Joint and Conflat Leakage, March 2007 Tests P. Titus, MIT (Mar. 7,2007) Problems/Observations: “Large” LN2 Leaks were evident - but Mercury tests were.

Slides:



Advertisements
Similar presentations
HVAC523 Soldering.
Advertisements

Key HVAC Design Concepts. Agenda Discuss relevance of thermal enclosure system to HVAC system. Present the three major steps to design an HVAC system.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
A. Perin, CERN, TE-CRG, 26 May Review of the cryogenic by-pass for the LHC DS collimators 26 May 2011 Modifications to the DFBs, DSLC and cryogenic.
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
CERN P186 Magnet cryogenic system update Yury Ivanyushenkov RAL December 7, 2004.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
1 New baseline for the magnet cooling system Yury Ivanyushenkov Engineering and Instrumentation Department, Rutherford Appleton Laboratory.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Brad Moore M.S. Student Room: Hometown: Rochester, MN Thesis: Development of a Passive Check Valve for Cryogenic Applications.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Product Design and Qualification (Validation) Testing for HPHT Systems
Hydronic Mechanical Controls
New HV test specification for the LHC N. Catalan for the EI section.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
CRYOGENICS AND POWERING
7/17/02Reyco Henning -- TRD Box S Component Testing 1 TRD Box S Solenoid Valve Testing AMS TRD Meeting, CERN, July 2002 U. Becker, G. Carosi, R. Henning,
Coil Cooling Workshop Summary June 10, Electrical Isolation: Cladding is isolated from the T by Kapton. The chill plates electrically connect at.
MTA Cryogenics: Where We Are The Work of Fermilab AD/Cryo Barry Norris, Christine Darve and a host of wonderfully talented Cryogenic Personnel John Thompson,
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Presenter Date Page 1 October 30, 2006 Pre-decisional. Internal Use Only Design Overview Ground Side Flight Side Interface Seal GH 2 Vent Disconnect.
Evaporative Emissions Control Systems (EVAP)
ISTITUTO NAZIONALE DI FISICA NUCLEARE SEZIONE DI MILANO LABORATORIO ACCELERATORI E SUPERCONDUTTIVITA’ APPLICATA Magnet Test LASA, INFN-Milano.
M. Karppinen TE-MSC-ML on behalf of S. Atieh, P. Cruikshank, M. Duret, J-C. Perez, V. Parma, T. Renaglia, S107, S108, Dubna teams Pressure relief valve.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Lab Safety: Physical and Chemical Hazard Y.Khosravi
M. Gilchriese Thermal Shock. M. Gilchriese 2 Thermal Shock - Sector 9 Use liquid nitrogen vapor to cool sector rapidly. Setup is just dewar, valve and.
To TT10 Nitrogen or helium gas LN2 Storage vessel buffer storage vessel G1G2 Magnet cryostat VALVE BOX Schematic diagram of the cryogenic system.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Installation of the T600 at Fermilab CSN2, September 22,
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
P.Barclay CLRC1 SCT HEX PRR ( ) Design and qualification of fittings and filters l Background comments: »Space and assembly constraints prevent us.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
3 June 09P. Tropea1 Cooling system acceptance Define a common set of acceptance criteria for cooling system commissioning Write the testing procedures.
ILC Cryogenic System Shallow versus Deep Tunnel Tom Peterson Dubna Meeting 5 June 2008.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
LBNF Cryo + Detector schedule Filling scenarios (Cryostats #1 and #2) Mohammed Elrafih, Elaine McCluskey, David Montanari, Marzio Nessi, Bob O’Sullivan.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
FCC Refrigeration cost vs magnet temperature Laurent Tavian CERN, ATS-DO 15 February 2016.
Teleconf ACS – FREIA 28th March 2017
Installation of the T600 at Fermilab
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973
Task 5: High-Tc superconducting link Summary of work-package
Magnet cryogenic system update.
Ti/SS transitions A.Basti INFN-PISA*
Module Loading Task Force Meeting October 21, 2004
Update on HW commissioning
Consequences of warming-up a sector above 80 K
(vertical cryostat, Gersemi)
Test box for ProtoDUNE SP – Integration Test
Mathew C. Wright October 2016
משרד התעשייה, המסחר והתעסוקה פעולות המשרד לעידוד מגזר המיעוטים
Joint and Conflat Leakage, March 2007 Tests
Common Requirements Taps and Valves.
Schematic diagram of the cryogenic system
Hardware Commissioning
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

Joint and Conflat Leakage, March 2007 Tests P. Titus, MIT (Mar. 7,2007) Problems/Observations: “Large” LN2 Leaks were evident - but Mercury tests were not impacted. One major leak was from the LN2 feed closure valve that was “found equipment” Cobbled together cryogenic system does not represent the CERN magnet deliverables. Terminal seals leaked. “Quick Fill” affected Conflat seal. Leaks were detected from the center terminal assembly.

Joint and Conflat Leakage, March 2007 Tests During March tests last year there was a small leak in one of the terminals. Another “washer” of silicon rubber was added. This was compressed at RT and did not leak during March 2007 tests. LN2 Dunk Test: Feb The gland for the power lead did not shatter – but it was rigid.

Proposed Remedial Actions: Further qualify gland material and tightening procedure in a small test fixture/tank. Check existing and alternative materials, RT vs. cold compression, cycling reliability, Conflat thermal shock. Implement any needed improvements in magnet, at CERN. Stick to the Slow cool from RT and 80K to 110K cycling. Avoid fast cooldowns from above 140K MIT to Pressurize Magnet to 100 psi cold and 250 psi at RT (Duplicate CVIP qualification) Acceptance based on holding pressure over time.

Proposed CERN Acceptance Use dependant on acceptance of small tank qualification. Duplicate RT 250 psi Pressure test above ground. Acceptance based on time to hold pressure (TBD). Quantify Acceptable leak rate based on tunnel Specs HVAC etc. – This experiment should not be held to the same reliability standards as dipoles. Do pressure test in tunnel at temperature and with as high a pressure as the CERN cryo sytem can provide – Up to 250 psi, before N2 activation issues. Acceptance based on no visible LN2 leaks, and time to hold pressure as determined from tunnel requirements.