RHIC polarized protons – The next decade – Wolfram Fischer 14 May 2010 RSC Meeting, Iowa State University.

Slides:



Advertisements
Similar presentations
1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
Advertisements

APEX Report April 28-29, 2009 May 4, 2009 Fulvia Pilat Time Meeting, May
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
RHIC shut-down work 2011 Wolfram Fischer 18 October 2011 RHIC Planning Meeting.
Electron and Ion Spin Dynamics in eRHIC V. Ptitsyn Workshop on Polarized Sources, Targets and Polarimetry Charlottesville, VA, 2013.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
APEX Report: March 31 – April 1, 2009 Fulvia Pilat Time Meeting, April 7, 2009.
Loss maps of RHIC Guillaume Robert-Demolaize, BNL CERN-GSI Meeting on Collective Effects, 2-3 October 2007 Beam losses, halo generation, and Collimation.
Internal target option for RHIC Drell-Yan experiment Wolfram Fischer and Dejan Trbojevic 31 October 2010 Santa Fe Polarized Drell-Yan Physics Workshop.
September 12, 2013 PSTP 2013 G. Atoian a *, V. Klenov b, J. Ritter a, D. Steski a, A. Zelenski a, V. Zubets b a Brookhaven National Laboratory, Upton,
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
Wolfram Fischer1 2 superconducting 3.8 km rings 2 large, 1 small experiments 100 GeV/nucleon Au 250 GeV polarized protons Performance defined by 1. Luminosity.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC present status, and plans Wolfram Fischer 12 May 2011 Opportunities for Drell-Yan Physics at RHIC, BNL.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
The Relativistic Heavy Ion Collider high-intensity polarized H - ion source The Relativistic Heavy Ion Collider high-intensity polarized H - ion source.
Thomas Roser 2 nd Electron-Ion Collider Workshop March 15-17, 2004 Ion Polarization in RHIC/eRHIC M. Bai, W. MacKay, V. Ptitsyn, T. Roser, A. Zelenski.
Overview of RHIC Injector Oct. 5, 2015 Haixin Huang MEIC 2015.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Polarized beam in RHIC in Run Polarimetry at RHIC A.Zelenski, BNL PSTP 2011, September 13, St.Petersburg.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
ERHIC Conceptual Design V.Ptitsyn, J.Beebe-Wang, I.Ben-Zvi, A.Fedotov, W.Fischer, Y.Hao, V.N. Litvinenko, C.Montag, E.Pozdeyev, T.Roser, D.Trbojevic.
1 RHIC Run-15 p-p Head-on beam-beam compensation Wolfram Fischer, Xiaofeng Gu (liaison physicist), S.M. White, Z. Altinbas, D. Bruno, M. Costanzo, J. Hock,
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
October 4-5, Overview of ARRA funded AIPs at C-AD Wolfram Fischer October 4, 2010.
ERHIC with Self-Polarizing Electron Ring V.Ptitsyn, J.Kewisch, B.Parker, S.Peggs, D.Trbojevic, BNL, USA D.E.Berkaev, I.A.Koop, A.V.Otboev, Yu.M.Shatunov,
ERHIC design status V.Ptitsyn for the eRHIC design team.
BROOKHAVEN SCIENCE ASSOCIATES Electron Cooling at RHIC Enhancement of Average Luminosity for Heavy Ion Collisions at RHIC R&D Plans and Simulation Studies.
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Polarized source upgrade. Source upgrade project Main component delivery: Atomic Beam Source- August 2011 Superconducting solenoid- March-2012.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
Vladimir Litvinenko, APEX Workshop 11/02/20006 IBS suppression lattice Mei Bai, Joanne Beebe-Wang, Peter Cameron, Roger Connolly, Angelika Drees, Alexei.
Prospects for RHIC Low-Energy Operations Todd Satogata (W. Fischer, T. Roser, A. Fedotov, N. Tsoupas, M. Brennan, C. Montag, and others) “Can We Discover.
09-21 Study of bunch length limits Goals: To identify and observe effects which put limits on the minimum bunch length in RHIC. Try to distiguish the limitation.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
RHIC polarized source upgrade. A.Zelenski, BNL. Workshop on high–energy spin physics, IHEP, Protvino, September 1983 Workshop on high–energy spin physics,
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
Accelerating Polarized Protons to High Energy Mei Bai Collider Accelerator Department Brookhaven National Laboratory.
Six-dimensional weak-strong simulations of head-on compensation in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
RHIC 250 GeV Polarized Proton Run 2009 Mei Bai RUN website: 12/16/2008RHIC Spin Collaboration Meeting.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
P OSSIBILITIES FOR MAINTAINING AA AND PP CAPABILITIES IN PARALLEL WITH E RHIC V. Ptitsyn Collider-Accelerator Department BNL RHIC and AGS Users Meeting,
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
RHIC Status and E-lens 101 Spin Collaboration Meeting V. Schoefer 2/6/2015.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
Status of RHIC Polarization Studies. Summary of Polarization Studies during Run09 Tune scans: – Nearby 0.7 – Near integer tune Polarization ramp measurement.
Electron lens studies in support of RHIC / LHC Wolfram Fischer 28 July 2010 Fermilab Accelerator Advisory Committee Meeting.
AGS FY11 Summary RHIC Spin Collaboration Meeting 5/6/11.
APEX Status and Plan Phil’s Meeting, March 20, 2012 M. Bai.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
Operation Notes APEX Status Fulvia Pilat Machine Experiments Meeting January 20, 2009.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
Acceleration of Polarized Protons and Deuterons at HESR/FAIR
eRHIC with Self-Polarizing Electron Ring
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
LHC (SSC) Byung Yunn CASA.
Proposal for a CESR Damping Ring Test Facility
Another Immortal Fill….
Presentation transcript:

RHIC polarized protons – The next decade – Wolfram Fischer 14 May 2010 RSC Meeting, Iowa State University

Content 1.Run-9 performance (short) 2.Run-11 upgrade plans and projections (short) 3.Longer-term upgrade plans Polarization Luminosity Energy Wolfram Fischer2

Run-9 polarized protons 250 GeV First colliding beam operation at 250 GeV Upgraded CNI polarimeter Magnet re-alignment near snakes LEBT/MEBT modification (  25% smaller emittance in RHIC) Improved nonlinear chromaticity correction Test of 9 MHz acceleration rf system Triplet 10 Hz cold mass measurements 100 GeV First test of AGS horizontal tune jump system Test of new low level rf system Tests of spin flipper All RHIC service buildings with A/C Operational use of 10- and 12-poles (Yellow beam lifetime) Wolfram Fischer3

4 Luminosity and polarization goals Parameterunit AchievedEnhanced design Next L upgrade p  - p  operation (2009) (  2011/12)(  2014) Energy GeV 100 / No of bunches … 109 Bunch intensity / / Average L cm -2 s / 5530 / Polarization P % 55 / 3470 Had previously a goal of 60 here. (May reach 60 with source upgrade and electron lenses).

Run GeV p  -p  Run Coordinator: M. Bai Wolfram Fischer5 First collider operation with polarized protons at 250 GeV P = 34% (H-jet online)

Run GeV p  -p  Run Coordinator: C. Montag Wolfram Fischer6 Little progress compared to Run-6 / Run-8 - L peak higher by up to 40% (lower  and  * ) - DOES NOT lead to increased L avg P = 55% (H-jet online)

RHIC calendar time in store Wolfram Fischer7 goal After improvements in Run-8, time in store fell back in Run-9. Should assume 55% on average for future runs. expectation

Main limits for p  -p  performance and possible solutions 1.AGS : proton bunches with high intensity, high polarization and low emittance  polarized source upgrade (under way)  AGS horizontal tune jump system (tested in Run-9 and Run-10) 2.RHIC: polarization transmission to 250 GeV  acceleration near 2/3 resonance (tested in Run-10) 3.RHIC: intensity transmission to 250 GeV  beam dump system modifications (thicker beam pipe in dump)  Yellow ramp transmission (9 MHz rf system) 4.RHIC: peak luminosity and luminosity lifetime  reached lower  * limit at 100 GeV (not necessarily a problem at 250 GeV)  electron lenses allow for larger beam-beam parameter Wolfram Fischer8

Polarized source upgrade – A. Zelenski 3-year capital project (started in FY 2009) Goals: 1. H-ion beam current increase to 10mA (order of magnitude) 2. Polarization to 85-90% (  5% increase) Upgrade components: 1. Atomic hydrogen injector (collaboration with BINP Novosibirsk) 2. Superconducting solenoid 3. Beam diagnostics and polarimetry Wolfram Fischer9

RHIC OPPIS produces reliably mA polarized H - ion current. Polarization at 200 MeV: P = 80-85%. Beam intensity (ion/pulse) routine operation: Source H - /pulse Linac - 5∙10 11 AGS ∙ RHIC - 1.5∙ GHz ECR source used for primary proton beam generation source was originally developed for dc operation 10x intensity increase was demonstrated in a pulsed operation by using a very high-brightness Fast Atomic Beam Source instead of the ECR source Optically Pumped Polarized H – source at RHIC – A. Zelenski

The ECR primary proton source replacement with the very high- brightness Fast Atomic Beam Source. Atomic H injector development in collaboration with BINP, Novosibirsk. New superconducting solenoid (3.0 T long flattop). He – ionizer cell serves as a proton source in the high magnetic field. H+H+ H0H0 H-H- H0H0 H+H+ OPPIS upgrade with Fast Atomic Beam Source – A. Zelenski

He – ionizer cell serves as a proton source in the high magnetic field. H+H+ H0H0 H-H- H0H0 H+H+ The source produces ~ 3 A ! (pulsed) proton current at 5.0 keV. ~ 10 mA H- current, P = 85-90%. ~ 300 mA (high-brightness) unpolarized H - ion current. OPPIS upgrade with Fast Atomic Beam Source – A. Zelenski

Polarized protons from AGS Wolfram Fischer13 Courtesy H. Huang Intensity dependent polarization in AGS in Run-6 and Run-9 AGS horizontal tune jump system: first test in 2009, Tests in 2010: Better understanding of emittance growth mechanism (  -beat) ®up to 5% more polarization Working on orbit feed forward for better reproducibility.

RHIC polarization transmission to 250 GeV Wolfram Fischer14 Courtesy M. Bai At current working point limited tune space between 2/3 (beam loss) and 7/10 (polarization loss) on ramp. Need to test acceleration closer to 2/3 in Run-10 with Au. (Near integer WP less promising at this point.)

RHIC polarization transmission to 250 GeV Wolfram Fischer15 Test with Au beam in Run-10 (M. Bai et al.) Successful acceleration with  Q =  Q = corresponds to >90% polarization transmission. Simulations started to compare DA of Au lattice 2010 with proton lattice for 2011 (Y. Luo, X. Gu).

Beam dump Problem: Quenched Q4 after beam dump several times with high intensity beam close to 250 GeV beam energy (also with Au beam recently) Simulations by K. Yip, with L. Ahrens: Increase of kick strength by 20% (6 th kicker module) should allow 20% increase in intensity Replacement of dump beam pipe should allow 100% increase in intensity Summer 2010 shut-down: Will install new beam pipe in dump (2x thicker) Wolfram Fischer16

RHIC Yellow ramp transmission Wolfram Fischer17 Ramp transmission [%] Sharp drop in Yellow ramp transmission for  150  p Better transmission for same intensity in fewer bunches suggest electron clouds as contributing mechanism (V. Schoefer, APEX09), can be mitigated with 9 MHz rf, and in-situ coating.

Further upgrades for p  -p  performance Orbit control on ramp (global, ~1 Hz)  reduces number of lost ramp during development at store slow (global, ~1 h, 24 h vertical movement)  tighter tolerances at 250 GeV (IP, collimators) at store fast (global, 10 Hz, triplet vibrations)  reduces parameter (e.g. tune) modulation 9 MHz rf system requires upgrade of RMMPS flattop-to-ramp switches, and independent Blue and Yellow longitudinal dampers  preserves longitudinal and transverse emittances better on ramp, mitigation of Yellow intensity ramp transmission limit Polarimetry CNI polarimeter (rate dependence, setup time) additional polarimeter in IP10 with collision  * reduction to 0.5 m (perhaps 0.35 m) requires improvements in lattice corrections Wolfram Fischer18

Further upgrades for p  -p  performance Spin flipper need modifications to eliminate global effects (installed in Run-10) Collimation efficiency studied with simulation move of collimator to IR12 (G. Robert- Demolaize, A. Drees) – gain not very large, alternatively study additional masks in experimental IRs Electron lenses increase of beam-beam parameter – now at limit (  =0.007/IP) In-situ beam-pipe coating for lower SEY(R&D) A. Hershkovich working with company (SBIR)  high risk R&D, but would reduce all e-cloud phenomena Maintain/improve reliability periodic review and upgrades based on observed failure statistics and expected end-of-life failures  expect 55% of calendar time in store in future run (on average) … Cooling at store energy (CeC R&D – V. Litvinenko) Wolfram Fischer19

Orbit control – global orbit feedback (~1 Hz) Wolfram Fischer20 M. Minty et al., IPAC10 Global orbit feedback successfully demonstrates (at store and on ramp) Allows for faster ramp development, better ramp and store orbit maintenance with diurnal orbit changes.

10 Hz global orbit feedback – R. Michnoff et al. Wolfram Fischer21 Expect improvements in luminosity lifetime. [Necessarily of near-integer working point.] March 24, 2010 Feedback OFF Feedback ON IR6 and IR8 Blue Q1 and Q3 horizontal BPM measurements with 10 Hz feedback ON vs. OFF (31.2 GeV Gold) Position in triplet [  m]

Spin flipper – M. Bai et al. Wolfram Fischer22 AC and DC dipoles worked as expected Coherent oscillation of Blue beam was global and had effect on Yellow beam Tested orbit effect in Run-10 (successful)

Electron lenses in RHIC Wolfram Fischer23 e-beam p-beam Additional head-on beam-beam collision with electron beam can partially compensate beam-beam effect from other proton beam. 2 electron lenses are under construction goal of 2x luminosity increase together with source upgrade plan to start using in Run-13

Electron lenses in RHIC Wolfram Fischer 24 6D beam lifetime simulation of electron lens (Y. Luo, IPAC10) N b = 3x10 11 without and with e-lens Simulations show full benefit of e-lens for N b > 2x10 11 (i.e. with source upgrade) Beam lifetime simulations are challenging – Require good model and supercomputer

R&D for in-situ coating of arc beam pipes Electron clouds limit proton emittance at injection, ramp transmission (Yellow) Warm parts are largely coated with NEG Cold arcs are stainless steel, not coated  Need in-situ coating for arcs Wolfram Fischer25 R&D for magnetron mole Test tube coated with Cu A. Hershkovich et al. IPAC10

Energy increase by 30% (325 GeV) Wolfram Fischer26 30% increase in energy (to 325 GeV) appears possible M. Anerella et al., NIM A 499 (2003). Arc dipoles have margin Arc quadrupoles have even larger margin Triplets have less margin 6500 A

Energy increase by 30% (325 GeV) Wolfram Fischer27 Previous study, also looked at this for eRHIC (V. Ptitsyn) Upgrades needed to: Main magnet PS Transformers for main magnet PS Current leads … Operation may require: Crossing angle of 2 mrad Relaxation in  * Working on definite study – should balance cost with luminosity need. Luminosity guidance helpful.

Wolfram Fischer28 Luminosity and polarization goals Parameterunit AchievedEnhanced design Next L upgrade p  - p  operation (2009) (  2011/12)(  2014) Energy GeV 100 / No of bunches … 109 Bunch intensity / / Average L cm -2 s / 5530 / Polarization P % 55 / 3470 Had previously a goal of 60 here. (May reach 60 with source upgrade and electron lenses).

Run-11 p  -p  luminosity projections 100 GeV Wolfram Fischer29 Expect store polarization of 50-65%, and average store luminosity of up to 30  cm -2 s -1. [Projections update 11 May 2010.]

Run-11 p  -p  luminosity projections 250 GeV Wolfram Fischer30 Expect store polarization of 35-50%, and average store luminosity of up to 100  cm -2 s -1. [Projections update 11 May 2010.]

Spin plan update projections Wolfram Fischer31 Spin plan update, 06/09/2008 [Assumes 10 week p  -p  operation every year.]

RHIC 5-year outlook polarized protons Wolfram Fischer32 [Assumes 12 week p  -p  operation every year.] acceleration near 2/3 AGS tune jump, 9 MHz, dump pipe,  * **  *, 56 MHz SRF source upgrade, e-lenses  *, collimation

Summary Planned upgrades for Run-11: AGS horizontal tune jump system, acceleration near Q v = 2/3, Beam dump, 10 Hz orbit feedback, 9 MHz rf system, Polarimeter, Spin flipper Goals (  2014): For 100 GeV: 60  cm -2 s -1, P = 70% (needs functioning e-lenses) For 250 GeV: 300  cm -2 s -1, P = 70% Main upgrades: AGS polarization transmission 9 MHz rf system Polarized source upgrade 56 MHz SRF system Electron lenses In-situ coating Wolfram Fischer33