy frontier machine? What detector variants? – Basic detector would.
CMOS Pixels Sensor Simulation Preliminary Results and Plans M. Battaglia UC Berkeley and LBNL Thanks to A. Raspereza, D. Contarato, F. Gaede, A. Besson,
FP-CCD GLD VERTEX GROUP Presenting by Tadashi Nagamine Tohoku University ILC VTX Ringberg Castle, May 2006.
Time-Over-Threshold Readout Long Ladder Readout Noise
Requirements and Specifications for Si Pixels Sensors
Individual Particle Reconstruction
Linear Collider Simulation Tools
International Tracking Testbeam Needs
Presentation transcript:

SCIPP R&D on the International Linear Collider Detector SCIPP Review November 29, 2005 Presenter: Bruce Schumm

R&D Activity is increasing, with studies now on four fronts:  Physics and machine studies for e - e - running  Detector resolution standards from physics simulation  Reconstruction capabilities of all-silicon tracking  Hardware proof-of-principle of low-mass silicon tracking Current involvements (all very much part time) 3 senior physicists, 1 post-doc (looking for a second), 4 undergraduate thesis students, 1 Engineer, 2 technical staff, one bored spouse of a Silicon Valley engineer.

International Linear Collider: Activity on the e - e - Front Clem Heusch is the SCIPP participant in e - e - studies Leading international effort in the use and application of e - e - beams at the ILC Continuing series of workshops hosted by SCIPP; proceedings published in World Scientific Heusch is a member of ILC Subcommittee on International Collaboration.

Detector Resolution Standards from Selectron Production Participants: Senior Physicist Bruce Schumm Undergraduate Thesis Students Sharon Gerbode, Heath Holguin, Troy Lau *, Paul Moser, Adam Perlstein, Joseph Rose, Matthew Vegas Community Member (on hold before Grad School) Ayelet Lorberbaum * Recipient of two Undergraduate Research Awards; grad school at U. Michigan.

Original Motivation To explore the effects of limited detector resolution on our ability to measure SUSY parameters in the forward (|cos(  )| >.8) region. SiD Tracker

selectrons LSP SPS 1 Spectroscopy: At E cm = 1Tev, selectrons and neutralino are light. Beam/Brehm: √s min =1 √s max =1000  =.29 s z =.11 (mm)

sample electron energy distribution M selectron = (SPS1A) Lower Endpoint Upper Endpoint Electron energy distribution with beam/bremm/ISR (.16%). No detector effects or beam energy spread.

SPS1A at 1 TeV Selectrons vs. cos(  ) Electrons vs. cos(  ) Roughly ½ of statistics above |cos(  )| of 0.8, but…

The spectrum is weighted towards higher energy at high |cos(  )|, so there’s more information in the forward region than one might expect.

Determine the selectron mass accuracy in both the central (0 < |cos  | < 1) and full (0 < |cos  | < 1) region

Ongoing work: Fitting simulaneously for selectron and gaugino (  0 ) masses at E cm = 500 GeV This is an ILC Physics benchmark process (Lorberbaum, Schumm, Vegas)

Simulation of SiD Tracking System (and SiD variants) Participants: Senior Physicist Bruce Schumm Recent Graduate Students Christian Flacco, Michael Young * Undergraduate Thesis Student Eric Wallace * Supported primarily through department (TA) funds; SLAC paid for ½ of his support this summer.

Three areas of work: Fast MC Simulation Billior-based LCDTRK.f (B. Schumm) provides covariance matrices for fast MC simulation and resolution plots. Pulse Development Simulation Provides simulation of pulse development and amplification. Will soon be incorporated in international simulation framework (awaiting “hook” from Norman Graf at SLAC) SiD Tracking Capabilities Explore tracking performance of SiD tracker and variants Simulation of SiD Tracking System, continued

LCDTRK.f comparison of SiD options with TESLA (LDC) design, from Snowmass 2005

Pulse Development Simulation Long Shaping-Time Limit: strip sees signal if and only if hole is col- lected onto strip (no electrostatic coupling to neighboring strips) Charge Deposition: Landau distribution (SSSimSide; Gerry Lynch LBNL) in ~20 independent layers through thickness of device Geometry: Variable strip pitch, sensor thickness, orientation (2 dimen- sions) and track impact parameter Lorentz Angle: 18 mrad per Tesla (holes), from measurements

Carrier Diffusion Hole diffusion distribution given by Offest t 0 reflects instantaneous expansion of hole cloud due to space-charge repulsion. Diffusion constant given by Reference: E. Belau et al., NIM 214, p253 (1983)  h = hole mobility

Result: S/N for 167cm Ladder

Electronics Simulation Detector Noise: From SPICE simulation, normalized to bench tests with GLAST electronics Analog Measurement: Employs time-over- threshold with variable clock speed; lookup table provides conversions back into analog pulse height (as for actual data) RMS Gaussian Fit Detector Resolution (units of 10  m) Essential tool for design of front-end ASIC

Non-normal incidence Also need to understand performance as a function of various parameters, e.g., angle at entrance to the detector (identify issues for test-beam running)

Pattern Recognition Capabilities of an All- Silicon Central Tracker Can one do pattern recognition with only five central tracking layers? Might more layers improve performance to an extent that justifies the extra material? SiD Tracker Current code: Nick Sinev, U. Oregon

EVENT/TRACK SELECTION Choose qqbar events at E cm = 500 GeV (dense jet cores); Pan/Pythia and GEANT4 generation Choose events/tracks that should be easily recon- structed (tracks curl up below p  = 1 GeV): Event Selection  |cos  thrust | < 0.5  Thrust Mag > 0.94 Track Selection  |cos  track | < 0.5  p  > 5 GeV/c

EFFICIENCIES FOR QQBAR EVENTS Doesn’t look that spectacular; what might be going on here?

Of course! The requirement of a VXD stub means that you miss anything that originates beyond r ~ 3cm. This is about 5% of all tracks. With VXDBasedReco, we won’t see a difference between 5 and 8 layer tracking.

BAD TRACK FITS AND EFFICIENCY

TRACK PARAMETER PERFORMANCE 1.Compare width of Gaussian fit to residuals with two different estimates: Error from square root of appropriate diagonal error matrix element Error from Billior calculation (LCDTRK program) 2.Only tracks with all DOF (5 VTX and 5 CT layers) are considered. 3.Only gaussian smearing is used, since this is what is assumed for the two estimators. Qqbar sample extends out to ~100 GeV; use  +  - sample to get higher energy ( GeV) bin.

CURVATURE ERROR vs. CURVATURE Standard (Original) Code

CURVATURE ERROR vs. CURVATURE “NEW” CODE WITH MODIFIED FITTER

RESULTS FOR  (LOWEST  BIN) Residuals (Gaussian smear):  = 3.40x10 -7 Error Matrix:  = 3.12x10 -7 LCDTRK:  = 3.26x10 -7 Actual momentum resolution is about 9% worse than LCDTRK expectation Residuals (realistic CCD):  = 3.29x10 -7 Apparently, “realistic” CCD resolution is better than assumed value of 5  m

Getting close to ramped-up again with senior thesis student Eric Wallace.  Port our code into new simulation framework (making forward progress!)  Incorporate realistic pulse-development simulation (reconstruction efficiency in jet core) when ready  Validate “ported” version of code.  Combine with new stand-alone central tracker code (Tim Nelson, SLAC) and optimize.  Explore different tracker configurations (8 layers). Simulation Study Goals

Faculty/Senior Alex Grillo Hartmut Sadrozinski Bruce Schumm Abe Seiden Post-Docs [Gavin Nesom * ] Jurgen Kroseberg Students Michael Young Kunal Arya (Com- puter Eng. The SCIPP/UCSC ILC HARDWARE GROUP Lead Engineer: Ned Spencer Technical Staff: Max Wilder, Forest Martinez-McKinney * Recently lured away by the sirens of Silicon Valley

The Gossamer Tracker Ideas: Low noise readout  Long ladders  substantially limit electronics readout and support (alternatively, improved res- olution for shorter ladders) Thin inner detector layers Exploit duty cycle  eliminate need for active cooling  Competitive with gaseous track- ing over full range of momenta Also: forward region…

THE LSTFE-2 CHIP Long shaping-time front end suppresses 1/f noise, allowing for long-ladder readout Power cycling should reduce IR heating by close to x100 Analog measurement via time-over-threshold (TOT) from low-threshold “readout” comparator. Redesigned relative to LSTFE-1 to accommodate long pulse train and exploit more relaxed (5 Hz) duty cycle. Submitted to TSMC 0.25  m mixed-signal RF process; received August 11 (5 weeks late)

3  s shaping time; analog readout it Time-Over-Thres- hold with 400 nsec clock

1/4 mip 1 mip 128 mip Operating point threshold Readout threshold

RMS Gaussian Fit RMS Gaussian Fit Efficiency and Occupancy as a function of high threshold Resolution as a function of low threshold SIMULATED PERFORMANCE FOR 167cm LADDER

1 mip Expected analog gain of 140 mV/fC confirmed Transition to log- arithmic response (TOT) at ~ 1.5 mip INITIAL RESULTS

DIGITAL ARCHITECTURE: FPGA DEVELOPMENT Digital logic should perform basic zero suppression (intrinsic data rate for entire tracker would be approximately 50 GHz), but must retain nearest-neighbor information for accurate centroid.

Status of Back-End Architecture Development First-pass digital strategy worked out FPGA code developed for 8-channel system Simulated data stream (including noise and detector background) injected and processed in simulation Data rates estimated

FIFO (Leading and trailing transitions) Low Comparator Leading-Edge-Enable Domain Proposed LSTFE Back-End Architecture Clock Period  = 400 nsec Event Time 8:1 Multi- plexing (  clock = 50 ns)

Master FIFO Per 128 Channel Chip: 1 Master FIFO reads out 32 local FIFO’s Store in Master FIFO essentially complete by end of ~1ms beam spill Controller FIFO Proposed LSTFE Back-End Architecture (cont’d)

DIGITAL ARCHITECTURE VERIFICATION ModelSim package permits realistic simulation of FPGA code (for now, up to signal propagation delay) Simulate detector background and noise rates for 500 GeV running, as a function of read- out threshold. Per 128 channel chip ~ 7 kbit per spill  35 kbit/second For entire long shaping-time tracker ~ 0.5 GHz data rate (x100 data rate suppression) Nominal Readout Threshold

LONG LADDER CONSTRUCTION

SUMMARY Progress on key fronts: Front-end electronics development LSTFE-2 chip (cold-rf optimization) designed and testing underway Digital architecture Proposed back-end architecture developed and verified; raw data rates acceptable (0.5 GHz) Ladder construction underway Substantial work remains in all these areas; working towards testbeam run in late 2006