Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok PROJECT PLAN REVIEW September 26, 2000.

Slides:



Advertisements
Similar presentations
Ashley Brawner Neelam Datta Xing Huang Jesse Jones
Advertisements

SAE Aero Design ® East 2005 University of Cincinnati AeroCats Team #039 SAE Aero Design ® East 2005 University of Cincinnati AeroCats Team #039 Design.
AAE 451 Aircraft Design Aerodynamic Preliminary Design Review #2 Team Members Oneeb Bhutta, Matthew Basiletti, Ryan Beech, Mike Van Meter.
DR2 Aerodynamic PDR II Aerodynamic Preliminary Design Review II “The 20 Hour Marathon” October 19, 2000 Presented By: Loren Garrison Team DR2 Chris Curtis.
Vertical Launch UAV Project Plan. ∞ Construct an unmanned aerial vehicle (UAV) with a camera payload ∞ UAV must autonomously navigate with real-time video.
Lab 01: AEV Project Introduction Advanced Energy Vehicle (AEV)
Guidelines Presentation. Aircraft Aim & Judging The aircraft needs to transport the mirror segments of the ESO European Extremely Large Telescope, being.
David Chandpen (Lead Engineer) Matthew Maberry Travis Cushman Benjamin Waller Zach Veilleux Joseph Travaglini.
Keith Hout Patrick Dempsey Bridget Fitzpatrick Heather Garber Jong Soo Mok Stability Control and Flight Performance PDR October 24, 2000.
Project Presentation Boiler Xpress December 5, 2000 Team Members Oneeb Bhutta Matthew Basiletti Ryan Beech Micheal Van Meter AAE 451 Aircraft Design.
AAE 451 Aircraft Design Aerodynamic Preliminary Design Review #1
PROPULSION PDR#1 Brian Barnett Rob Benner Ryan Srogi John Keune Alex Fleck.
AME 441: Conceptual Design Presentation
DR2 Presented by: Mark Blanton Loren Garrison Chris Peters Jeff Rodrian September 26, 2000 Chris Curtis.
Aerodynamics PDR #1. Objective To examine airfoil choices To examine wing shape choices Structural and Manufacturing Concerns.
Project Status Update II R09230: Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems A. Benjamin Wager (ME) B. Michael Skube (ME)
Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 1.
DR2 Stability and Control Preliminary Design Review and Performance PDR October 24, 2000 Presented By: Christopher Peters …and that’s cool Team DR2 Chris.
Vehicle Sizing PDR Presented by: Mark Blanton Chris Curtis Loren Garrison September 21, 2000 Chris Peters Jeff Rodrian DR2.
Project Plan Review Brian Barnett Rob Benner Alex Fleck Ryan Srogi John Keune.
Final Design review December 5, 2000
Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok AAE451 Aircraft Design Professor Dominick Andrisani First Flight November 21,
Team 5 Aerodynamics QDR Presented By: Christian Naylor Charles Reyzer.
March 22, Prototype Fabrication Economic & Test Plan QDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew.
Fundamentals of Flight
Michael DeRosa Master of Engineering Final Project
SAE Aero Design ® East 2005 University of Cincinnati AeroCats Team #039 SAE Aero Design ® East 2005 University of Cincinnati AeroCats Team #039 Design.
ELEMENT OF AERONAUTICS
Dynamic Modeling PDR 17 October, 2000 Keith R. Hout Patrick Dempsey Bridget Fitzpatrick Heather Garber J.S. Mok.
Replicating the 1903 Wright Flyer
Team “Canard” September 19th, 2006
Dane Batema John Tapee Audrey Serra Patricia Roman Kyle RyanCarlos Vergara Benoit BlierDrew Capps Team 1: Lessons Learned and Vehicle Summary Team “Canard”
Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok Preliminary Sizing PDR 26 September, 2000.
The Lumberjacks Team /16/12 Brian Martinez.
Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok Propulsion Preliminary Design Review #2 October 17, 2000.
Project Plan Review Boiler Xpress Oneeb Bhutta Ryan Beech Matt Basiletti Mike VanMeter.
How To Use XFLR5.
1 Lecture 4: Aerodynamics Eric Loth For AE 440 A/C Lecture Sept 2009.
AAE 451 Aircraft Design First Flight Boiler Xpress November 21, 2000
Bridget Fitzpatrick Patrick Dempsey Heather Garber Keith Hout Jong Soo Mok Aerodynamics Preliminary Design Review #2 October 23, 2000.
AAE 451 AERODYNAMICS PDR 2 TEAM 4 Jared Hutter, Andrew Faust, Matt Bagg, Tony Bradford, Arun Padmanabhan, Gerald Lo, Kelvin Seah November 18, 2003.
DR2 Aerodynamic PDR Aerodynamic Preliminary Design Review October 3, 2000 German National Holiday Presented By: Loren Garrison Team DR2 Chris Curtis Chris.
Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok Aerodynamics Preliminary Design Review #1 October 3, 2000.
DR1 PF, E, & FTP PDR Prototype Fabrication, Economic and Flight Test Plan Preliminary Design Review October 26, 2000 Presented By: Mark Blanton & Chris.
RIT MAV System Review (P08121) Dr. Jeffrey Kozak – Faculty Guide Michael Reeder – Team Leader Kevin Hand – Lead Engineer Todd Fernandez – ME.
Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok Structures Preliminary Design Review #1 October 12, 2000.
Yaqoub Almounes John Cowan Josh Gomez Michael Medulla Mohammad Qasem
Vehicle Sizing AAE 451: Team 2 Michael Caldwell Jeff Haddin
SAE Aero 2017 Midterm Presentation Joe Zongolowicz, Nick Montana, Frank Dixon, Kevin Scheventer, Kathy Hansen, Marquis Ward, Gerald Short, Zhangsiwen Xiao,
SAE Aero 2017 Status Update Joe Zongolowicz, Thomas Houck, Kathy Hansen, Gerald Short, Marquis Ward, Zhangsiwen Xiao, Coleman Gordon, Kevin Scheventer,
Propulsion Preliminary Design Review #1
Dynamics & Controls PDR 1
SAE AERO 2017 Joseph Zongolowicz, Kathy Hansen, Nick Montana, Marquis Ward, Frank Dixon, Thomas Houck, Gerald Short, Zhangsiwen Xiao, Kevin Schesventer,
Propulsion QDR 2 Team #3 Presented by: Greg Davidson Etan Karni.
PROPULSION PDR 2 AAE 451 TEAM 4
Team 5 Propulsion PDR Scott Bird Mike Downes Kelby Haase Grant Hile
Project Plan Review Team “Canard” September 14th, 2006 Team 1:
Team 5 Vehicle Propulsion PDR 1
Team 5 Vehicle Propulsion PDR 1
Aether Aerospace AAE 451 September 27, 2006
Team “Canard” September 19th, 2006
UAV Wing Design For Efficiency At Low Reynolds Numbers
Prototype Fabrication, Economic, & Test Plan QDR
Team 5 Aerodynamics PDR #2
Team 5 - Propulsion PDR #2 Scott Bird Mike Downes Kelby Haase
Aerodynamics PDR # 2 AAE451 – Team 3 November 18, 2003
Team 5 Aerodynamics QDR #1
Aether Aerospace AAE 451 September 19, 2006
Prototype Fabrication, Economic and Flight Test Plan PDR
Dynamics N Controls 1 PDR
Presentation transcript:

Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok PROJECT PLAN REVIEW September 26, 2000

PROPULSION Critical Dates: 26 SEP- Motor choice complete - Historical database complete -Gearbox/controller selected 27 SEP- Propeller geometry compiled -Basic aerodynamic propeller components calculated 28 SEP- Propulsion PDR #1 13 OCT- Wind tunnel propeller test/ motor test complete 14 OCT- Propeller geometry finalized 17 OCT- Propulsion PDR #2 Equipment Needed: -Wind tunnel -Test stand for motor -Propeller pitch gage Purchase Estimates: -Electric motor/gearbox/controller -$380 -Propellers -$20

AERODYNAMICS Critical Dates: 30 SEP- Airfoil selection (wings, vertical tail, horizontal tail) complete CL, Clmax, Drag Polar complete 02 OCT- XFOIL analysis complete, CMARC/ PMARC analysis initialized 03 OCT- Aerodynamic PDR #1 14 OCT- CMARC/ PMARC analysis complete 19 OCT- Aerodynamic PDR #2 Design Tools Utilized: XFOIL CMARC PMARC

STRUCTURES Critical Dates: 01 OCT- Geometry wing, spars, rib location complete 02 OCT- Material properties compiled 03 OCT- Theoretical structural analysis complete 05 OCT- Structures and Weight PDR 11 OCT- Begin building wing box for testing 16 OCT- Structures tests complete Equipment Needed: -Modeling tools Purchase Estimates: -Building material-$ Covering-$60.00

DYNAMIC MODELING Critical Dates: 06 OCT- Dynamic modeling analysis complete 12 OCT- Dynamic modeling PDR Design Tools Utilized: Matlab

BUILD and TEST Critical Dates: 08 NOV- Plane built 14 NOV- Flight readiness checks complete 16 NOV- Modelers flight readiness checks 19 NOV- Modification from readiness checks complete 21 NOV- Official first flight

DESIGN REPORTS and PRESENTATIONS Critical Dates: 19 OCT- Thiokol Design Report rough draft complete 26 OCT- Thiokol Design Report due 29 OCT- Critical Design Review presentation complete 31 OCT- Critical Design Review presentation 02 DEC- Design Report finalized and ready for review 03 DEC- Summary Project presentation complete 05 DEC- Summary Project presentation 08 DEC- Thiokol Final Design Report due