Status Venice, 30-Mar-1-Apr 2009 Philae STW 2009.

Slides:



Advertisements
Similar presentations
Computer System Organization Computer-system operation – One or more CPUs, device controllers connect through common bus providing access to shared memory.
Advertisements

Status update of ASM on Swarm Charlie Swarm 4th DATA QUALITY WORKSHOP 2 December 2014 GFZ Potsdam Jean-Michel Léger.
Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations The planning concept - current status Detlef Koschny Space Science Department ESA/ESTEC.
CS-334: Computer Architecture
Philae Science team meeting. Venezia, March 30, 31, April 1, 2009Palazzo Cavalli Franchetti.
4th Philae Science Workshop, Venice th Philae Science Workshop Venice, 30 March – 1 April ROMAP Status I. Apáthy, U. Auster, G. Berghofer, A.P.
Long Term Science working group status LSWT Venice, 30/03-01/04/2009.
ROLIS status and plans for SDL & FSS W. Bresch S. Mottola R. Schrödter PHILAE Science Team Meeting, Venezia, 31 March 2009.
Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Instrument status Final discussion and wrap-up.
Open Cruise Requirements status and planning LSWT#4, Venice 30/03-01/ LSWT#4.
PHILAE Science Team, Venice LTS phase: the LS standpoint prepared by HBO LTS phase: from end of FSS (mid Nov. 2014) to end of Rosetta mission (31.
Tuesday, March 31Philae Science team meeting Venice March 30 – April 1, 2009 APXS STATUS G. Klingelhöfer (PI) J. Gironés López J. Brückner (Co-I) R. Gellert.
Philae Status and News Venezia; 30 st of March th Philae Post-Launch Workshop.
SDL: MOST point of view CNES / J-F Fronton / D Hallouard LSWT Venice, 30/03-01/04/2009.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
SWT 27/11/ Consert W.Kofman, A. Herique, JP. Goutail, A. Roux.
Mallorca, 1st of February 2005 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 1st of February 2005.
Ptolemy: A report, and future plans D. Andrews, S. Barber, G. Morgan, A. Morse, S. Sheridan, I. Wright, C. Pillinger Ptolemy is the result of a collaboration.
Monitoring systems COMET types MS55 & MS6 MS55/MS6 Configuration.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
System Software Integration Testing Mars Polar Lander Steven Ford SYSM /05/12.
Presented by Emil Melamed
PEMSolutions Technology Training The New Early Warning System.
PACS IBDR 27/28 Feb 2002 SPU High Level Software1 H. Bischof, A.N. Belbachir (TUVIE) F. Kerschbaum, R. Ottensamer, P. Reegen, C. Reimers (UVIE)
Main task  Understanding the physics of planetary near-surface layers, including comets, Mars & Moon Main research topics  Study of the mechanisms controlling.
MERMAG-M/MGF MGF-OS MGF-IS MAST-MGF MAST-SC PWI-SC Credit : RISH, Kyoto Univ.
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
HL-LHC/LARP, QXF Test Facility Workshop– R. Carcagno QXF Test Requirements Ruben Carcagno BNL Workshop December 17, 2013.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
System Integration Testing Requirements Mars Polar Lander Steven Ford SYSM /11/12.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
MUPUS Operations Graz, 24/25-Oct 2013 MUPUS Team Meeting, Graz Oct 2013 G:\MUPUS\THC\PMMG.
SOWG # 6, 20/01/2015 ESAC Agenda  Finalization of the service 20 specifications  Test plans for the service20 at spacecraft level  Instruments.
RELIABILITY ENGINEERING 28 March 2013 William W. McMillan.
Status Graz, 24/25 Oct 2013 MUPUS Team Meeting. 2 LOWG#12, DLR Cologne 18-20th of November 2008 PEN inflight calibration 4  14 inflight calibration points.
19th GIST 27 th -29 th August 2003 E Sawyer RAL Status of GERB1,2,3 and 4 Battery issues Operations during eclipse Stray light NOT bearing life test.
TF5 – Status report on thermal propagation EVS-GTR 9 th IWG meeting Changchun, China 2015/9/17.
GIST 19: GGSPS status Status of GGSPS development and operations Andy Smith GGSPS software project manager.
Boston University Daniel TaylorNima Badizadegan R. Terry BlackPantelis Thomadis.
PHILAE Science Team, Venice Philae On-Comet Science Objectives prepared by HBO Document name = Scientific Objectives of the PHILAE Mission (RO-LAN-LI-1000),
CIVA Status Venezia, Palazzo Cavalli Franchetti March 31, 2009 Philae Science Team Meeting.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 GERB Ground Segment B.C.Stewart RAL.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
Input/Output Problems Wide variety of peripherals —Delivering different amounts of data —At different speeds —In different formats All slower than CPU.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
IT3002 Computer Architecture
Lecture 4 General-Purpose Input/Output NCHUEE 720A Lab Prof. Jichiang Tsai.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Flight Software Summary Peter Harvey Space Sciences.
P. Mokashi IES Team Meeting, SwRI 29 May IES (SwRI) Develop sequences (flight and EQM test) Develop tables, macros and patches if necessary Test.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
SPECIAL FUNCTIONS ON ASDA-A2. To Audience Advance level This slide will teach some special functions on ASDA-A2. For better understanding the content,
ESA Payload Operations Overview: MSL August 07, 2009 / POIC-MSFC.
Week#3 Software Quality Engineering.
RSOC Overview at SWT #26, 11/12 June 2009
OSIRIS operation summary
OSIRIS operation summary
Monitoring systems COMET types MS55 & MS6
Stubbe F. Hviid Team Meeting Sep 2007
SESAME Status, Science goals and On-Comet Activities
OSIRIS operation summary
RLGS Status / LCC B. Pätz, DLR/MUSC.
Philae status 21st Rosetta Science Team meeting
SESAME: Status and On-Comet Science
CONTOUR NGIMS PRE-SHIP REVIEW
Launch and On-orbit Checkout
Francesco Riccobono, Barouch Giechaskiel, Pierre Bonnel
Presentation transcript:

Status Venice, 30-Mar-1-Apr 2009 Philae STW 2009

2 LOWG#12, DLR Cologne 18-20th of November 2008 Main Events with MUPUS participation (since last Philae STW)  PC#8  PC#9  Steins fly-by  Thermal Characterization 2

3 LOWG#12, DLR Cologne 18-20th of November 2008 PC8 Summary  Software Patch V7.2 successfully uploaded  Burned to EEPROM x0000 after verification during PC8  MUPUS worked flawlessly during PC8  3 procedures executed  Active Checkout 1 (basic tests, repetition of PC4)  Active Checkout 2 (performance, revised version of PC4 test)  Inflight calibration (standard checkout procedure)  164 TC‘s send and executed without error  Detailed testing of nearly all MUPUS modes in different configurations  5610 science data packets produced without problems  Active thermal conductivity measurement mode tested first time in flight  Performance improved  ANC-M sampling frequency 47.8 kHz (from 33 kHz)  ANC-T measurements added to ANC mode  PEN and TM calibration (sensitivity loss confirmed) improved

4 LOWG#12, DLR Cologne 18-20th of November 2008 PC8 THC Mode PEN12 heated with 150 mW for 20 minutes

5 LOWG#12, DLR Cologne 18-20th of November 2008 MUPUS PEN calibration  PEN sensors calibrated on ground between -40°C and +50°C  Data of limited quality  Inflight calibration needed to cover low T expected for the comet  Method:  Use Pt-100 in the holder as reference  Assume that PEN tube and holder at the same temperature in equilibrium (before PENEL switched on, justified by TV test with PEN FS)  Interpolate resistance backward in time to start of PENEL preheating (equilibrium)  => R i =R i (T ref ), i=1,2,…,16  5 inflight calibration points between -107°C and -96°C points acquired since PC#6 PEN1 PEN16 TCU-MUPUS-DD Pt-100 PENEL, T=-50°C

6 LOWG#12, DLR Cologne 18-20th of November 2008 Steins Flyby Results  MUPUS worked flawlessly during Steins flyby  4607 science data packets produced during continous MUPUS TEM mode operations for 17 h around CA  No communication problems  Magnetometer measurements disturbed  Temperature rise of PHILAE balcony detected with all MUPUS sensors  Strong gradient after spacecraft flip (especially for ANC-T)  MUPUS inflight calibration data gives consistent PEN temperature readings

7 LOWG#12, DLR Cologne 18-20th of November 2008 THC2 Results 1, PEN temperatures Using only inflight calibration points (linear extrapolation) !

8 LOWG#12, DLR Cologne 18-20th of November 2008 THC2 Results 2 (Calibration comparison) - Most PEN sensors stable since ground calibration in PEN sensors have changed R(T) characteristics

9 LOWG#12, DLR Cologne 18-20th of November 2008 THC2 Results 5 (ANC-T temperatures) - ANC-T temperatures not strongly dependent on E-Box temperature - Differences between ANC-T and TCU-Anchor sensors probably real

10 LOWG#12, DLR Cologne 18-20th of November 2008 THC2 Summary  MUPUS worked flawlessly during THC2  7907 science data packets produced during continous MUPUS TEM mode operations for 75 hours  Strong temperature rise of PHILAE balcony detected with all MUPUS sensors  Highest balcony temperature recorded in flight  MUPUS inflight calibration gives consistent PEN temperature readings  5 PEN sensors changed R(T) characteristics since ground calibration  ANC-T temperatures consistent with TCU anchor sensors  Very useful for improvement of MUPUS calibration ! Thanks to LCC, SONC, and ESA !

11 LOWG#12, DLR Cologne 18-20th of November 2008 Experiment Status for Cruise  ScROP Requests closed  R_LZ021: MUP_8 Repetition of MUPUS PC4 Tests with revised MUPUS SW  R_ LZ023: MUP_13 MUPUS Software patch V7.2  R_LZ095: MUP_12 MUPUS Participation in PHILAE Thermal Characterization tests  Open ScROP Requests  R_LZ022: MUP_10 EEPROM refresh procedure  R_LZ070: MUP_11 MUPUS Participation in PHILAE interference tests  R_LZ071: MUP_15 Test of the MUPUS on-comet first science sequence procedure  R_LZ107: MUP_16 Test of the MUPUS on-comet monitoring procedure  NCR Status  All MUPUS NCR’s closed

12 LOWG#12, DLR Cologne 18-20th of November 2008 Remaining Cruise Activities  PC10 Operations  R_LZ017: MUP_4 MUPUS In-Flight Calibration  R_LZ070: MUP_11 MUPUS Participation in PHILAE interference tests  PC12 Operations  R_LZ017: MUP_4 MUPUS In-Flight Calibration  R_LZ022: MUP_10 EEPROM refresh procedure  R_LZ071: MUP_15 Test of the MUPUS on-comet first science sequence procedure (joint PHILAE test)  R_LZ107: MUP_16 Test of the MUPUS on-comet monitoring procedure (joint PHILAE test)  Lutetia Operations  Preferably as during Steins/THC2 (tbc, ROMAP ?)  PC13 Operations  R_LZ017: MUP_4 MUPUS In-Flight Calibration

13 LOWG#12, DLR Cologne 18-20th of November 2008 MUPUS during SDL  TM calibration during descent (R-SDL-1, MUPUS FOP)  TM has lost sensitivity  Unique opportunity for inflight calibration with undisturbed known background  ANC-M acceleration measurements at touchdown (R-SDL-4)  Starts with pre-trigger (ringbuffer) mode (Interrupts enabled, SST evaluated)  Information from CDMS by SST about selected anchor for firing required at least 100 ms before firing (R-SDL-5)  ECR By MUPUS on CDMS raised 2006, CDMS fulfilled (A. Balasz)  INT4 (hardware) trigger starts sampling with 48 kHz for about 650 ms (1 RAM page, 64 kByte !), Interrupts disabled !  Pre-trigger mode, software checks SST again for either:  safe anchoring => finish ANC mode, start data transmission to CDMS  firing of next anchor, then data transmission to CDMS Read the FOP ! Minimum time (> 0.65 s) needed between two anchor shots to be analyzed !

14 LOWG#12, DLR Cologne 18-20th of November 2008 SDL cont., ANC-T Thermal diffusivity  Extension of MUPUS operation during SDL until at least 1 h after touchdown for ANC-T thermal diffusivity measurement (R-SDL-6)  Deepest thermal properties measurement of a comet !  Combine with Thermal Inertia measurements (one full rotation ~ h) during FSS (keep MUPUS ON for a full rotation of the comet) to save ressources. Read the FOP !

15 LOWG#12, DLR Cologne 18-20th of November 2008 MUPUS during LTS  MUPUS is a longterm experiment aimed at detecting changes in subsurface structure caused by increasing activity  => Landing in an „active region“ (R-LT-2)  Activity is the KEY PROPERTY of a COMET !  MUPUS should be operated whenever feasible during LTS (R-LT-1)  Operation at least once a week for a full rotation (R-LT-3/4)

16 LOWG#12, DLR Cologne 18-20th of November 2008 Scientific activities  MUPUS Team Meeting in May 2009 (Graz)  MUPUS Flight operations (update of FOP)  Thermal properties measurement method  Assessment of reference methods and materials  Definition/Characterization of MUPUS internal standards  Lab experiments + thermal modelling  Improvement of temperature calibration  Thermal modelling + Lab Experiments  Science Themes Inputs  Delivered to Lead Scientists in August 2008  (Minor) update Feb  New approach for thermal modelling of active regions  Moving boundaries, Stefan problem (E. Kührt, N. Gortzas)