1 Preconstruction Site investigation, Scheduling, Estimating, and design Preconstruction Site investigation, Scheduling, Estimating, and design Prepared.

Slides:



Advertisements
Similar presentations
Modern Systems Analyst and as a Project Manager
Advertisements

1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
PRESENTATION ON TURNKEY CONSTRUCTION.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
Alternative Project Delivery
Business Research Requests and Proposals
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Systems Analysis and Design 9th Edition
Team work : Jehad Khalaf Ehab Esheach Raed Shehada Khalil Abu Eed Supervisor: Dr. Kamalin Shaat Team work : Jehad Khalaf Ehab Esheach Raed Shehada Khalil.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
PREPARED BY: Mohammed Tanbora SUPERVISED BY: Dr. Kamalain K. Shaat CHAPTER8: Application Of Controls.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
Pre-Construction Phase 1 - Job Site Conditions Work Plan -2.
Introduction -Discussed preparation of the overall plan for the project - as well as its implementation. -The control system quantitatively measures actual.
ESTIMATING By Laith Jacob.
PROCEDURES FOR SELECTING THE CONTRACTOR
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
The Analyst as a Project Manager
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
APPLICATION OF CONTROLS CHAPTER 8 Presenting by : Mustafa Al tayeb Date 21/11/2005.
November 3, 2002CVEN349 - Maxwell1 Procurement and Materials Management Module 6.2 November 3, 2002.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
The Importance of the Qualifications Based Selection (QBS) Process
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
Standards of Practice Course
Construction Project Management
Module 1 Session 1.1 Visual 1 Managing the Implementation of Development Projects Course Overview and Introduction.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
PROJECT MANAGEMENT. A project is one – having a specific objective to be completed within certain specifications – having defined start and end dates.
Company LOGO Introduction To An Example Project Prepared by: Alaa El Shorafa Munther Abdel-Hadi Ahmed El Zinati Shukri El Zaza Dr. Kamaleen Sha’th Supervision.
Project Planning & Control 1 ECCS5209 Project Planning & Control Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lect. 3.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
Specification & Quantities Estimating
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
King Fahd University of Petroleum & Minerals
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
1 Business Communication Process and Product Brief Canadian Edition, Mary Ellen Guffey Kathleen Rhodes Patricia Rogin (c) 2003 Nelson, a division of Thomson.
In the name of Allah the Most Gracious the Most Merciful.
DESIGN PROPOSAL REPORT. Why write a proposal? Basic means of convincing someone to support a project. Important tool for organizing time and resources.
PREPAREDBY: PREPARED BY: Ahmed Al Tayeb Saed Al Qeshawe Tareq Amen Abdalla Syiam SUPERVISED BY: Dr. Kamalain K. Shaat CHAPTER8: Application Of Controls.
Contractor Alternate Design Serving the Public’s Best Interest.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
TOTAL QUALITY MANAGEMENT
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
Construction Management At Risk Process
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Systems Analysis Lecture 5 Requirements Investigation and Analysis 1 BTEC HNC Systems Support Castle College 2007/8.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
CHAPTER 2 SYSTEM PLANNING DFC4013 System Analysis & Design.
Systems Analysis and Design in a Changing World, 4th Edition
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
(Additional materials)
9/18/2018 Bids CONTRACTING Khamis…..
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
FIVE PROJECT PHASES.
Chapter 2 – Review ‘construction management’
Presentation transcript:

1 Preconstruction Site investigation, Scheduling, Estimating, and design Preconstruction Site investigation, Scheduling, Estimating, and design Prepared by : Eng. Asmahan Jubeh Eng. Tahreer Fayyad Eng. Wafaa R. Wafi Eng. Tahreer Fayyad Eng. Wafaa R. Wafi

2 Introduction  This chapter emphasizes the role of PCM in preconstruction planning.  The manager must first understand the designer objectives and operating methods.  He must be expert on the local job site conditions and the area construction practices important to: 1. developing proposed contracted packages. 2. fair cost Estimate. 3. realistic schedules. 4. and value- engineering program.

3  An early work plan for overall project execution is important in creating a team effort among designer, owner, and PCM.  The component parts of project work plan includes: preliminary estimate, summary schedules, work packages, value- engineering program, and construction planning

4 Construction site conditions  The items to investigate on the site are many and varied, these items are the result of many years of experience in managing and estimating construction work.

5  Some of the items that should be investigated are: site description,utilities serving site,building department,labor unions, recommended contracts,materials and methods,equipment rental,climatologically data,other projects,and general appraisal (summary and conclusions to be taken into account during the planning of the program) site description,utilities serving site,building department,labor unions, recommended contracts,materials and methods,equipment rental,climatologically data,other projects,and general appraisal (summary and conclusions to be taken into account during the planning of the program)

6 Foundation and earth work conditions  The knowledgeable construction manager obtain an overall plot plan of the new facility, with the soil report and other information that may be available.  The soil engineer recommend proposed foundation,this information should be confirmed using surface inspection and hand excavation.

7 General planning  By visiting the site the construction manager can see access roads railroads and other factors. This will enable him to choose areas for locating temporary facilities, develop preliminary plan for contractors storage area, allow for existing service utilities, in developing or evaluating bid packages,plan for site security.  CM must continue to be fully informed of the new development in the site and communicate his on site knowledge to the owner and designer.

8 Area construction practice  Investigate the normal method of doing business in the project locale.  Systematically review the local conditions and practices.  The PCM must fit his construction packages to design schedule and also attract qualified contractors.

9 labor costs,productivity,and availability  Numerous relevant facts may be obtained through: 1. Discussion with local contractors and labor union personnel. 2. Inspection of several projects in the area. 3. Determination of labor availability. 4. Collective bargaining agreement for all crafts. 5. Inspection of locally favored methods and materials. key local prices key local prices They can help in comparing alternative methods as well as in making fair cost estimates. They can help in comparing alternative methods as well as in making fair cost estimates.

10 Local contractors   The PCM must prepare a list of qualified interested contractors for each proposed bid package.   This list must be large enough to insure competition, small enough to create significant interest in all bidders.   The best method is to invite only fully qualified bidders to submit proposals.

11 Local contractors Follow   Make meetings with reputable and leading general contractors to accomplish the following: Explain the overall program for the project Review the preliminary procurement schedule Determine the interests of the potential bidders Discuss trade jurisdiction as applied to the particular contractor Obtain required information on previous jobs completed by the contractor.

12   These contractors can offer suggestions for scoping work packages or for using logical methods or materials that can be worth considerable savings to the owner.

13 Other key local contractors  Local chamber of commerce can give economic data, discuss weather, and confirm local business licenses.  Local building department is key factor to successful early start for phased construction program.  Local utilities

14 Establishment of project field office  Ideally, the field office should be established in advance of the award of the first contract.

15 Preliminary estimate  After conceptual design Preliminary estimate can serve to check the design against owner budget.  If design is more alternative concepts can be explored trough value engineering program.  Preliminary estimate: 1. Is necessary for preparing realistic overall project schedule. 2. Bases for cost control

16 Summary schedule Types of Summary schedule: 1. deign and procurement schedule. 2. Construction schedule summarized by individual contracts. 3. Construction schedule summarized by individual facilities.

17 Design and procurement schedules  Schedule for each proposed bid package must be prepared showing the detailed design and specification period, packages review and approval period,bidding period,and evaluation and award period.  This schedule will form the control standard for monitoring actual performance during the planning and design and the procurement phase.

18

19  Reasonable bid periods should be scheduled by the manager, taking in account his knowledge of the present bidding volume in the area.

20 Summary Construction schedules  When Preliminary estimate and design schedule by contract packages have been finalized the CPM precedence diagram can be prepared.  Summary bar chart schedule can be prepared.

21 Work packages  Now the individual can define proper work packages.  Two of many important factors that should influence this process are: 1. Construction economy. 2. Design constraints.

22  A successful phased construction program is wholly dependent upon the care and skill in defining work packages in order to balance economic considerations with completion requirements to achieve maximum overall benefit to the owner.

23 Value-engineering program  Value-engineering program must be enthusiastically accepted and practiced by the owner, designer, and the manager.  The manager's function is to provide an organized program and to stimulate creative analysis during all phases of the program, but especially in planning and design, bidding, and award phases.

24 Conceptual phase  Early in the program, the manager and the designer can explore basic concepts and list possible alternative solutions to produce substantial cost saving.

25 Detailed design phase  Well organized PCM will keep an up to- date book, indexed by the standard architectural specifications sections, alternative materials and methods, cost comparison from previous jobs.  This kind of construction-cost oriented benefits designers to be within budgets.

26 procurement phase  An aften overlooked but important resource for value-engineering savings consists of the bidding contractors themselves.

27 Construction planning  Basic Construction planning during or before the detail design phase will include an organization chart, project staffing schedule, temporary facility requirement of the construction manager, selection of the particular individuals to be assigned, and delineation of their responsibilities.  Complete cost estimate to serve as the manager’s budget can be readily prepared if initial planning is sound.

28 Temporary facilities  An important phase of construction planning is the analyzing of Temporary utilities and general conditions requirements for the project.

29 Procedure outline  Each project is unique.  One of the greatest advantages of PCM program is its flexibility.

30  The manager must assess the conditions and problems as they develop and to react without delay.  The PCM, designer, and owner each must understand the responsibilities and duties of the others.

31 Cash flow requirement  An estimate of the Cash flow requirement for the project can be readily prepared from the Preliminary estimate and from the summary schedule.

32 summary  Planning must be based upon facts if project goals are to be achieved.  To start, the professional construction manager must understand the overall objectives of the owner and must know the overall concepts and operating methods of the designer.

33  However the implementation of the owners objectives and the designers concepts must be done in the particular locality where the project is to be built.

34 Thank you