Erosion Reduction By Air Entrainment Downstream Of A Stilling Basin By Ted M. Champagne, CEE Dept. Background- The South Florida Water Management District.

Slides:



Advertisements
Similar presentations
Flood Profile Modeling with Split Flows and Weirs
Advertisements

Surface Irrigation.
IMPACT ~ Breach Physical Modelling Review of Modelling Work Undertaken So Far...
Introduction to Long-Throated Flumes and Broad-Crested Weirs
Chapter 13: Momentum Principles in Open-Channel
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
Lower Yellowstone River Diversion Dam Project – Phase II - Physical Modeling of the Rock Ramp BRT, COE, MTAO Update Meeting November 4, 2010.
Watershed Dams in Georgia 1. –357 Total –195 High Hazard (NRCS) –NRCS constructed – owned by local sponsors –Most built between 1950s-1970s for flood.
Blue Lakes Stream Gauge Improvement and Lake Level Stabilization Project: Summary of Dye Tracer Testing City of Twin Falls September 12, 2011.
Grade Control Structures Chris Shrimpton and Jonathan McIntosh CIVE 717 River Mechanics Spring 2012.
Levee Seepage: Concerns, Evaluations, and Solutions Pete Nix, P. E
PHYSICAL MODELING OF BREACH FORMATION Large scale field tests Kjetil Arne Vaskinn, Sweco Gröner Norway.
US Army Corps of Engineers BUILDING STRONG ® Methods for Determining Maximum Flood Elevations Landward of Failed Levees: An Example from the Great Missouri.
Detention / Infiltration Structure. Figure 21–1 Point Discharge and Downstream Stability Analysis Procedure.
Preparing for the Rainy Season SFWMD Operations & Actions.
Eld Polk County Southeast Regional Wellfield. Polk County, Florida  Central Florida (Landlocked)  554 Lakes  Headwaters to Multiple Rivers (Low Volume)
The South Florida Watershed
Assessment of gravel transport characteristics of the upper Santa Ana River Scott Wright and Toby Minear USGS California Water Science Center Sacramento,
Saltwater Barrier: Is it a Restoration Alternative for the Northwest Fork of the Loxahatchee River? Loxahatchee River Management Coordination Council Meeting,
Waller Creek Outlet CFD Modeling Results Connection #2 with 3’ High Spillway Flip Bucket 2-Year Flood (2320 cfs) Lady Bird Lake Inflow (1.25 ft/s) 9/9/20081ALDEN.
Design of Hydraulic Controls & Structures
Drainage System Design and Layout. Design Process Flowchart Background Information (Soils, Topo, Crops) Confirm Outlet Drainage Needed Select DC, Spacing.
Design of Open Channels and Culverts
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Senior Associate Florida Successes of Polymer Enhanced Best Management Practices (PEBMPs) Steven R. Iwinski Environmental Scientist March 16 th, 2007.
One Corps Serving The Army and the Nation Tulsa District The Tulsa District Corps of Engineers and Its Cooperative Partners.
Li-Chuan Chen, Marian Muste, and Larry Weber
Professional Engineering Services For Restoration Project John Mitnik, P.E. Engineering & Construction Bureau Chief Operations, Maintenance & Construction.
STUDY OF THE ROUGHNESS CHARACTERISTICS OF PLANT SPECIES IN CALIFORNIA RIVERS By U.C.Davis J.Amorocho Hydraulics Laboratory.
Abstract Background Conclusion Stream Bed Morphology and Discharge Rates of Deckers Creek Data was collected at 5 different points along a 100 meter transect.
Water Supply Development Mike Kizer OSU Extension Irrigation Specialist.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Three Rivers Levee Improvement Authority (TRLIA) Briefer: Mary Jane Griego, TRLIA Board Member Three Rivers Levee Improvement Authority March, 2007.
VILLAGE OF PATCH, NM, FEASIBILITY STUDY Village of Patch Case Study Seattle Environmen tal Planning Class June, 2009 US Army Corps of Engineers Albuquerque.
The South Florida Region and its Water Management System Linda Lindstrom, P.G. Director Environmental Resource Assessment Department South Florida Water.
Geotechnical Exploration for Reach 2B of the San Joaquin River Restoration Program Nicholas Hightower Division of Engineering, Project Geology 2011 DWR.
U.S. Army Corps of Engineers In partnership with the South Florida Water Management District Water Management in South Florida.
9. Seepage (Das, chapter 8) Sections: All except 8.2, 8.6, 8.7, 8.8, 8.9.
Everglades Land Acquisition Project Carol Ann Wehle SFWMD Executive Director.
Adam Taylor, San Diego Coastkeeper Lab: San Diego Coastkeeper is currently sampling and retrieving data from 10 of San Diego County’s 11 watersheds. Watersheds.
THE HYDROLOGIC CYCLE. The Hydrologic Cycle The Hydrologic Cycle - Fresh Water Storage Reservoir % of Total Fresh Water Glaciers (Frozen)76% Groundwater22%
Hurricanes. Katrina approaching New Orleans August 2005.
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
Overview Presentation for FMA 2007 NATOMAS INTERIOR LEVEE PROTECTION PLAN (NILPP)
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Everglades Land Acquisition Project Michael Sole - Carol Wehle - Dale Brill.
05C112011B Template Master – Update Tracking Number and Date Information Here Update tracking number and date on this slide Template Master – Update Tracking.
Geotechnical Exploration for Reach 2B of the San Joaquin River Restoration Program Nicholas Hightower Division of Engineering, Project Geology 2011 DWR.
US Army Corps of Engineers BUILDING STRONG ® Physical and Numerical Model Study of Montgomery Locks and Dam, Ohio River Allen Hammack, Howard Park, Cecil.
Libby Dam June 2006 Spill: Total Dissolved Gas Monitoring.
School of Civil Engineering/Linton School of Computing, Information Technology & Engineering 1 CE 3205 Water and Environmental Engineering Stilling Basins.
Expected Long Term Site Evolution of Alameda Creek and former Salt Ponds following Tidal Marsh Restoration Matt Wickland Philip.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
MS Dam Safety Program Dusty Myers, P.E. Chief, Dam Safety Division.
Lesson Understanding Soil Drainage Systems. Interest Approach Ask students the question, “What determines how fast water will flow through a funnel?”
Susan Sylvester Department Director Operations Control Department Mechanics of the Primary Water Management System.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
Wanapum Dam Total Dissolved Gas Characterization Evaluation of the Wanapum Dam Fish Bypass (WFB) 2008.
LO – To understand the changes in river process with distance from source - To understand Long and Cross Profiles of a river.
RESEARCH AND DEMONSTRATION CENTER ON-LOT SYSTEMS AND SMALL FLOW TECHNOLOGIES DELAWARE VALLEY COLLEGE DOYLESTOWN, PA Project Funding Provided by: Pennsylvania.
STA 2 Expansion Project Conceptual Plan for Cell 4 STA 2 Expansion Project Conceptual Plan for Cell 4 Long-term Plan Communications Meeting November 18,
Bridges Reach analysis Fundamental tool for design
Assoc. Prof. Dr. Tarkan Erdik
Effects of persistent drought on Lake Mead and the Las Vegas Valley
Key Issues How do geographers describe where things are? Why is each point on Earth unique? Why are different places similar? Why are some human actions.
IRRIGATION PRINCIPLES
Florida’s Landforms 6th Grade Science Mr. Addeo
REGULATION WORK UNIT – 10 LECTURER IN CIVIL ENGG. GP MEHAM SANDEEP.
Cannery Park Project Public Hearing
Presentation transcript:

Erosion Reduction By Air Entrainment Downstream Of A Stilling Basin By Ted M. Champagne, CEE Dept. Background- The South Florida Water Management District is Florida’s largest water management district. The agency operates and maintains 2,600 miles of canals and levees, 63 pumping facilities, and 1,300 water control structures. They are committed to improving flood control and securing a water supply for the 7.5 million residents in its jurisdiction. The agency is also dedicated to improving water quality and restoring ecosystems in areas such as the Southern and Northern Everglades. Problem- Water control structure S65E is a gated weir stilling basin located approximately 10 miles Northwest of Lake Okeechobee on the Kissimmee River in Glades County. The area surrounding S65E is largely agricultural. There is a residential neighborhood within 200 ft of S65E consisting of about 125 homes. The structure is SFWMD’s largest measuring over 180 feet wide. During maintenance, significant erosion was discovered near the structure. A large scour hole approximately 26 feet below the floor of the stilling basin had formed downstream of the structure. If the scour hole were left unchecked, it could lead to structure failure due to undermining the foundation. Acknowledgements- Thanks to the South Florida Water Management District for funding this research project and to my advisor Dr. Brian Barkdoll for his guidance. Future work- Although scour reduction via air injection was proven conceptually, further research is required in order to define its true potential. Future work will investigate the effectiveness of various diffuser material, geometry, and orientation. The goal is minimize bed scour while using the smallest amount of air. This will reduce the operational costs of air injection to be inline with the cost of routine bed maintenance. Concept- Air injection near the end sill is being considered as a means of scour reduction. The water flume in Dillman 110 was used to model its effectiveness. A diffuser pipe was positioned downstream of the model structure near the end sill. Holes were drilled into the pipe so that the air would be injected upwards, perpendicular to water leaving the stilling basin. A section of uniformly graded fine sand was placed downstream from the stilling basin. This section will erode during the experiment run and is expected to behave similar to the bed at the actual structure. Experiments were ran with and without air using various headwater and tailwater configurations in an effort to investigate typical operation conditions. Experiments were ran until bed scour stabilized. Data Collection- Scour was measured periodically for the entire time to reach equilibrium with the depth function of a Nortek Vectrino Acoustic Doppler Velocimeter at ten-hertz intervals. These data were then filtered by eliminating erroneous data identified visually and also by eliminating data which failed to satisfy minimum quality criteria. For ease of plotting and data analysis, the filtered data were then averaged in two- minute bins for presentation. Flow was run until sufficient time had elapsed for equilibrium scour conditions to occur, as determined by there being a change in scour depth over a 2-hr period of less than 0.5 percent, after which water surface and bed profile measurements were taken. Water surface plots revealed that air injection did not reduce the conveyance of the structure. Bed elevations were collected on a uniform grid using point gauges. wrac_arc_rpt_lok/tab /lo_structures_emerg_action.pdf S65E during high flow conditions Results- Pictures show the model flume during operation Subsequent bed profile downstream of model structure. Collected after scour equilibrium is established. With Air Injection (25cfm)No Air With Air Injection (25cfm) Sustainability- Because of the size of S65E, it was deemed cost prohibitive to make changes to the structure to prevent continued bed erosion. The environmental impact caused by demolition and construction of a new structure could be avoided through the use of innovative scour reducing techniques. A “bubble curtain” positioned downstream of the structure was proposed to reduce erosion potential. The effectiveness of this concept will be established on a model flume. Abstract- The South Florida Water Management District (SFWMD) manages and operates various water control structures that are subject to scour. In an effort to reduce scour downstream of these gated structures, laboratory experiments were performed to investigate the effect of a bubble curtain introduced downstream of the terminal structure of a gated spillway on the depth of the scour hole. Experiments were performed in a laboratory channel consisting of a 1:30 scale model of the SFWMD S65E spillway structure. Experiments were conducted without air entrainment and for high, medium, and low air entrainment rates for high and low headwater conditions. For the cases with no air entrainment it was found that there was excessive scour downstream of the structure due to a downward roller formed upon exiting the downstream sill of the stilling basin. When air was introduced vertically just downstream of, and at the same level as, the stilling basin sill it was found that air entrainment does reduce scour depth depending on the air flow rate by up to 58%, but shifts the deepest scour location to the sides of the channel bed instead of the center. Future work will focus on identifying diffuser geometry that minimizes the air required to reduce bed scour. Conclusion- It was evident that experimental runs with a high headwater to tailwater ratio resulted in the worst bed erosion. A 58% reduction in erosion was achieved in this case by utilizing air entrainment at a rate of 25 cfs. Although scour depth is not directly scalable between model and prototype due to cohesion of small particles, the scour depths found in the model show significant depths comparable qualitatively to those found in the SFWMD S65E spillway structure, thereby providing confidence in the proposed concept and laboratory setup.