Scheduling & Resource Planning CTC-415. Schedule Compression Used to decrease schedule time –At what price? Does cost of compression outweigh liquidated.

Slides:



Advertisements
Similar presentations
Starting the essayResearching the topic Organizing your idea Writing the essayReferencing the essay.
Advertisements

Scheduling CTC-470.
Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 1 Reasons to Reduce Project Durations: 1.To realize incentive pay 2.To fit.
1 Project Planning BA Project Planning and Control Definition of Project Management Work Breakdown Structure Critical Path Scheduling Ideal Completion.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 9: Reducing Project Duration
Reducing Project Duration
SCHEDULE COMPRESSION In real practice – how would you compress your Schedule?
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
Reducing Project Duration
■ Project duration can be reduced by assigning more resources to project activities. ■ However, doing this increases project cost. ■ Decision is based.
Reviewing & Analyzing Schedule
Time-Cost Trade-Off (Time Reduction = Time Compression = Time Shortening) 4/17/ :55 AM.
Scheduling CTC-415. Activity Network Development Network Models Activity on Node Precedence Diagram Method Activity on Arrow Network Characteristics Discrete.
Analyzing Cost-Time Trade-Offs There are always cost-time trade-offs in project management. – You can completing a project early by hiring more workers.
Construction Scheduling and Estimating.  Someone gets an IDEA  The IDEA inspires a PLAN to be created  The PLAN is used to build the SCHEDULE  The.
On Target Group Coaching
1 7. R EPETITIVE C ONSTRUCTION Objective: To understand how production and production rates are affected by repetition of tasks, and to learn how to plan.
Planning and Scheduling. Project Planning –Selecting Construction Methods and sequence of work –Must complete planning before doing scheduling –Steps.
Time/Cost Trade-off Analysis
Chapter 9: Reducing Project Duration
P&ID’s PIPING & INSTRUMENTATION DIAGRAMS.
Linear Scheduling Method Definition A simple diagram to show location and time at which a certain crew will be working on a given operation.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
Time-Cost Trade-Off (Time Reduction = Time Compression) (Time Shortening) Time-Cost Trade-Off (Time Reduction = Time Compression) (Time Shortening)
Scheduling CTC-415. Short Interval Scheduling Plan & manage day to day activities Focus on individual activities Goal Oriented to get activity done Two.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall8-1 Cost Estimation and Budgeting.
Unit 2: Supply, Demand, and Consumer Choice 1. Review 1. What is the law of demand? 2.
20 The Costs of Production Economic Costs Economic Cost / Opportunity Cost –the measure of any resource used to produce a good is the value or worth.
Production Function Multiple Variable Input  The 3D production function can be compressed into a set of isoquants plotted in a 2D (K,L) space.  An isoquant.
Resource Planning CTC-415. Resource Scheduling Need to have adequate –Labor –Materials –Equipment –To do project Network schedule must be developed around.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
 Delay in project implementation invariably results in cost- overrun.  Delayed project implementation means delay in getting return on investments made.
TOPIC-6- TIME-COST TRADE OFF
Scheduling. Putting the activities in chronological order –Chicken or the egg Allows the PM to determine the time required to complete a project.
Scheduling CTC-370. Value Engineering Provides alternatives to the proposed design –Save Owner $$ –Must be as good or better than original design –Must.
Economics Unit Three: Supply. Supply Supply refers to the willingness and ability of producers to to offer goods and services for sale – Anyone who provides.
Introduction to OEE (Overall Equipment Effectiveness)
Supply is not just the amount of a certain product… Supply is “the willingness AND ability of firms to produce a given quantity of a good or service at.
1 Planning Change. Painting a Room Select paint 10 days Sand and clean walls 3 days Buy painting supplies 1 day Buy paint 1 day 1 st coat 1 day 2 nd coat.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
3/18/ :47 AM 1 Time-Cost Trade-Off (Time Reduction = Time Compression = Time Shortening)
Project Planning 1. Statement of work: written description of what is to be done 2. All activities are identified. Activity = job that requires labor,
6 Resource Utilization 4/28/2017 Teaching Strategies
Minimum Wage As of July 2009, minimum wage rate is $7.25/hour (non- tipped), tipped $2.13 First attempt for a minimum wage rate was in 1938 ($0.25) 21.
Time-Cost Trade-off Models
Stock Market. How Do Stock Markets Work? Step 1:A client places an order with a broker at an exchange by phone, Internet or in person.
Project Management 6e..
Reducing Project Duration
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Minimum Wage As of July 2009, minimum wage rate is $7.25/hour (non- tipped), tipped $2.13 First attempt for a minimum wage rate was in 1938 ($0.25) 18.
Reducing Project Duration
Costs and Economics of Construction
Supply.
Supply.
Can you see me?.
Lecture 6: Time-Cost Trade-Offs
Supply.
Supply.
Reducing Project Duration
Estimating – PRICING Materials, Equipment, & Labor Workshop
SP & CP கொடுக்கப்பட்டால் இலாபம்/நட்டம் கண்டறிதல்
Supply.
Find profit or loss value
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Given S.P and C.P Find Profit or loss % Start.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Presentation transcript:

Scheduling & Resource Planning CTC-415

Schedule Compression Used to decrease schedule time –At what price? Does cost of compression outweigh liquidated damages or possible profit from next job started early –What are costs? – extra crew, equipment –Benefits – less equipment time on job –How do you reduce time? Increase daily output on activity –Increases costs –Labor & Equipment

How to Compress a Schedule Look at critical path and determine activities which cost the least per day Look for logic revisions which could shorten schedule –Make sure that revisions don’t cause increased costs Painting and flooring can be done concurrently but at a loss of productivity –Keep activity relationships in mind

How to Compress a Schedule Activity Duration Reduction –Activities have a minimum duration IF 2 painters can paint a room in 2 days – how long does it take 4 painters?, 8 painters, 16 painters Setup times and cleanup times are always present –Results in increased costs –Must watch CP to make sure it does not shift

Linear relation – only true to a point Linear with break points Step function shows equip needs Parabolic costs increase as duration decreases Cost vs duration

Indirect costs change with project length –Shortened project reduces indirect costs –Lengthening projects increase in direct costs

How to compress schedule –1. Determine CP –2. Look for cheapest activity on CP and reduce 1 day – check CP (any movement) –3. Go to 2 –4. If multiple CP then must cut activities on all CPs –5. Total cost and days reduced

Example cut 6 days ActivityDaysCost/dayActivityDaysCost/day A2$1200H3$800 B1$600I3$2000 C1$800J4$1500 D3$1000K1 E1$900L2 F4$500M1$700 G2 N1$600

Scheduling Decompression May be able to increase duration of activity and decrease cost –Why? Keep crew busy ahead of schedule and payment slow down to keep handle on $ –How? Look at increasing duration by reducing crew