Initial rough Background comparisons between Run5 and Run 4 Guy Wormser LAL Orsay.

Slides:



Advertisements
Similar presentations
Dec/02/04 Su DongCaltech Trigger/DAQ/Online workshop1 Level 1 Trigger: Introduction L1 trigger objects and strategy Implementation features L1 composition.
Advertisements

IP angle scan Results Martin Simard Silke Nelson Mike Kelsey.
Comparison and Contrast
June 28, 2004 BBBTF Steven H. Robertson McGill University, Institute of Particle Physics 1 Beam Background Simulation with B A B AR with B A B AR June.
W. KozaneckiMDI meeting, 5 May 06 Slide 1 Online DCH background analysis  Compare on-line DCH background ratio to Martin's offline analysis  Can we identify.
2E34 Meeting and MCC News IR2 Vacuum Studies (Mike Sullivan) Plans for Lattice and Optics Work (Yunhai Cai)
LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,
W. KozaneckiMCC AP meeting, 8 Mar 07  MD goals  Experimental procedure  HER-only x & y scans + high-current extrapolation  [LER only X & y scans +
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
Guy Wormser, Super B-Factory Workshop, Jan 04 1 BELLE/BABAR present background situation zThe information from BELLE:
Rad. Bhabha: generator level April 9 LAL, Orsay P. Roudeau, A. Stocchi HER, min. rad. 30 MeV  =352 mb For Erad >10% Ebeam  =109 mb « large angles »(>100.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
W. KozaneckiMD planning meeting, 20 Jan 04 Background characterization strategy  MD goals  Background sources  Operational procedures  Open questions.
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
W. KozaneckiMDI meeting, 19 Mar 04 Separating the luminosity background from the non-colliding beam-gas contribution  Principle  the problem  the beam-gas.
Parasitic parametrization of LER, HER and Lumi sensitivty in Trickle injection mode Very simple idea: use the very different variation with time of HER.
IR2 Vacuum Status M. Sullivan for S. Ecklund, A Fisher, S. Novokhatski, F-J Decker, A. Kulikov, S. DeBarger, U. Wienands, S. Gierman, M. Petree, many BaBarians.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
HER, Rad. Bhabha in Turtle Sept. 17 LAL, Orsay P. Roudeau, A. Stocchi Some trajectories (include charged and neutrals) 
M. WeaverPEP-II MAC Review,15-17 Nov’07  Operational issues  radiation aborts  background monitoring  Background extrapolations  model comparisons.
Topics from this weeks 2E34 meeting M. Weaver Jan 6, 2006.
MDI meeting, Nov First look at Transient Recorder data Livio Piemontese Stan Ecklund and Mark Petree have installed – in the IR2 alcove – a 32.
W. KozaneckiMDI meeting, 16 Jan 2004 BaBar-wide Background monitoring  Motivation  institutionalize...  through a weekly report to PEP-II/BBR meeting.
IR 2 Vacuum Update M. Sullivan for PEP-II team For the 2e34 meeting of Feb. 15, 2006.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
W. KozaneckiMDI meeting, 9 Mar 07  MD goals  Experimental procedure  HER-only x & y scans + high-current extrapolation  [LER only X & y scans] + high-current.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.
Trickle Injection Overview Background Injection is necessary to refill beam “buckets” which have lost charge. A particular bucket is targeted for each.
IR vacuum M. Sullivan PEP-II meeting Feb. 22, 2007.
6 - 1 Module 5: Bar Chart This module focuses on the bar chart, one of the more common types of graph used in public health. Reviewed 15 April 05 /MODULE.
13 Dec MAC Review – Future IR Heating Issues 1 Future IR Heating Issues 13 December 2004 Stan Ecklund.
Run 8 Polarization measurements from STAR BBC Andrew Gordon September 12, 2008.
Parameter studies of the e - cloud build up (update) C.Octavio Domínguez, Frank Zimmermann 28 th April e - cloud meeting.
Kalanand Mishra Kaon Neural Net 1 Retraining Kaon Neural Net Kalanand Mishra University of Cincinnati.
Quantifying Population Extinction and Examining the Effects of Different Mutation Rates Jason Stredwick Farshad Samimi Wei Huang Matt Luciw Matthew Rupp.
What is randomization and how does it solve the causality problem? 2.3.
GEANT4-BASED SIMULATION STUDY OF PEP-II BEAM BACKGROUNDS IN THE BABAR DETECTOR AT THE SLAC B-FACTORY W. S. Lockman, SCIPP, University of California, Santa.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
HLA WFPC2 Source List Photometric Quality Checks Version: August 25, 2008 Brad Whitmore 1.Introduction 2.Comparison with Ground-based Stetson Photometry.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
Color in Web Design. Overview: Color Topics Myths & Misconceptions Hexadecimal Notation Color Concepts and Issues.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
M. WeaverB-Factory Operations Review April 24, 2006 BaBar Backgrounds Matt Weaver B-Factory Operations Review April 24, 2006.
William Lockman UC Santa Cruz May 6, 2005MDI meeting G4 simulation: status and validation strategy Goals Contributors Status Needed plots Future tasks.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
1 Bunch length measurement with BaBar SVT B. VIAUD B. VIAUD Université de Montréal Université de Montréal.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
BELLE-BABAR template Guy Wormser LAL Orsay. Completing the template Very good response to my extra requests: thanks to everydoby! Now we can make direct.
5/9/081 CP WG γ from trees meeting Guy Wilkinson, 2/4/09.
M. Sullivan Apr 27, 2017 MDI meeting
John T. Seeman DOE PEP-II Operations Review April 26, 2006
SuperB Injection, RF stations, Vibration and Operations
C.Octavio Domínguez, Frank Zimmermann
Machine Background Status & issues in BaBar/PEP-II
Top-Up Injection for PEP-II and Applications to a Higgs Factory
Weekend Summary Squirted N2 at 3027 under various conditions
A.Kulikov SLAC MAC review October 2003
©G Dear 2009 – Not to be sold/Free to use
RPC and LST at High Luminosity
PEP-II Status and Plans e+e- Factories Workshop
Trickle Background Investigation
Trigger Background Experience & Predictions
Accelerator R&D Results from the B-factory
Vacuum status at KEKB Junji Haba.
DIRC Background Status
Long term projections summary
To Do list, open items as of 10-Feb \ Study threshold dependence on bunch length (Just changed Vrf to 4.5.
Background characterization: MD plan
Presentation transcript:

Initial rough Background comparisons between Run5 and Run 4 Guy Wormser LAL Orsay

Samples Run5 : April 17 0h00 to April 19, 8h00 unless specified otherwise –First good shifts (100 pb-1) –L>3 10**33 –Mostly 4 packet bunch spacing Run 4 random choice July 17/July 19 : typical high lumi smooth running

Sample characteristics Black LER Red HER Green Lumi Run 5 April 17/19Run 4 July 17/19

Pumps reponse LER VP2045 Red 2005 Black 2004 LER current nTorr Factor still 1.5 to go

More LER IR2 Pumps VP2074 VP2144 VP2097 VP2176

More LER pumps VP3054 VP3115 VP3131 VP3075

More LER pumps

HER pumps

Background in BABAR subdetectors DCH DRC Vs HER DCH Vs LUMI DRC Vs LUMI Vs LER

Forward neutron

SVTMid FW TRG

Last minute update up to April 22 0h00 2 bunch spacing VP2045 VP2074

Conclusions HER vacuum almost similar to Run4 LER vacuum situation is contrasted from pump to pump. DCH, DRC background levels similar to Run4 although currents and lumi are lower SVT background somewhat higher than Run4 Neutron background scales as in Run4