Program Scheduling Capstone By Amanda Wilson California Lutheran University Spring 2003.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Project management software is a term covering many types of software, including scheduling, cost control and budget management, resource allocation,
Lecture Network Analysis
PRJ566 Project Planning and Management Lecture: Dependencies and Network Diagrams.
Work Breakdown Structures
Estimating, scheduling and budgeting
Chapter 3 Managing the Information Systems Project
3-1 © Prentice Hall, 2004 Chapter 3: Managing the Object-Oriented Information Systems Project Object-Oriented Systems Analysis and Design Joey F. George,
© 2005 by Prentice Hall Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
Advanced Project Management - CPH
Scheduling The Project  Scheduling Planning, budgeting and scheduling are all part of the same process Planning a project, developing a budget for it,
Chapter 10: Project Schedule Planning
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
© 2008 by Prentice Hall 3-1 ITCS311 Systems Analysis and Design Dr. Taher Homeed Feb 2010 Department of Computer Science College of IT University of Bahrain.
Eleanor Roosevelt High School
Microsoft Project.
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
Project Management. What is a Project? One Time Effort Identifiable Start/End Points Specific Objectives Multiple Tasks Resources from Across the Organization.
Importance of Project Schedules
Project Management Outline of Chapters 1-6. Chapter 1 – Project Management Concepts Definition of a project and its attributes Key constraints within.
COMP2001 HNC Project. Project Characteristics A project must have: clear objectives planning & control resources assurance of quality.
Chapter 3 Managing the Information Systems Project
Operations Management 14 Chapter Copyright ©2011 Pearson Education.
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
CRITICAL PATH DEFINITION.  ALL the tasks that determine the end date in your project schedule.  The critical path is the longest PATH, through the “AON”
ERT461 BIOSYSTEMS ENGINEERING DESIGN 1 ERT424 BIOPROCESS PLANT DESIGN 1.
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
Chapter 3 : Managing the Information Systems Project.
Lesson №2. is the unique activity that has a beginning and an end time, aimed at achieving a predetermined result/goal, the creation of a specific, unique.
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 5 Time Management Developing and controlling the.
Project Time Management One Minute Thirty Second Overview One Minute Thirty Second Overview.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 7 Project Manager’s Toolkit for Time Management.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
Software Project Management
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
1IT Project Management, Third Edition Chapter 6 Chapter 6: Project Time Management.
Geog 469 GIS Workshop Project Management.
1 Selected Topics on Project Management The Critical Path Dr Marc Conrad 1Marc Conrad.
Chapter 3 Managing the Information Systems Project
Project Time Management Ashima Wadhwa. Schedule Development – Determining start and finish dates for project activities – Without realistic dates, project.
Project Time Management
MARCH 1 Project Management Problem statement l no hurdles, no problem just a goal l open-ended … no single correct answer l closed-ended … single answer.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
PERT Gantt WBS.
Managing Schedule Slack/Float PMI Scheduling Forum January 6, 2015 January 6, 2015 Presented by: Ric Albani, PMP, PMI-SP, PMI-RMP, MCTS.
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
Tools to Help  Product flow Dependencies and relationships of deliverables  Work breakdown structure The parts  PERT charts Program Evaluation and.
Managing the Information Systems Project Cont’d
Chapter 3 Managing the Information Systems Project
Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Business System Development
REQUIREMENTS Project management tools
Eleanor Roosevelt High School
PERT - The Program Evaluation and Review Technique
Exercise – A small building.
Importance of Project Schedules
Project Management Project management is the discipline of organizing and managing resources in such a way that these resources deliver all the work required.
CHAPTER 6 PROJECT TIME MANAGEMENT
Presentation transcript:

Program Scheduling Capstone By Amanda Wilson California Lutheran University Spring 2003

What is Scheduling? ScheduleA Schedule is an event (task) driven roadmap for an entire program. The Schedule provides task details, durations, and links enabling effective program management. Critical Path,Identifies the Critical Path, so revisions to the Schedule can be made to problematic areas or in the event of delay.

What is Scheduling? (cont.) Schedule A Schedule can be compared to an onion. Underneath the top layer (critical path) another layer always exists.

Creating A Baseline Schedule Identify tasks to be performed (summary or key tasks) Breakdown summary tasks into detail tasks (use verbs for task definitions) Establish durations for each task Create Network Flow by connecting logic between tasks Place constraints and milestones on the project’s START and FINISH tasks Rework Network logic and durations to assure zero or positive slack Set Baseline (freezes dates/times)

Creating A Baseline Schedule (cont.) The Baseline schedule, once set, is used as a measuring tool against future schedule status and overall schedule/program performance Once the Baseline schedule is established and approved by the customer this schedule cannot be altered without prior consent of the customer

Schedule Types Gantt Chart –Shows specific start and stop dates for tasks Milestone Chart –Major event oriented Line of Balance –Depicts production activity; actual vs. planned Network Flow Diagram –Identifies and defines all tasks and events and links them in logical sequences (clearly depicts the critical path)

Schedule Types (cont.)

Critical Path Def: the series of tasks that must be completed on time for the project to be satisfactorily completed This is the path which is longest in duration; also known as “the driver” A schedule should have Slack or Float which is the amount of time a task can be delayed before affecting another task or the project schedule (critical path) Slack allows some flexibility to the schedule in case of unforeseen problems without delay to the entire program

Example – Create A Schedule Planning A Graduation Party –What are the tasks? –How much time will each task require? –When should I start so I am ready by graduation day? –What are my constraints? –How should I link the task logic? –What is my critical path?

Example (cont.) TASKS and DURATIONS (in days – d) –Decide to have party (START) – 0d –Create guest list – 1d –Make invitations – 3d –Send invitations – 1d –Buy refreshments and utensils – 1d –Buy decorations – 2d –Set up decorations – 1d –Graduation/Party Day (FINISH) – 0d

Example (cont.) Added Constraints: –You must send the invitations before you can buy refreshments and before you can buy decorations –All other constraints can be seen through general logic regarding the situation

Example – Network Flow Diagram

Summary ScheduleA Schedule is a roadmap for the entire length of a program ScheduleA Schedule is DYNAMIC – always changing & evolving itself to meet program needs Key tool for program management and evaluation The ONION of a program stew! GOOD SCHEDULE = PROGRAM SUCCESS

The End

QUESTIONS?