Observing Operations Concept Document Elizabeth McGrath NGAO PD Team Meeting #6 March 19, 2009.

Slides:



Advertisements
Similar presentations
GENIUS kick-off - November 2013 GENIUS kick-off meeting The Gaia context: DPAC & CU9 X. Luri.
Advertisements

NGAO Systems Engineering Status Team Meeting #3 (Video) R. Dekany 13 December 2006.
Science Group: Status, Plans, and Issues Claire Max Liz McGrath August 19, 2008.
Planets around Low-Mass Stars and Brown Dwarfs Michael Liu Bruce Macintosh NGAO Workshop, Sept 2006.
PRIMA Astrometry Calibration and Operation Plan PRIMA Astrometry Calibration and Operation Plan VLT-PLA-AOS draft Scope of the Document 
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting February 20, 2008.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
Science Team Management Claire Max Sept 14, 2006 NGAO Team Meeting.
The Need for Contiguous Fields NGAO Team Meeting, Waimea January 22, 2007 Claire Max.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. ~ March 20, 2009 February 5, 2009 DRAFT.
Trying to connect WBSs with people and phases Relevant questions to my work: How the realistic NGAO strategies will/should affect the work in progress?
NGAO Science Instrument Reuse Part 2: Update and required feedback NGAO IWG Anna Moore, Sean Adkins NGAO Team Meeting January 22, 2007.
Keck NGAO Science Case Requirements Claire Max and Liz McGrath NGAO Team Meeting 13 January 25, 2008.
NGAO System Design: AO System (WBS 3.2) & Laser Facility (WBS 3.3) Design Inputs & Outputs Peter Wizinowich NGAO Team Meeting #9 August 24, 2007.
Science Operations Update NGAO - Meeting 11 D. Le Mignant, E. McGrath & C. Max W. M. Keck Observatory 11/05/2007.
The Path to NGAO Core Science Requirements Claire Max and Liz McGrath NGAO Team Meeting September 11-12, 2008.
NGAO Meeting #3 Introduction NGAO Meeting #3 Peter Wizinowich December 13, 2006.
Planning “Science Operations” tasks for the PD phase NGAO PD Phase D. Le Mignant W. M. Keck Observatory 08/19/2008.
NGAO Science Instruments Build to Cost Status February 5, 2009 Sean Adkins.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
Science Operations Replan NGAO - Meeting 6 D. Le Mignant W. M. Keck Observatory 04/25/2007.
WMKO Next Generation Adaptive Optics Science Advisory Team: Introductions & NSAT Charge Taft Armandroff, Mike Bolte, Shri Kulkarni, Hilton Lewis June 11,
NGAO System Design Phase Management Report - Replan NGAO Meeting #6 Peter Wizinowich April 25, 2007.
PRIMA Astrometry Object and Reference Selection Doc. Nr. VLT-PLA-AOS Astrometric Survey for Extra-Solar Planets with PRIMA J.Setiawan & R. Launhardt.
Science Operations Plan NGAO - Meeting 10 D. Le Mignant W. M. Keck Observatory 09/17/2007.
Observing efficiency for NGAO 1.Definitions 2.Lessons learned a)Keck LGS AO “efficiency” b)Keck AO brute conclusion 3.Observing efficiency budget 4. Observing.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team (with input from Sean Adkins, Matthew Britton, Ralf.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
1 Keck NGAO Project Replan: Science Cases and Requirements Claire Max NGAO Team Meeting 6 April 25, 2007.
NGAO operations thoughts D. Le Mignant, E. Johansson, C. Neyman.
30 March 2006Birmingham workshop1 The Gaia Mission A stereoscopic census of our Galaxy.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
NGAO topical discussion: Observing Efficiency and Uptime Budgets Telecon Meeting 12/7 D. Le Mignant and E. Johansson 7 Dec Attendees; R. Campbell,
NGAO Build to Cost Summary Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire Max & the NGAO Team SSC Meeting April 14, 2009.
NGAO Instrumentation WBS Replan By Sean Adkins April 25, 2007.
Science Requirements Impacting AO Architecture Claire Max Architecture Meeting July
NGAO Meeting #5 Introduction NGAO Meeting #5 Peter Wizinowich March 7, 2007.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. December 2, 2008 DRAFT.
NGAO Instrumentation Preliminary Design Phase Planning September 2008 Sean Adkins.
Functional Requirements for NGAO Christopher Neyman W. M. Keck Observatory NGAO Team Meeting #9 August 24, 2007.
Black Holes in Nearby Galaxies Claire Max NGAO Team Meeting March 7, 2007.
Plan to develop system requirements through science cases Claire Max Sept 14, 2006 NGAO Team Meeting.
Trade Study Report: NGAO versus Keck AO Upgrade NGAO Meeting #5 Peter Wizinowich March 7, 2007.
Trying to connect WBSs with people and phases Relevant questions to my work: How the re 8 -planning will affect the work in progress? Priorities to capture.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting November 6, 2007.
LSST CD-1 Review SLAC, Menlo Park, CA November 1 - 3, 2011 Analysis Overview Bhuv Jain and Jeff Newman.
The Astro-Wise Pipeline Conceptual Design Review Roeland Rengelink Requirements Development Framework Prototype.
C. Executive Summary Phil Hinz Principal Investigator.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
Extrasolar Planet Search OGLE-2005-BLG-390Lb The Age of Miniaturization: Smaller is Better OGLE-2005-BLG-390Lb is believed to be the smallest exoplanet.
Toward the Senior Review Rob Petre. Senior Review proposal details Due March 12, 2008 Competing against: XMM, INTEGRAL, RXTE, Swift, Galex, WMAP, Spitzer.
Agenda 1. Key Activities, Accomplishments and Status 2. Task Review 3. Meeting Notes and Action Items.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
DEX Publication Project OASIS PLCS TC Telecon 22 January 2008 Trine Hansen.
System Performance Metrics and Current Performance Status George Angeli.
Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.
Project Management Requirements Prof. Ralph Locurcio, PE Dr. Troy Nguyen, PE.
High School Biology EOC Planning and Updates December 4, 2012  Welcome- Networking and Coffee  Door Prizes  Contest  Entry Task.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Science Priorities and Implications of Potential Cost Savings Ideas
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
ESAC 2017 JWST Workshop JWST User Documentation Hands on experience
NGAO System Design Project Plans and Schedule
Project 1: System Concept
04/02/2019 The Use of Grid Technology in Large Scale Data Processing Collaboration Environments S.G. Ansari S.G. Ansari 04/02/2019.
NGAO topical discussion: Observing Efficiency and Uptime Budgets
(AO) Observations of the Galactic Center
Presentation transcript:

Observing Operations Concept Document Elizabeth McGrath NGAO PD Team Meeting #6 March 19, 2009

2 Document Overview “This document should define an observing operations conceptual design that meets the SRD requirements in a manner that maximizes the scientific productivity.” Scope and applicability: –“The OOCD describes how the features and functions of the design described in the SDM will be used to carry out the observations described in the science cases.” –Calibration of the AO system will be covered in a separate AO Calibration Document. –NGAO configurations will be covered in a separate Sequencers Definition Document.

3 Document Overview (continued) OOCD has been evolving as B2C design has evolved A number of science performance simulation tools have been or are being developed in support of the OOCD: –Observing Efficiency Calculator (D. LeMignant) –Throughput and Emissivity Budget (A. Bouchez, D. Gavel) –Imaging Simulation Tool (F. Marchis) –IFU Sensitivity Simulation Tool (D. Law) –IFU Radial Velocity Sensitivity Simulation Tool (D. Law?) –Photometric and Astrometric Catalog (DENIS, 2MASS, LSST, PanStarrs) –Ephemeris Calculator (SKYBOT2 in Paris, web-based)

4 Current Status Pre-observing, Observing, and Post-observing tasks have been identified and documented for most of the key science drivers: –Galaxy Assembly IFU and imaging cases –Nearby AGNs IFU case –Exoplanets imaging case –Minor Planet Multiplicity imaging case Galactic center (both imaging for astrometry, and IFU for radial velocities) needs work. –Rough draft for imaging based on the other science cases –Plan to ask A. Ghez to look it over and modify observing tasks to reflect how they actually perform their observations

5 Remaining Action Items Before Release 1 Finish Key Science Driver observing scenarios –Finish NIR Imager observation of Galaxies –Ask Ghez to review astrometry section & who should write GC RV section + minimum/goal IFU size Imaging simulation tool –Check integration time & sampling for planets around low mass stars using Marchis’ tool & Sean’s detector numbers –Make this tool available on Wiki Interferometer –Insert and update science requirements for interferometer from KAON 456 (p61 Table 30) in consultation with Sam Ragland

6 Remaining Action Items Before Release 1 (continued) Daytime Ops –Interact with Campbell to flesh out daytime ops Section on Use Cases needs a lot of work –With the exception of the AO acquisition use case, this section has not yet been started Review observing tasks for various science cases and clean up notes & comments in the margin of the document Need to define a path forward for establishing PSF metrics & requirements