Kranjska Gora, 19.-20.04.2004 1 Installation – plan, delivery -PI installation on Slovenian Railways’ wagons: -3 Uacs -2 Himrrs -Delivery of OBTs and loading.

Slides:



Advertisements
Similar presentations
F-MAN OBT comms Status report Challenges, Issues …
Advertisements

GOODSON Tools and Supplies for Engine Builders Calibrating and Maintaining Your Precision Machinists Level.
D11.2 – The Story Each test operator will test the system in different corridors in Europe. CP use one corridor, PI use another corridor, SIGMA has got.
REMOVE AND INSTALL THERMOSTAT AND TEST OPERATION CS4 A.1 D.6 P-5/6.
( 1 ) PROCEDURE FOR FLAT HEAT PRESS OPERATION PROCEDURE FOR MULTI FUNCTION HEAT PRESS MACHINE.
January 7, 2013 Changing or replacing G460 sensors Slide 1 November 9, 2012 Changing or replacing G460 sensors.
5.8 Project Management Chapter 37 HL - Only.
POWDER PUFF AUTO’S Beginners’ Automotive Training for Moms.
QUALITY ASSURANCE Work Load. Workload is the sum of the work achieved or to be achieved, obtained by multiplying the raw count of each individual procedure.
Crete Meeting April 10 th – 11 st, 2003 WP3 Sciro Presentation.
Kranjska Gora, Test plan - PI will test F-MAN tools on: - 2 types of wagons (Uacs, Himrrs) - 2 types of operation (timetable supervision.
CS 5540 HCI Final Project Designing a Special Needs HCI Hyoungsuk Kong
TP4-ENERSOL-TD/PV double function
Training Presentation This presentation is meant for end users of the ZERO Plan program. The Training will include: Overview of the ZERO Plan process and.
Assembly of Conductivity Flow Loop EAS 199B living with the lab (in preparation for calibrating conductivity sensor)
Chapter 2.1 Program Design and Documentation. Summary System/Program specifications System/Program design –Top-down & Bottom-up design –Object Oriented.
Presented by: Contra Costa County In-Home Supportive Services IHSS Public Authority.
1 On Board Terminal  Technical characteristics  Functions  Messages  SIM requirements  Sensors for OBT  Installation.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Presentation by SNCF in 19/20 April 2004 Meeting in Kranjska.
1CUL.PPT Last Revised: 10 June 2003 The Role of the Communications Unit Leader Developed as part of the National Emergency Services Curriculum Project.
Welcome to TDTIMS Bonnie. TDTIMS is Changing  In the past we have focused most on SAFETY & EFFICIENCY.
Balancer Operation Intelift Operation Installation Troubleshooting Preventive Maintenance Preventive Maintenance OVERVIEW.
1.CLEANER 25 hours per week (daily 4.30pm pm) Duties will include: Cleaning with key holder responsibilities Grade G1.2 £7.00 per hour 52 weeks per.
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
MicroMet Cutting Edge Technology Defence Systems Division.
Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.
Fred Doherty Module Work Fred Doherty. Stave Module Building Hybrid Bonding Bonding table for the BJ820 still in workshop Modified working height of the.
Brain Software. Things you need Administrator Rights Know how to open a folder Know how to unzip a file??? Know any special changes your IT department.
NEW ON CALL PROCEDURES. Today's Session  Pay Protection.  Staff Attendance.  Percentages Payable.  Rates.  Example of a weekly shift.  Example spreadsheet.
Who am I? Create a character profile for this person.
Decimals Day 2 Multiply and Divide Decimals. DO NOT line up decimals Multiply with first number, then continue with next number Place decimal point in.
F-MAN Kranjska Gora, 19th - 20th April RIV CHANGES Most probably that with 1st of January 2005 the “old” RIV expires.
ALICE TC Meeting – CV Detcool1 LHC stop 31 May, 1-2 June – CV/DETCOOL Interventions Cavern interventions: 31 9:15: Sampling with RP.
TIDVG2014 PRODUCTION AND INSTALLATION STATUS 23/07/2014 – “TIDVG Follow-up Meeting” Ivo Leitão.
Lisbon, Report on OBT installations -50 OBTs and sensors to be installed on wagons: - 35 CP (sggmrss – flat wagon with 102 ton cargo capacity)
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
In the Garage Martin, Hans! It´s time to help me. We must prepare our car for trip. We needn´t repair it. The car is in good condition, but we have to.
How To: Replace an LTR- 450R Suzuki Fuel Filter By Goigen (#11)
Shaft Replacement Standard Operating Procedure
Rear end assembly.
PostBase Automatic Feeder Component Removal Service Training
Quick Installation – 1/4 Pressure Sensor
Cost-Benefit Analysis
Bilge Pump Service Project Model Service Kit
Reporting The Northern Beauty Barents visual arts in
Injector De-cabling Project
Much Woolton Catholic Primary
Cover-Gear Box assembly
Very preliminary draft
All Sky Camera workshop
Status of straw production straw module assembling
Infrastructure Readiness Training January, 2017
Disassembly and Assembly of A07A-W1/W2 Electronic Governor Actuator for AD Fuel Injection Pump
ChangShun Packing Manufacturer Limited
User instrument policy
The Virtual Stockroom Rev. 02/03/16.
GLAST Large Area Telescope:
½”-10”.
The Role of the Communications Unit Leader
General information and lab rules
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
JIR-The mail comes to main street(JYBOOKS.COM)
Trinity Mexico Boring Bar Repair Report
A Pneumatic Device to make modules assembly easier (faster ?)
Tour - session 9 Work Order Release and Production Activity Control
Much Woolton Catholic Primary
A Good Detective
Presentation transcript:

Kranjska Gora, Installation – plan, delivery -PI installation on Slovenian Railways’ wagons: -3 Uacs -2 Himrrs -Delivery of OBTs and loading sensors: : Mr. Spengler from Transportdata; 4 OBTs, 2 loading sensors (V.2 – flat sensor nuts) : mail consignment from EDC; 1 OBT, 3 loading sensors (V.1 – inclined sensor nuts) -Installation site: railway workshop in Divaca -Start of installation – 17. and – under TD supervision

Kranjska Gora, Divaca – installation site

Kranjska Gora, installation started at 9:30 a.m. on Uacs physical assembly finished until 1:00 p.m. -Mr. Spengler started initialisation with Mr. Lissner from TD -PI started the initialisation with EDC (M. De Vos) -Result: Geo-coordinates were OK, loading sensor (V.2): arbitrary values -Technicians shifted loading sensor housing 3 times, loosening screws,...; initialisation procedure has been repeated... -End of the day (6:30 p.m.): - OBT functioning well - loading sensor (V.2) is bad

Kranjska Gora, Uacs – tank wagon OBT assembly

Kranjska Gora, Loading sensor location on Uacs

Kranjska Gora, Loading sensor V.2 - without housing

Kranjska Gora, Notice from Mr. Spengler – the mounted loading sensor V.2 gave good results during the night! -Workshop staff prepared a special tool to centre a loading sensor -Setup of a worktable to test loading sensor functioning -Finished installation on and until 2:00 p.m. -Wagon equipment on successfully installed, initialised and calibrated (loading sensor V.1) -Loading sensor (V.2) on doesn’t work – proved by Mr. Spengler -Mr. Spengler takes both V.2 loading sensors (bad) back to TD -Result: one finished wagon, two wagons without loading sensors

Kranjska Gora, A tool to centre a loading sensor holder

Kranjska Gora, Worktable to test loading sensor functioning

Kranjska Gora, OBT and loading sensor assembly on Himrrs wagon

Kranjska Gora, Location of OBT on Himrrs wagon

Kranjska Gora, Location of a loading sensor on Himrrs

Kranjska Gora, Test of functioning of loading sensor V.2

Kranjska Gora, Loosening of the nut on the loading sensor V.2

Kranjska Gora, Further installations : receipt of the two tested spare loading sensors V.2 form TD -Installation of the 2 left OBT packets: : wagon (loading sensor V.1) initialised and calibrated successfully : wagon (loading sensor V.1) initialised and calibrated successfully : replacement with the tested spare loading sensor V.2 on The same problems with loading sensor – not functioning

Kranjska Gora, Current state of OBT installation -3 wagons (2 Uacs, 1 Himrrs) are complete – all loading sensors V.1 -1 wagon (Uacs): physical assembly is finished – loading sensor doesn’t function (V.2) -1 wagon (Himrrs): physical installation is finished – only loading sensor holder – inoperable sensor in a warehouse (V.2) -Conclusions: - loading sensors V.2 don’t function well - letter of claim for 2 new sensors has been sent to TD - owing to bad loading sensors PI has incurred additional costs for installation personnel and travel to the installation site, SZ need to suspend the wagons from regular business run on the corridor - PI paid to Logosystem 1st instalment – EURO (27%)