Energy Recovery System Hadi Fattah Chris Korkuch Scott Lacey Ryan Neary Colin O’Neill.

Slides:



Advertisements
Similar presentations
World Health Organization
Advertisements

Chapter 3. HVAC Delivery Systems
HVAC Basics Bin Yan HVAC – Heating, Ventilation, Air-conditioning.
Energy Efficient Steam Systems
Heating, Ventilating, and Air-Conditioning
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
Heating, Ventilating, and Air-Conditioning (HVAC)
Basic Refrigeration Cycle
Heat Recovery for Commercial Buildings
Heating and Air Conditioning I
Introduction Enthalpy Wheel
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
Energy Efficient Steam Systems. Steam Systems Steam systems most widely used type of process heating Advantages of steam: –Heat carrying capacity of steam.
Break Out Session 3: Group A: Ventilation and Air Quality Chris Cosgrove, Cosgrove FDS, Inc.
Engineer Presentation
Brett Graham Habegger Corporation Midwest Regional Sustainability Summit May 1, 2015.
Best Direction System Ltd.
COMMERCIAL REFRIGERATION
Active beams versus VAV with Reheat Analysis of May 2013 ASHRAE Journal article Ken Loudermilk Vice President, Technology & Developement.
September 18, 2009 Critical Facilities Round Table 1 Introducing the Heat Wheel to the Data Center Robert (Dr. Bob) Sullivan, Ph.D. Data Center Infrastructure.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
HEAT PIPE HEAT EXCHANGERS
Objectives Review thermodynamics
ISAT Module V: Industrial Systems
Conditioning of Moist Air
For Cardinal Newman Hall Randall Lessard ET Fall 2013 Dr. Cris Koutsougeras Advisors: Dr. Rana Mitra Mr. Byron Patterson.
Objectives Learn basics about AHUs Review thermodynamics - Solve thermodynamic problems and use properties in equations, tables and diagrams.
DEA Clandestine Laboratory Training Center Penn State University Architectural Engineering Mechanical Option David M. Potchak.
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
World Health Organization
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
NOVO ETS IMPROVING YOUR ORGANIZATIONS’ ENVIRONMENTAL, HEALTH AND SAFETY PERFORMANCE ENERGY MANAGEMENT IN THE CONTEXT OF GREEN PRODUCTIVITY.
Maintain IAQ with Energy Recovery Ventilators (ERVs) A ENTERPRISE Visit us at INTRODUCTION TO ERV.
CHAPTER 5: Mass and Energy Analysis of Control Volumes
World Health Organization
Objectives Analyze processes in AHU and buildings.
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
1-1-Why Maintenance HVAC ? Increases equipment life & reliability Reduces size & scale & number of repairs Lowers maintenance costs through better.
Final Project Presentation On Monday, same classroom at noon PowerPoint (5 minutes presentation) Upload the file before the class Approximately 6-7 slides.
Principles of Solar Engineering D. Y. Goswami, F. Kreith, J. F. KreiderPrinciples of Solar Engineering Chapter 6: Solar Cooling and Dehumidification Part.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Lecture Objectives: Learn about processes in AHU Swimming pool example Het recovery systems.
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
HEAT-GENERATING EQUIPMENT INTRODUCTION SELECTION EFFICIENCY FURNACES BOILERS CENTRAL HVAC SYSTEMS.
HCB 3-Chap 19A: All-Air Systems_Single Zone 1 Chapter 19A: ALL-AIR SYSTEMS: SINGLE ZONE AND SINGLE DUCT Agami Reddy (July 2016) 1)Introduction and common.
Design & Analysis of Psychrometric Processes Various ways of Generating A Comfort… BY P M V Subbarao Associate Professor Mechanical Engineering Department.
Exhaust Heat Recovery Systems
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
ZONING (see section 17.0) Zoning alternatives Constant Volume (CV)
Doug Jefferson, Business Development Engineer
SEMINAR ON AIR CIRCULATION IN STENTERS
Heat Pipe | Heat Exchanger Manufactured by Manor
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Announcement No project presentations !
Lecture Objectives: Finish HW3 Discussion
New Options for DryCool Products
Energy Efficiency in District Coiling System
Brian Wallingford, Applications Engineer
Voyager II and III – Energy Recovery Modules
The Benefit of Including Energy Recovery System Analysis
Engineering Presentation
HCB 3-Chap 19A: All-Air Systems_Single Zone
Chapter 13B: PSYCHROMETRIC MOIST AIR PROCESSES
CAPRI Cables Private Limited
Objectives Learn about 1) Control for HVAC systems
Announcements Exam 1 Next Class (Thursday, March 14th):
Objective Revie the Cooling Cycle Learn about air distribution systems
Presentation transcript:

Energy Recovery System Hadi Fattah Chris Korkuch Scott Lacey Ryan Neary Colin O’Neill

Overview 1.Project Scope 2.Benchmarking 3.Concept Choice 4.Concept Description 5.Detailed Design 6.Manufacturing and Assembly 7.Prototype Components 8.Operation and Testing 9.Results 10.Analysis 11.Cost of Prototype 12.Cost Savings for Sponsor 13.Conclusion

Project Scope ASHRAE prohibits the recirculation of air in chemistry labs Large amounts of energy are lost Large amounts of money is spent on HVAC Any amount of energy recovered would provide substantial savings Our objective is to find a way to recover energy within ASHRAE standards

Benchmarking Heat pipe –Heat transfer via evaporation, condensation of fluid that moves by negative pressure, gravity and capillary action –No contamination occurs between flows, and the system tends to be 45% - 65% effectiveness. Run-around coil –Indirect heat exchanger of sensible energy between two fluid streams –Effectiveness: 55 to 65%

Benchmarking Enthalpy Wheel –This system consists of a rotary heat exchanger involving the transfer of sensible and latent heat –Small amount of contamination may occur into inlet air stream, but fulfills ASHRAE requirements. –75% effectiveness (highest among its competitors).

Why Enthalpy Wheels? Enthalpy Wheels offer the most efficiency through the simultaneous transfer of latent and sensible energy Heat Pipes and Run around coils do not transfer latent heat

How an Enthalpy Wheel Works Cooling Mode (Summer)

How an Enthalpy Wheel Works Heating Mode (Winter)

Our concept

Detailed design

Manufacturing and assembly

8kW of power Temperature range cfm Powered by three phase 208V, 30A rated socket Heater 0-10V controller for 10 levels of heating (0=off, 10=max) Pitot tube ensures minimum flow rate to prevent burn-up

Steam outlet faces against airflow to maximize effectiveness. Humidifier 8lb/hour steam humidification Shares three phase 208V, 20A rated socket with fan Linked with control panel for automatic humidity regulation.

Provides low cross- contamination between flows (<0.04%) Coated with silica gel for performance Rotates using small electric motor running of regular 120V socket Enthalpy Wheel AirXchange Inc. Model ERC-25 Enthalpy Wheel Provides latent and sensible energy recovery

Capable of 2200 cfm flow rate Controlled by 0 to 60Hz VFD Shares three phase 208V, 20A rated socket with humidifier Fan

0-10V output for temperature and humidity scaled for 0%- 100% RH and 0 – 100 degrees temperature scale Linked to control panel for active readings Installed on inlet and exhaust of enthalpy wheel for both streams Temperature/Humidity Sensors

Mounted (2) sensors in 14” section of metal duct before fan Average flow rate between two sensors outputs to control panel Volume dampers in both streams also installed to even flows by reducing flow area (if needed). Flow Rate Meter

Powered by regular 120V socket Reads temperature, humidity, and flow rates Linked to dehumidifier for automatic humidity control Control Panel

Operation & Testing

Results

Analysis

Cost of prototype Equipment:$13032 Labor: $434 Subcontractors:$4955 Miscellaneous: $115

AstraZeneca Cost Savings Winter (3 months) –Boiler creates steam to heat air –Boiler runs off Natural Gas at $5.40/MMBtu –1 month of operation saves: $111,856 Summer (3 months) –Chiller cools water to cool air –Chiller runs off electricity at $41.40/MWh Estimated yearly savings: $1,125,681

Payback Period by Region

Conclusion Through benchmarking and research, the best concept involved use of an Enthalpy wheel After designing the system in collaboration with MDavis & Energy Transfer Solutions, the prototype was built Experimentation supports expected results of efficiency Cost savings are significant, and the payback period is well within industry standards at 0-2 years.

Acknowledgements Special thanks to John Sorantino and Joe from MDavis & Sons, Mike Haggarty and Dave from Energy Transfer Solutions – without them prototype fabrication would not be possible Thanks to Professor Hartman for all the help and guidance Finally, and most importantly, Thank You to George Sestak and AstraZeneca – for their generous support and for this opportunity.

Questions?