Plan for Jan. to Mar. Dec. 11, 2005 M. Komatsu. Current status We have no manpower after end of Dec. –Nonoyama should finish his master thesis. New Muon.

Slides:



Advertisements
Similar presentations
1 Status report of the PEANUT analysis Giovanni De Lellis Collaboration Meeting, June 5th 2007, Maiori.
Advertisements

Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
PEANUT 2nd RUN proposal Oct. 12, 2006 M. Komatsu.
MICO Alain Blondel 17 March MICO Alain Blondel 17 March MICE target test-run March 2008 Friday 14/03/2008 6:00-> 18:00 Saturday 15/03/2008.
SFT status 12/11/05 PEANUT Y.Nonoyama.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
Status Report on OPERA Emulsion Nakamura M. Nagoya 2006,Dec.7.
NC like event location 9 th /Dec/2006 OPERA Emulsion Work Shop T. Fukuda, K. Morishima, N. Nagoya univ.
BL007, BL039 and BL040 PL01-PL02 Scanning Result K. Narita Nagoya University Dec PEANUT meeting.
PEANUT meeting Fermilab Giovanni and Komatsu 23/Jan./2007.
PEANUT exposure summary and brick distribution and Situation of PEANUT analysis Fermilab.
Agricultural Faculty Bd. of AGU - Concept Drawings Handong graduate school.
Status report from Swiss labs Ciro Pistillo LHEP Bern University Opera Emulsion Workshop Nagoya December 7 / 9.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Research History of Tsutomu FUKUDA Tono-Refresh facility Facility construction Mass production shift leader Refreshing control Sensitivity.
Trevor Hedman Kendall Hill. Assumptions:  Outside wall is exposed to convection due to wind.  Convection is approximated by flow over a flat plate.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
MCTF C. Johnstone All Exp. Meeting 14 Mar First Beam to Muon Test Area Description and commissioning of beam to MTA Experimental Hall C. Johnstone,
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
BY: QUANISHA BRUCE DATE: 23 RD MARCH 2014 BLOCK: 1 ST Engineering Problems.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
E.C. Aschenauer RSC-Meeting, January 21st T h e b e s t k e p t s e c r e t n u m b e r a t R H I C / B N L / U S A f o r s u r e n o t t o b e.
Project Status Update Mark Petree LCLS Self Seeding Status: Management put it on hold. – Preliminary conceptual design completed – Interference.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
L6_2. Learning Systems in Java. References 1.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 17, 2011.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
Event Location Rehearsal in PEANUT Bricks OPERA collaboration meeting Gran Sasso, May 2006 Kodama, Sato, Fukuda, Komatsu, Narita, Nonoyama NAGOYA.
01/08/2009 AS-TAGL Mtg Global Design Effort 1 CesrTA Update Mark Palmer CLASSE.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
AFFORDABLE HOUSING & MUCH MORE
17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 Radiation test of PL500 in TCC2 Conclusion from last test in Louvain –All DCDC converters ran.
Director’s Review Dec 1999 DO Timeline Old Version J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
 This is the topic sentence of your paper.  What is the point you are trying to prove?
St Chad’s Catholic Primary School. January 2004 St Chad’s Catholic Primary School Phase Two new junior classrooms added.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Bubble Chamber Schedule – 2017
SRI LANKA FREIGHT FORWARDERS ASSOCIATION
News and brief overview of Beamline plans for the next few months
Soldering Process < 50 mm Solder Wire Holding Technique
HRS at small angles for e+/ e- pair for APEX
Status of CO2 Cooling tests at CERN for Pixel phase 1
LCLS Injector Commissioning Dates ( )
مديريت موثر جلسات Running a Meeting that Works
Beam dump for J-Parc neutrino facility
Cleveland Rowing Foundation
T2K Run8 MUMON Summary.
UKL Future Release 3 XRN4534 – Amendment to RGMA validation rules for asset install date Deployment Options – 9th January 2019 Update.
Sep Oct Nov Dec Jan Feb Mar Apr May

Mowrey Hall Renovation
26 Oct 2017 – May 2019 Well water level monitoring data
Presentation transcript:

Plan for Jan. to Mar. Dec. 11, 2005 M. Komatsu

Current status We have no manpower after end of Dec. –Nonoyama should finish his master thesis. New Muon Lab? –When we should move to somewhere? –Can we stay there? Beam is on up to March –There is no reason to make PEANUT empty.

Possible option 1. Keep bricks fully installed into wall –We develop bricks after NuMI shutdown. –fading? 2. Change configuration for “SFT only” run –First wall will be filled with iron brick(3X0) –2,3 and 4 th wall, install 1.5 to 2 X0 radiator Decision 1 st wall filled with lead bricks and 3 rd wall filled with iron brick.

Fading data