Preliminary Flood Risk Assessment in Relation to The Project of Flood Directive Marcin Jacewicz Regional Board for Water Management in Gdańsk.

Slides:



Advertisements
Similar presentations
Learning from Existing Evaluation Practices on the Impacts and Effects of Intellectual Property on Development Geneva 6th/7th October 2011 Evaluation Section.
Advertisements

Sheltering Communities from Coastal Storms NOAA Coastal Storms Program Sheltering Communities from Coastal Storms NOAA Coastal Storms Program Coastal Storms.
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Doing More With Less: Mitigation in a Changing Environment Experience in the Nile Basin Larry Brazil Riverside Technology, inc. Doing.
Climate change impacts and water in Western Balkan Blaz Kurnik EEA + colleagues from ETC.
The Action Plan on Climate Change in the Alps The Climate Portal of the Alpine Convention: A regional node of information.
AIACC Regional Study AS07 Southeast Asia Regional Vulnerability to Changing Water Resources and Extreme Hydrological due to Climate Change.
Prof. Dr. Robert Jüpner 4th ISFD, Toronto 2008 The new European Flood Management Directive and the municipal flood management system as one realization.
The EU Water Framework Directive and Sediments The Water Framework Directive was transposed into law in EU Member States at the end of Nearly two.
URBAN FLOODS IN GREECE Current situation and major research and development needs in Urban Flood Management Cost meeting, Warsaw, 29-31/5/2008 Vassilopoulos.
COMP8130 and COMP4130 Adrian Marshall Verification and Validation Risk Management Adrian Marshall.
Technologies for adaptation to climate change: How to make them work?
Internal Audit Practices MINISTRY OF FINANCE OF REPUBLIC OF TURKEY Twinning Project - Kick-off Meeting Dedeman Hotel
Viktor Yurochko Minsk’2011 Subregional Workshop of the Protocol on Pollutant Release and Transfer Registers for EECCA Countries Modern technologies of.
Institute of Meteorology and Water Management Roman Konieczny
Eurosion and Conscience projects - brief overview Tom Bucx (Deltares) 9 June 2011 EEA Expert meeting Methods and tools for assessing.
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
20th-21th October CRUE 2nd Common Call Kick Off Meeting Decentralised Integrated Analysis and Enhancement of Awareness through Collaborative Modelling.
Disaster Preparedness and Prevention Initiative for South Eastern Europe DPPI SEE Seminar on Strengthening Cooperation with Candidate Countries and Western.
EU Legislation in the field of environment – key developments in 2007 and rd ECENA Plenary Meeting 18 September 2008.
Enver AKSOY, MSc Head of Strategy Development Board of MoFAL Policy approaches of Ministry of Food, Agriculture and Livestock to pasture management in.
Swedish Society for Nature Conservation Water framework directive is a European law which aims at good water status in Europe. The law was taken in 2000.
Session 111 Marketing Plan Form a publicity subcommittee Make the media work for you Preparing to work with the media What is your message?
Vulnerability & Risk Hazard Mapping
© 2009 Barnes & Thornburg LLP. All Rights Reserved. This page, and all information on it, is the property of Barnes & Thornburg LLP which may not be reproduced,
Brownfields in Baltic States - Lifelong Educational Project CZ/08/LLP-LdV/TOI/ Legal aspects of brownfield redevelopment in Latvia Edmunds Teirumnieks.
Session Operational tools for sound basin management: The role of evaluation and information systems Patrick LAVARDE Director General ONEMA- The.
Building Capacity on Protected Areas Law & Governance Module 10 Marine Protected Areas - Special Features & International Law Obligations and Guidan ce.
Community Wildfire Protection Planning: HFRA and Beyond.
Marco Martuzzi World Health Organization Regional Office for Europe Health Impact Assessment as part of SEA.
Collaboration in climate policy assessment Case study : Danish strategy for adaptation to a changing climate (2008) Ayelotan Aishat Bukola, Badejo Oluwatobi.
Water.europa.eu Floods Reporting Drafting Group Progress report WG D Maria Brättemark WFD Team, DG ENV.D.1, European Commission.
INSTITUTE OF METEOROLOGY AND WATER MANAGEMENT PANEL II: ROLE OF NMHSS IN RISK IDENTIFICATION AS A FUNDAMENTAL BASIS FOR DISASTER RISK REDUCTION AUTHOR:
The EU Floods directive -Implementation in Sweden.
TRAP 5 th interregional meeting & Site Visits Limerick & Lough Derg, Ireland 9 th October 2013 CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional.
CriteriaYesNoEffectiveness of CVC 1. Continuity of Participation4100% 2. Representation and Access3175% 3. Self Efficacy4100% 4. Information Exchange and.
Preparing for Climate Change: British Columbia’s Adaptation Strategy Thomas White Climate Action Secretariat 26 January 2010.
Biodiversity.europa.eu BISE EEA and ETC/BD Rania Spyropoulou.
Floods: An EU Directive to coordinate and reduce risks
Expert Meeting Methods for assessing current and future coastal vulnerability to climate change 27 – 28 October 2010 Draft conclusions.
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 12. Risk Management.
The Prepared Process: The Next Generation
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
Climate Change & Environmental Risks Unit Research Directorate General
Risk management via an Innovative System based on Knowledge
14th MEETING OF WORKING GROUP F ON FLOODS Thursday 17 October 2013
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
14th MEETING OF WORKING GROUP F ON FLOODS Thursday 17 October 2013
Civil Protection Financial Instrument – Prevention Projects
Strengthening Early Warning Systems in Europe
Building Capacity on Protected Areas Law & Governance
DG AGRI, Unit F6 Bioenergy, biomass, forestry and climatic changes
Water Directors meeting
Labor Administration, Labor Inspection and
4th Stakeholder meeting 28 March 2006
Good Practices on Disaster Prevention in Europe
Gender mainstreaming in environmental
European action programme on
COMMENTS RELATED WITH FP7 Seventh Framework Programme
Gender Advisory Support to CSUD Project
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.4 Protecting citizens from environmental hazards European.
Flood hazard maps and Flood risk maps (Guidance and Schema)
This presentation has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational purposes.
Preliminary Flood Risk Assessment
Directive on the assessment and management of flood risks - towards implementation SCG, By Maria Brättemark, European Commission, DG Environment,
Progress report WG F Maria Brättemark, WFD Team, DG ENV.D.1, European Commission.
Flood Mapping Workshop
Integrated climate and disaster vulnerability, impacts and assessments
Skopje, 21 November 2017, General Population Survey results– launch
Basic principles Overview on proposals Clustering proposals
Presentation transcript:

Preliminary Flood Risk Assessment in Relation to The Project of Flood Directive Marcin Jacewicz Regional Board for Water Management in Gdańsk

Introduction EU Flood Directive – flood risk management EU Flood Directive – flood risk management Conscious, planned decision making process for the purpose of flood risk decrease Conscious, planned decision making process for the purpose of flood risk decrease GIS – Geographic Information System – the tool for the analysis GIS – Geographic Information System – the tool for the analysis Flood Risk Maps Flood Risk Maps EXCIMAP (European exchange circle on flood mapping) to elaborate guide of good practices of flood mapping in Europe EXCIMAP (European exchange circle on flood mapping) to elaborate guide of good practices of flood mapping in Europe

Three Steps of Work Preliminary flood risk assessment maps Preliminary flood risk assessment maps Flood hazard maps Flood hazard maps Flood risk maps. Flood risk maps.

Preliminary flood risk assessment First step – three years First step – three years Objective – to indicate flood risk areas where further steps will be taken Objective – to indicate flood risk areas where further steps will be taken „Flood risk is the combination of the probability of a flood event and of the potential adverse consequences to human health, the environment and economic activity associated with a flood” (Flood Directive) „Flood risk is the combination of the probability of a flood event and of the potential adverse consequences to human health, the environment and economic activity associated with a flood” (Flood Directive)

Questions How to indicate flood risk areas? How to indicate flood risk areas? What information do we have? What information do we have? How can we collect dispersed information? How can we collect dispersed information? How to evaluate risk? How to evaluate risk? Who will do it? Who will do it? How much time do we have? How much time do we have? How much it will cost? How much it will cost?

How to indicate flood risk areas? Indicated areas will be further the subject of expensive studies for hazard and then risk maps elaboration Indicated areas will be further the subject of expensive studies for hazard and then risk maps elaboration Not indicated areas may implicate consequences of unexpected risk and flood impact to this areas Not indicated areas may implicate consequences of unexpected risk and flood impact to this areas Analysis shall consider cost and available time of preparation (3 years) Analysis shall consider cost and available time of preparation (3 years) We have to collect as much as possible of existing data and then make a decision where the risk is high, medium and low We have to collect as much as possible of existing data and then make a decision where the risk is high, medium and low

What information do we have? Information about historical floods Information about historical floods Studies for flood protection Studies for flood protection Archives Archives Long term prognosis Long term prognosis Research Projects Research Projects Information about current and future land use Information about current and future land use Special hazards Special hazards Topography Topography Another dispersed data Another dispersed data

Data sources Regional Boards of Water Mangement (RZGW) Regional Boards of Water Mangement (RZGW) Boards of Reclamation (ZMiUW) Boards of Reclamation (ZMiUW) Institutes of Meteorology and Water Management (IMGW) Institutes of Meteorology and Water Management (IMGW) Maritime Offices Maritime Offices Research Institutes (IBW PAN, PGI, …) Research Institutes (IBW PAN, PGI, …) Local governments Local governments Centra Zarządzania Kryzysowego (Prevention Management Centers) Centra Zarządzania Kryzysowego (Prevention Management Centers) Fire Brigades Fire Brigades Citizens Citizens Other Other

Conclusion Information is dispersed Information is dispersed It is not possible to manage such information It is not possible to manage such information This information shall be collected within one manageable GIS data base This information shall be collected within one manageable GIS data base One of the general objectives for the preliminary risk assessment is to establish unique geodatabase placing all available flood information on the map.

How can we collect dispersed information? First step is to inform and aware all stakeholders about advantages of flood risk management and engage them to collaboration. All shall understand their responsibility for data sharing. First step is to inform and aware all stakeholders about advantages of flood risk management and engage them to collaboration. All shall understand their responsibility for data sharing. Second is to establish a tool simple to use for making it. Second is to establish a tool simple to use for making it. The information can be collected easier by using well designed internet portal The information can be collected easier by using well designed internet portal This portal shall give opportunity for anyone, even inexperienced, to introduce to the GIS geodatabase any flood information by simple clicking This portal shall give opportunity for anyone, even inexperienced, to introduce to the GIS geodatabase any flood information by simple clicking Data sharing have to be obligatory for main institutional stakeholders and voluntary for another. Data sharing have to be obligatory for main institutional stakeholders and voluntary for another.

Historical Floods

Flood Protection Study

Data evaluation Then after we will have fragments of rivers and coast lines where flood is possible. Then after we will have fragments of rivers and coast lines where flood is possible. There is a question of data reliability criteria There is a question of data reliability criteria The source where data come from The source where data come from Data recurrence Data recurrence Data before changes Data before changes According this criteria we can produce flood probability According this criteria we can produce flood probability

How to evaluate risk? Risk = probability x consequences Risk = probability x consequences Consequences we can for this preliminary assessment evaluate on the basis of the map of land use Consequences we can for this preliminary assessment evaluate on the basis of the map of land use For example data from Corine Land Cover Project For example data from Corine Land Cover Project

Land use by Corine Land Cover

The result

Who will do it? The idea of multi branch Project with participation of stakeholders The idea of multi branch Project with participation of stakeholders Geodatabase location – Regional Boards for Water Management Geodatabase location – Regional Boards for Water Management Before, kick off meetings to establish Before, kick off meetings to establish Project definition, Project definition, Team Team Schedule Schedule Budget Budget

No time

No money

To be continued… Flood hazard maps Flood risk maps