MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August 2008 1 Targetry R&D in the 5-Year Plan Harold G. Kirk Brookhaven National Lab.

Slides:



Advertisements
Similar presentations
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
Advertisements

Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
Mercury Beam Dump Simulations Tristan Davenne Ottone Caretta STFC Rutherford Appleton Laboratory, UK November-2008.
Fluidised powder target research A potential target technology for both a Superbeam and a neutrino factory CJ Densham, O Caretta, P Loveridge STFC Rutherford.
K. McDonald LEMC Workshop 22 Apr 2008 From MERIT to a Muon Collider (Front End) K.T. McDonald Princeton U. Low Emittance Muon Collider Workshop Fermilab,
Managed by UT-Battelle for the Department of Energy Neutrino Factory Mercury Containment Concepts V.B. Graves 2 nd Oxford-Princeton High- Powered Target.
Neutrino Factory Target Cryostat Review Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
Neutrino Factory Mercury Flow Loop V. Graves C. Caldwell IDS-NF Videoconference March 9, 2010.
1Managed by UT-Battelle for the U.S. Department of Energy MERIT Videoconference 11 Mar 2009 Neutrino Factory Cryostat 1 Concept V.B. Graves MERIT Videoconference.
1Managed by UT-Battelle for the U.S. Department of Energy NF/IDS Hg Vessel Layout 30 Jun 09 Cryostat 2 Front Drain Mercury Vessel Concept Matthew F. Glisson.
Harold G. Kirk Brookhaven National Laboratory High-Power Targets H.G. Kirk Applications of High-Intensity Proton Accelerators FNAL October 20, 2009.
Harold G. Kirk Brookhaven National Laboratory The MERIT High-Power Target Experiment Muon Collider Design Workshop BNL December 3-7, 2007.
Harold G. Kirk Brookhaven National Laboratory Hg Jet Quadrupole Distortions MERIT Collaboration Meeting Princeton November 17, 2005.
KT McDonald Muon Collider 2011 June 28, The Target System Baseline K. McDonald Princeton U. (June 28, 2011) Muon Collider 2011 Telluride, CO More.
Above: Energy deposition in the superconducting magnet and the tungsten-carbide shield inside them. Approximately 2.4 MW must be dissipated in the shield.
1 Optical Diagnostic Results of MERIT (Mercury Intense Target) Experiment at CERN H. Park, H. Kirk, T.Tsang, K. McDonald, F. Ladeinde NFMCC Meeting Fermilab,
Harold G. Kirk Brookhaven National Laboratory Target System Update IDS-NF Plenary Meeting Arlington, VA October 18, 2011.
KT McDonald Target Studies Meeting June 14, Mechanical Issues for the Target System K. McDonald Princeton U. (June 14, 2011) Target Studies Meeting.
Harold G. Kirk Brookhaven National Laboratory Target Baseline IDS-NF Plenary CERN March 23-24, 2009.
1Managed by UT-Battelle for the U.S. Department of Energy NMFCC Friday Meeting 10 Apr 2009 Neutrino Factory Nozzle Layouts V.B. Graves NFMCC Friday Meeting.
IDS-NF Target Studies H. Kirk (BNL) July 8, 2009.
K. McDonald Muon Collaboration Meeting 19 Mar 2008 Future Target System R&D Analysis (and simulation) of MERIT data is ongoing, but the success of the.
Above: Power deposition in the superconducting magnets and the tungsten-carbide + water shield inside them, according to a FLUKA simulation Approximately.
Harold G. Kirk Brookhaven National Laboratory Recent Results from MERIT NUFACT09 Illinois Institute of Technology July 22, 2009.
The MERIT experiment at the CERN PS Leo Jenner MOPC087 WEPP169 WEPP170.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
Front End Technologies Harold Kirk Brookhaven National Laboratory February 19, 2014.
MCTF Alexander Zlobin MUTAC Meeting 8-10 April MCTF Magnet and HTS Conductor R&D.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
Target and Absorbers L2 Manager: K McDonald, Princeton U March xx, 2013 Presenter’s Name | DOE Mini-Review of MAP (FNAL, March 4-6, 2013)1 Mission Target:
Ajit Kurup, Imperial College London. Neil Bliss, Norbert Collomb, Alan Grant, STFC/DL, Daresbury. Costing Methodology and Status of the Neutrino Factory.
A powder jet target for a Neutrino Factory Ottone Caretta, Chris Densham (RAL), Tom Davies (Exeter University), Richard Woods (Gericke Ltd)
MCTF Michael Lamm MUTAC 5-Year Plan Review 22 August Magnet R&D for Muon Accelerator R&D Program Goals Proposed Studies Preliminary Effort and Cost.
Next generation of ν beams Challenges Ahead I. Efthymiopoulos - CERN LAGUNA Workshp Aussois, France, September 8,2010 what it takes to design and construct.
Institutional Logo Here Harold G. Kirk DOE Review of MAP (FNAL August 29-31, 2012)1 The Front End Harold Kirk Brookhaven National Lab August 30, 2012.
F Fermilab’s Muon Collider Task Force: Overview, Status and Plans Vladimir Shiltsev Fermilab AAC, August 08, 2007.
Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
K. McDonald Target Studies Meeting June 29, Materials for the Target System Internal Shield K. McDonald Princeton U. (June 27, 2010) Iron Plug Proton.
Front-End Design Overview Diktys Stratakis Brookhaven National Laboratory February 19, 2014 D. Stratakis | DOE Review of MAP (FNAL, February 19-20, 2014)1.
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
Muon Acceleration Program Technology Development A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009 It is not a Project!
Target Mechanical R/D Magnetic Immersion Effects (Daresbury Experiment) Pass-Through/Seals (Vacuum, Water union)- leaks, survivability Thermal Loading.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
K. McDonald MAP Technical Board Meeting Nov 1, FY11 Target System Budget Proposal K. McDonald Princeton U. (November 1, 2010)
MCTF Steve Geer AAC Meeting May MUON COLLIDER & NEUTRINO FACTORY R&D AT FERMILAB Overview of organization, budgets, and plans.
Harold G. Kirk Brookhaven National Laboratory Report from the NFMCC MUTAC REVIEW Lawrence Berkeley National Laboratory April 8, 2008.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
Harold G. Kirk Brookhaven National Laboratory Targetry Program Collaboration Meeting Columbia University June 11, 2003.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
Muon Collider R&D Co-ordination MCTF. INTRODUCTION 2 2 Steve Geer MUTAC REVIEW April 2007 BNL Steve Holmes, March 13 th, 2007: “ … MCOG ask the NFMCC.
Institutional Logo Here July 11, 2012 Muon Accelerator Program Advisory Committee Review (FNAL July 11-13, 2012)1 The Front End.
Harold G. Kirk Brookhaven National Laboratory The E951 Targetry Program Targetry Meeting CERN September 19, 2003.
Neutrino Factory Target Cryostat Review (Update Aug 12) Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
August 8, 2007 AAC'07 K. Yonehara 1 Cooling simulations for Muon Collider and 6DMANX Katsuya Yonehara Fermilab APC MCTF.
R&D towards a Multi-TeV Muon Collider Steve Geer 1.Introduction 2.Muon Collider Ingredients 3.Muon Collider / Neutrino Factory R&D 4.Muon Collider Specific.
Ids120h_side. ids120h_top ids120h_iso ids120h_end.
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August Other R&D Harold G. Kirk Brookhaven National Lab.
Your institutional logo. MAP Design & Simulation Overview Richard Fernow Brookhaven National Laboratory Muon Accelerator Program Review Fermilab 24 August.
Target On axis field [scale /20 T] Target Magnets Decay-Channel Triplets Taper magnets.
Harold G. Kirk Brookhaven National Laboratory Muon Production and Capture for a Neutrino Factory European Strategy for Future Neutrino Physics CERN October.
BNL solenoid capture workshop: magnet challenges are not trivial Summarized by Tengming Shen
Neutrino Factory Mercury Catcher Concept
Target and Horn status report
Outline: Why now ? What ? How ?
Presentation transcript:

MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August Targetry R&D in the 5-Year Plan Harold G. Kirk Brookhaven National Lab

MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August Targetry Tasks Simulation (coordinator: Rick Fernow) –Benchmark MERIT results –Refine MHD modeling of beam/jet/field interactions –Refine nozzle simulations –Study Hg jet splash issues for Hg collection pool Facility Design (in conjunction with the MC RDR) –Upstream & downstream beam windows –Robotics for target replacement/repairs –Design of tungsten/water inner shielding –Study use of HTS conductor in target solenoid Hardware R&D (see pp. 4-9)

MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August RDR Specifics Proton Driver –Interface with Project X team to determine required modifications needed for NF Target Station –Simulation, next iteration on target facility, detailed engineering of component parts Pion Capture and Phase Rotation –Complete engineering design for front-end Cooling Channel –Finalize engineering design of Study 2a channel (MICE +) Possible modifications –H 2 gas absorbers –Helical cooler Issues in common with MC ZDR (Alan Bross):

MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August Post-MERIT Targetry Hardware Effort Hg Handling Issues –Continuous Hg Loop –Eurosol/ESS Collaboration Hg Jet optimization –Nozzle optimization –Reconfigured Optical Diagnostics –Improved Jet delivery Jet/Beam Dump Interaction –Jet/Dump Splash Studies Iron Plug Studies Tungsten-Carbide Shielding

MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August Hg Handling Issues Engineer Hg loop Study CW Hg flow issues Acquire Hg safety experience Explore collaboration with Eurosol/ESS

MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August Iron Plug Purpose: Generate a more uniform magnetic field in jet delivery region More closely approximate NF/MC targetry concept Reduce jet distortion Nozzle/Jet Integration Mechanical forces and stress analysis essential

MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August Beam Dump in Main Cryostat Assembly and maintenance issues require further thought Thermal management issues will be significant Simulation and hardware studies of Jet/dump splashes

MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August Tungsten-Carbide Shielding Shielding Rudimentary Concept: Needs further development

MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August TARGETRY DELIVERABLES Nozzle design for optimized Hg jet delivery Understanding of Jet/Dump interaction issues Operational experience with a continuous Hg loop Demonstration of impact of Fe plug on jet performance Design for a water-cooled tungsten-carbide shield

MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August COST BREAKDOWN FY08FY09FY10FY11FY12 FTEs SWF (K$) M&S (K$) Total (K$)