Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.

Slides:



Advertisements
Similar presentations
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Advertisements

JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Plan ahead for the GDE Barry Barish ILC Consultations URA, Washington DC 12-May-05.
Strategies for Future Acclerators Barry Barish Elba 23-May-06.
The International Linear Collider Barry Barish Caltech 5-Jan-06.
5 May 06 SLAC SPC 1 ILC Global Activities GDE, FALC Barry Barish GDE Caltech.
20 April 06 P5 - SLAC Global Design Effort 1 ILC Update from the GDE Barry Barish GDE Caltech.
The Path Toward a Linear Collider Barry Barish HEP 2005 Lisbon, Portugal 23-July-05.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
Technology Breakthroughs and International Linear Collider Barry Barish AAAS Annual Meeting Washington DC 19-Feb-05.
Conventional Source for ILC (300Hz Linac scheme and the cost) Junji Urakawa, KEK LCWS2012 Contents : 0. Short review of 300Hz conventional positron source.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
The Linear Collider – accelerator design A particle beam accelerator is a microscope – the resolution is inversely proportional to the energy of the beams.
22-May-06 FALC - Rome Global Design Effort 1 Report on Progress of the GDE Barry Barish GDE.
6-7 April 06 MAC Review Global Design Effort 1 BCD Overview Process and Highlights Barry Barish GDE Caltech.
Proposed machine parameters Andrei Seryi July 23, 2010.
Low Emittance RF Gun Developments for PAL-XFEL
Compton based Polarized Positrons Source for ILC V. Yakimenko Brookhaven National Laboratory September 12, 2006 RuPAC 2006, Novosibirsk.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
Discussion for Keep Alive Source /Auxiliary Positron Source KURIKI Masao Hiroshima U. /KEK 10/25/2011 ILC Technical Baseline Review, 2011, DESY 1.
8 May 06 ILCSC Report Global Design Effort 1 GDE R&D Program RDR Status and Plans Barry Barish GDE Caltech.
Global Design Effort 22 March 2007 Tor Raubenheimer1 ILC Machine Overview and Critical R&D ALCPG Meeting Tor Raubenheimer.
WG3a Sources Summary Jim Clarke on behalf of John Sheppard, Masao Kuriki, Philippe Piot and all the contributors to WG3a.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
On the Way to ILC Shekhar Mishra Fermilab Talk presented on behalf of ILC-GDE 2/16/06 Talk Presented at the 2006 Aspen Winter Conference: "Particle Physics.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
GDE questions, including one or two IRs Grahame Blair, Tomo Sanuki, Andrei Seryi for WG4 Snowmass, CO, August 25, 2005 Grahame Blair, Tomo Sanuki, Andrei.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
9/24-26/07 e- KOM Slide 1/20 ILC Polarized e- source RDR Overview A. Brachmann.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
ParameterL-bandS-bandX-band Length (m) Aperture 2a (mm) Gradient (Unloaded/Loaded) (MV/m)17/1328/2250/40 Power/structure (MW) Beam.
ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October
International Linear Collider Technology: Status and Challenges Steve Holmes Fermilab Wine & Cheese Seminar September 24, 2004.
An Overview of the ILC Cryogenic System Tom Peterson, Fermilab LCFOA at SLAC 1 May 2006.
Undulator based polarized positron source for Circular electron-positron colliders Wei Gai Tsinghua University/ANL a seminar for IHEP, 4/8/2015.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
ILC Global Design Effort Barry Barish GDE 9-March-06.
6-7 April 06 MAC Review Global Design Effort 1 The Baseline Configuration Tor Raubenheimer GDE SLAC.
@ Fermilab ILC bunch-compressor and linac rf requirements Sergei Nagaitsev Fermilab Feb. 9, 2006.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
1-2 May 2006 LCFOA Mtg Global Design Effort 1 The Baseline Configuration and the Reference Design Report Tor Raubenheimer SLAC.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
Conventional source developments (300Hz Linac scheme and the cost, Part-II) Junji Urakawa, KEK PosiPol-2012 at DESY Zeuthen Contents : 0. Short review.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
ILC - Upgrades Nick Walker – 100th meeting
Summary of WG2 :CFS for staging
Status and Plan of GDE Design Work (Including Road Map for RDR)
Cost Comparison of Undulator and e-Driven Systems
ILC Global Design Effort
Barry Barish GDE Caltech
Electron Source Configuration
Nick Walker (DESY) EU GDE Meeting Oxford
Status of the CLIC Injector studies
A. Brachmann and J. C. Sheppard SLAC April 4, 2006
LCLS Commissioning Parameters
Advanced Research Electron Accelerator Laboratory
K. Yokoya KEK For RDR Management Board
SuperB Workshop Frascati March 16, 2006
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06

ILCSC2 The Key Decisions Critical choices: luminosity parameters & gradient

9-Feb-06ILCSC3 Making Choices – The Tradeoffs Many decisions are interrelated and require input from several WG/GG groups

9-Feb-06ILCSC4 The Baseline Machine (500GeV) not to scale ~30 km e+ 150 GeV (~1.2km) x2 R = 955m E = 5 GeV RTML ~1.6km ML ~10km (G = 31.5MV/m) 20mr 2mr BDS 5km

9-Feb-06ILCSC5 Parametric Approach A working space - optimize machine for cost/performance

9-Feb-06ILCSC6 Electron Source Positron-style room- temperature accelerating section diagnostics section standard ILC SCRF modules sub-harmonic bunchers + solenoids laser E= MeV DC Guns incorporating photocathode illuminated by a Ti: Sapphire drive laser. Long electron microbunches (~2 ns) are bunched in a bunching section Accelerated in a room temperature linac to about 100 MeV and SRF linac to 5 GeV.

9-Feb-06ILCSC7 Positron Source Primary e - source e - DR Target e - Dump Photon Beam Dump e + DR Auxiliary e - Source Photon Collimators Adiabatic Matching Device e + pre- accelerator ~5GeV 150 GeV100 GeV Helical Undulator In By-Pass Line Photon Target 250 GeV Positron Linac IP Beam Delivery System Keep Alive: This source would have all bunches filled to 10% of nominal intensity. Helical Undulator Based Positron Source with Keep Alive System

9-Feb-06ILCSC8 ILC Small Damping Ring Multi-Bunch Trains with inter-train gaps

9-Feb-06ILCSC9 ILC Damping Ring: Baseline Design Positrons: – Two rings of ~6 km circumference in a single tunnel. – Two rings are needed to reduce e- cloud effects unless significant progress can be made with mitigation techniques. – Preferred to 17 km dogbone due to: Space-charge effects Acceptance Tunnel layout (commissioning time, stray fields) Electrons: – One 6 km ring.

9-Feb-06ILCSC10 Main Linac: SRF Cavity Gradient Cavity type Qualified gradient Operational gradient Length*energy MV/m KmGeV initialTESLA upgradeLL * assuming 75% fill factor Total length of one 500 GeV linac  20km

9-Feb-06ILCSC11 Cavity: R&D Material R&D: Fine, Large, Single Crystal Fabrication –A number of minor modifications and improvements could be implemented without impact to the basic cavity design. Cavity Preparation Buffer Chemical Processing Cavity Processing (strong R&D needed) –Electro-polishing (EP) System –High Pressure Rinsing (HPR) –Assembly Procedure

9-Feb-06ILCSC12 Superconducting RF Cavities High Gradient Accelerator 35 MV/meter km linear collider

9-Feb-06ILCSC13 Improved Processing Electropolishing Chemical Polish Electro Polish

9-Feb-06ILCSC14 RF Power: Modulator Baseline Alternate The Bouncer Compensated Pulse Transformer Style Modulator Operation: an array of capacitors is charged in parallel, discharged in series. (~2m) Will test full prototype in 2006

9-Feb-06ILCSC15 RF Power: Baseline Klystrons Thales CPI Toshiba Specification: 10MW MBK 1.5ms pulse 65% efficiency

9-Feb-06ILCSC16 Increase diameter beyond X-FEL Increase diameter beyond X-FEL Review 2-phase pipe size and effect of slope ILC Cryomodule

9-Feb-06ILCSC17 ILC Beam Delivery System Baseline (supported, at the moment, by GDE exec) –two BDSs, 20/2mrad, 2 detectors, 2 longitudinally separated IR halls Alternative 1 –two BDSs, 20/2mrad, 2 detectors in single IR Z=0 Alternative 2 –single IR/BDS, collider hall long enough for two push-pull detectors

9-Feb-06ILCSC18 Conclusions -- BCD The baseline configuration for the ILC has been established and is document in the BCD (a 700+ page electronic document) We have put the BCD under configuration control and are evolving it now in a controlled manner The BCD also defines alternatives and the combination of the baseline and alternative will give good guidance for the ILC R&D program The BCD is now being used as the starting point and basis for the reference design / cost effort this year.