Run II Status and Prospects - Spalding1 Run II Status and Prospects Jeff Spalding Fermilab June 14, 2004.

Slides:



Advertisements
Similar presentations
1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
Advertisements

Electron Cooling in the Accumulator McGinnis Electron Cooling in the Accumulator Dave McGinnis.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Run 2 PMG 2/16/06 - McGinnis Run II PMG Stacking Rapid Response Team Report Dave McGinnis February 16, 2006.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
The Tevatron Collider: A Thirty Year Campaign Fermilab Colloquium March 10, 2010 John Peoples 1.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
F Shot Engineering Accelerator Advisory Committee Elvin Harms Fermilab Beams Division 13 May 2002.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Director’s Review 5/5/03 Spalding1 The Run II Upgrade Program Director’s Review May 2003 Program of upgrade projects in MI-Accumulator-Tevatron and the.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
Run II PMG 2/16/06 Martens/Sims 1 Run II Upgrades Status February 2006.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
F All Experimenters' Mtg - 28 Jul 03 Week in Review: 07/21/03 –07/28/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
F 19 August 2002 All Experimenters Meeting Beams Week in Review Continued to work on providing Luminosity L  N p N a /  –Stacking rate –Coalescing efficiency.
Alexei Fedotov, 02/02/12 1 Potentials for luminosity improvement for low-energy RHIC (with electron cooling) February 2, 2012.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
Luminosity expectations for the first years of CLIC operation CTC MJ.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Run II Operational Status and Plans Run II Meeting October 28, 2004 Dave McGinnis.
Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview,
Check lists to mouse clicks Automation Session : WAO The Fermi National Accelerator Laboratory is a U.S. Department of Energy (DOE) research laboratory,
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
ERHIC design status V.Ptitsyn for the eRHIC design team.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Fermilab Run 2 Accelerator Status and Upgrades
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
Can PD/8 GeV Linac Help Tevatron ? Can PD/8 GeV Linac Help Tevatron ? Vladimir Shiltsev AD/Tevatron.
What we have now – the Pbar source 1 1/23/2013 J. Morgan.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
F Record luminosities at the Tevatron & Future potentiality Steve Werkema Fermi National Accelerator Laboratory Batavia, Illinois USA Asian Particle Accelerator.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
F HCP 2007 Performance and Future of the Tevatron Ron Moore Fermilab - Tevatron Dept. Tevatron overview and performance Antiproton source + Recycler overview.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
F All Experimenters' Mtg - 6 Jan 03 Week in Review: 12/30/02 –1/05/03 Ron Moore – FNAL Store Summary – Best week! > 7 pb -1 Machine Studies/Maintenance.
Pbar Production Status & Plans to get to 25mA/hr Keith Gollwitzer Antiproton Source August 31, 2006.
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
Antiproton Acceptance Steve Werkema DOE Review February 24, 2004.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
Operating IP8 at high luminosity in the HL-LHC era
Beam-beam effects in eRHIC and MeRHIC
Large Booster and Collider Ring
JLEIC Main Parameters with Strong Electron Cooling
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

Run II Status and Prospects - Spalding1 Run II Status and Prospects Jeff Spalding Fermilab June 14, 2004

Run II Status and Prospects - Spalding2 Contents  Introduction  Major elements of the Run II “campaign”  Present performance  Status of the upgrade projects  Luminosity projection  Summary

Run II Status and Prospects - Spalding3 Run II goal: maximize integrated luminosity delivered to CDF & D0 …

Run II Status and Prospects - Spalding4 … with a program of upgrades throughout the complex Recycler Ring

Run II Status and Prospects - Spalding5 Basis for the Plan: What drives the luminosity  Peak Luminosity  Luminosity lifetime (tunes, beam-beam interactions)  Reliable Operation  p,  pbar, form factor F,  * provide some gains But major improvements from bunch intensities  especially total number of pbars BN pbar, (B=36 bunches for Run II)  proton brightness (N p /  p ) is constrained by beam-beam tune shift

Run II Status and Prospects - Spalding6 Major Elements of the Run II Campaign

Run II Status and Prospects - Spalding7 Operational improvements and upgrade projects Near Term (and ongoing)  Improved reliability and operating efficiency  Failure modes, abort system improvements…  Tevatron alignment  Improved instrumentation throughout the complex  Optimization of transfers, improved optics and helices in Tevatron Upgrade Projects  Increase pbar production  Slip stacking  Pbar acceptance upgrade  Stacking rate and stack size (stacktail, Recycler, e-cooling)  Upgrade Tevatron for higher bunch intensities  Helix  TEL: active beam-beam compensation

Run II Status and Prospects - Spalding8 Reliability  The number of store hours per week is up 27% from FY03 - the TEV is a more reliable machine.  Typical store length 15 hrs last year  >24 hrs now  Due to:  Alignment of the TEV Dipole un-rolls, Low Beta alignment, Smart bolt retrofit  Reliability strategy Aggressively pursue equipment failures –Individual components and Systems (e.g. TEV abort system)  Operations strategy With improved reliability  run long stores –More time to ensure large stack size –Minimize the effects of store turnaround time –Minimize impact of parasitic studies Short focused dedicated studies –Configuration control

Run II Status and Prospects - Spalding9 Dynamic plan – adjust the strategy when new information from operations and project R&D Major Elements  Increase number of protons on the pbar production target  Slip stacking (5E12  >8E12 protons on pbar target)  Upgrade the target itself to handle higher intensity  Increase antiproton collection  Increase the gradient of the antiproton collection lens  Increase the aperture of the antiproton collection transfer line (AP2) and the Debuncher ring.  Increase the antiproton stacking and storing capabilities  Increase the flux capability of the Accumulator stacktail stochastic cooling system.  Use the Recycler as a second antiproton storage ring, with both stochastic and electron cooling  Upgrade Tevatron to handle higher intensity bunches.  Improvements to helix separation and smoothness  Active compensation for beam-beam tune shift using the TEL Upgrade Projects

Run II Status and Prospects - Spalding10 Status of Operations Run I

Run II Status and Prospects - Spalding11 Status: Integrated Luminosity Up 55% with 14% fewer scheduled running weeks Average integrated luminosity per week is up 80% Compare the last 12 months to the year before

Run II Status and Prospects - Spalding12 Status: Peak Luminosity Current best = 7.6E31 cm -2 s -1 *

Run II Status and Prospects - Spalding13 Summary of Current Operations  Booster running at record intensities  Major improvements in transfer efficiencies and emittances, TEV tunes, optics and helix  Improved reliability and operations allows longer stores  larger stacks  higher luminosity  However, stacking rate is ~75% of current goal – present focus of investigation and improvement for the stacktail and core cooling systems  Near term: introduce mixed-source operation (pbars loaded from both Accumulator and Recycler) – first [pilot] store 6/9/04 successful (6.7E31)  And slip-stacking by end of 04 ( already tested at 75% of design intensity) – awaits completion of RF upgrade

Run II Status and Prospects - Spalding14 Status of the Upgrade Projects

Run II Status and Prospects - Spalding15 Main Injector  Slip Stacking (goal x1.8ppp on pbar tgt)  Excellent progress  6 x and 1.5 nsec bunch length on pbar target  Reliable operation >8 x requires RF upgrade (beam-loading compensation)  On track for end of this year.

Run II Status and Prospects - Spalding16 Pbar Source Pbar Acceptance (goal: x2)  Lithium Lens (goal x 1.1)  Prototype of new design (higher field gradient) bench test successful  AP2 and Debuncher aperture increase (goal x1.8)  Developed procedures for beam-based identification of limiting apertures, identified components to modify Stacktail cooling upgrade  Cooling system upgrade (extends the bandwith 2-4  2-6 GHz)  Requires the large stack to be in Recycler (with e-cool), and “rapid transfers”  Not [easily] reversible  emphasize a phased approach  Interim upgrade (05) [NEW] Reconfigure existing cooling tanks -quick and reversible Simulated performance ~30E10 per hr  Full upgrade, with new cooling tanks (06) Simulated performance ~40E10 per hr

Run II Status and Prospects - Spalding17 Recycler  The Recycler has made excellent progress over the past year  Transverse emittance growth is no longer an issue (vacuum problems solved)  Met the performance specs needed for commissioning electron cooling  Ready to be integrated into operations (with stochastic cooling)  Provides possibility for interim operating phase [NEW]  Extract pbars from both Accumulator and Recycler: “mixed-source”  e.g. 24 bunches from the Accumulator + 12 bunches from the Recycler  A few (2-4) interim transfers from Accumulator to Recycler  Improves average stacking rate in the Accumulator  Reasons  Push Recycler commissioning progress by plunging it into operations  Potential luminosity enhancement – more pbars for smaller emittances Break-even right now, potential for up to 20% gain in the next year  Flexibility in the Run II Upgrade schedule Merge more naturally into commissioning electron cooling

Run II Status and Prospects - Spalding18 Electron Cooling  R&D program on e-beam is complete, now moving the setup to the Recycler  R&D scheduled stretched by ~2 months  NOT BAD!  Operational test of the full system successful  All major components, diagnostics and controls developed and tested  Beam properties achieved close to spec (analysis ongoing)  Will add additional Pelletron section at Recycler  reliable operation at 4.3 MeV  Commission e-beam and then pbar cooling in Recycler, parasitic to HEP, then intro e-cooled stacks to HEP (05)  Still R&D (until pbar cooling demonstrated next year), but excellent progress

Run II Status and Prospects - Spalding19 Tevatron Major improvements so far  Lifetime at 150 GeV  Larger aperture, alignment and dipole un-rolls  Emittance dilution reduced  De-coupling at TEV injection, optimization of injection optics  Helix improvements  CDF IP  Centered beam in low beta quads (4mm move at CDF), and re- aligned the quadrupoles  New Low Beta Optics  20% increase in luminosity Upgrades  Further alignment improvements in shutdown 04 (and 05)  Add separators and polarity switches in shutdown 04 and 05  improved helices

Run II Status and Prospects - Spalding20 Luminosity Projections

Run II Status and Prospects - Spalding21 Luminosity Projection  Luminosity model incorporates  Performance parameters from simulation, parametric model and data  Long term operating experience Sustained average store length was 15 hrs (now >24) Sustained average 85 store hrs/week (operating weeks often >>100)  Scheduled shutdowns + turn on & recovery + learning slopes  Expect to do better on some parameters, worse on others  What’s new  The following plots are from Feb04 DOE review Illustrate strategy Updated projection will be similar in scale  We are in the process of updating the projections for: e-cooling and stacktail schedules and strategy Improved reliability (longer stores and stacking) Mixed-source op - assume break even (conservative)

Run II Status and Prospects - Spalding22 Design and Base Projections (Feb04 DOE Review) Integrated Luminosity Design Projection - No schedule contingency, maintains eng. design margin per subproject Base Projection - Assumes schedule slip for all subprojects and that all subprojects under perform

Run II Status and Prospects - Spalding23 Design and Base Projections (Feb04 DOE Review) We are here Integrated Luminosity per Week

Run II Status and Prospects - Spalding24 Risk Analysis / Strategy (Feb04 DOE Review) Our plan is to deliver the Design Projection but develop strategy for fallback scenarios:  Base Projection models schedule slip and under-performance for all upgrades  Can also ask: where would we be  without Recycler & e-cooling?  with e-cooling, but without stacktail upgrade?

Run II Status and Prospects - Spalding25 Risk Analysis / Strategy (Feb04 DOE Review)  Design Projection  Electron Cooling  Stacktail Upgrade  Parameters in FY09 Debuncher & AP2 at 32  -mm-mrad Slip Stacking at 8x10 12 ppp Av. Stk Rate = 39x10 10 /hr Stk in Accum = 20x10 10 Stk in Rec’r = 570x10 10  Base Projection  As above with sched & param slip  Parameters in FY09 Debuncher & AP2 at 25  Slip Stacking at 7x10 12 ppp Av. Stk Rate = 24x10 10 /hr Stk in Accum = 24x10 10 Stk in Rec’r = 360x10 10  Black Projection  NO Electron Cooling  NO Stacktail Upgrade  Parameters in FY09 Debuncher & AP2 at 21  Slip Stacking at 7x10 12 Av. Stk Rate = 14x10 10 /hr Stk in Accum = 205x10 10 Stk in Rec’r = 0x10 10  Purple Projection  Electron Cooling  NO Stacktail Upgrade  Parameters in FY09 Debuncher & AP2 at 20  Slip Stacking at 8x10 12 Av. Stk Rate = 23x10 10 /hr Stk in Acum = 58x10 10 Stk in Rec’r = 337x10 10

Run II Status and Prospects - Spalding26 Risk Analysis / Strategy (Feb04 DOE Review) with e-cooling, but w/o stacktail upgd without e-cooling & stacktail upgd Branch points from Design Projection Design Black Purple Assumes average store length 15 hrs

Run II Status and Prospects - Spalding27 Strategy Changes Design Black Purple mixed-source operation longer stores e-cooling and interim stacktail upgrade will be delayed to fall 2005, full upgrade in 06 interim Stacktail upgrade WARNING: curves not yet updated changes in green to be implemented

Run II Status and Prospects - Spalding28 Risk Analysis / Strategy (Feb04 DOE Review) Design Base Black Purple

Run II Status and Prospects - Spalding29 Summary  Current performance is above the design projection  80% higher weekly luminosity than a year ago  Major achievements in the last year (Tevatron perf, Recycler…)  There is a complex-wide plan for the Run II campaign  Plan is dynamic: schedule/scope adjustments, mixed-source, capitalize on improved reliability  The upgrade projects are making good technical progress  The plan and progress are formally reviewed by DOE  With the updated plan, expect the design projection to be close to the previous 8.5 fb , with fall-back scenarios >4.5 fb -1