GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.

Slides:



Advertisements
Similar presentations
Understanding the Requirements Qimpro Standards Organization
Advertisements

Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
How ISO9001 Compares with CMM Mark C. Paulk JAN,1995 CMM version 1.1 ISO9001 July 1994 presented by Zhilan Zhou.
First Article Inspection Report
EPSON STAMPING ISO REV 1 2/10/2000.
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
ISO 9000 Certification ISO 9001 and ISO
4. Quality Management System (QMS)
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
4. Quality Management System (QMS)
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
Introduction to Software Quality Assurance (SQA)
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
From Research Prototype to Production
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
10/14/ :25:29 PM ISSP On-Orbit QA To share with QLF the ISS approach to the On-Orbit Quality Assurance process and the current status NASA QLF
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
LSST Camera CD-3 Review Brookhaven National Laboratory, Brookhaven, NY LSST Safety Council Camera Review Bremerton, WA 2015 LSST Camera Environment,
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Accelerator Readiness Review October 31, 2006
THEMIS Mission Assurance
Software and System Delivery
0.0 Instrument Suite Name Presenter’s name
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Thermal Vacuum Test: Plans and Procedures
ISSP On-Orbit QA To share with QLF the ISS approach to the On-Orbit Quality Assurance process and the current status NASA QLF
Integration and Test Organization Chart
First Article Inspection
Integration and Test Organization Chart
PSS verification and validation
GLAST Large Area Telescope:
DOE Review of the LCLS Project October 2006
DOE Review of the LCLS Project 7-9 February 2006
Presentation transcript:

GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator Center Performance & Safety Assurance Manager (650) Gamma-ray Large Area Space Telescope

GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 Performance Assurance Activities LAT Mission Assurance Requirements (MAR) Status -LAT MAR dated October 26, 2000 is still currently the baseline MAR -“Phase C/D/E” MAR (revised MAR) in negotiation -Primary changes involve Chapter 4, Design Verification and the addition of flight software deliverables LAT EEE Parts, Materials and Processes Issues -LAT EEE Parts and Materials and Processes Lists will be submitted to GSFC middle of April -Any additional submissions to these lists must be provided to Jeff Tice (materials) or Nick Virmani (EEE parts) -All fasteners must comply with the procurement documentation and test requirements for flight hardware and critical ground support equipment fasteners contained in 541-PG , GSFC Fastener Integrity Requirements -EEE parts must have parts stress analyses performed (MAR par ) for conformance with the applicable derating guidelines

GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 Performance Assurance Activities (Con’t.) Procurement quality assurance -Quality Clauses are required in all flight hardware contracts and requisitions -Ensure that appropriate quality requirements are included in all procurements of flight hardware/software and critical GSE -All flight hardware shall have a receiving inspection -Assure all required traceability documentation accompanies hardware -Assure proper storage and control of flight hardware -Enable detection of hardware discrepancies -Only qualified providers are utilized for products and services that will be used for flight hardware -QA shall perform supplier, partner, and subcontractor surveys when necessary

GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 Verification Planning LAT Program Instrument Performance Verification Plan, LAT- MD-00408, Systems Performance Assurance (Section 6), delineates the processes and procedures for verification and test of LAT hardware and software -Required Documentation -Configuration Management -Configuration Item Tracking -Quality Assurance Provisions -Safety -Test Equipment -Test Performance Requirements

GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 Verification Test Planning (Con’t.) Systems Engineering shall assure that all flight hardware/software requirements are identified and adequately flowed down and tested -A test matrix is generated which relates all explicit and derived hardware/software requirements to the specific test phase/method which will validate it -Subsystems managers are responsible for subsystem verification and test procedure matrix ▪Test procedures must be developed for each test activity -System Engineering is responsible for instrument test and procedure matrix ▪I&T is responsible for developing instrument level test procedures -Quality Assurance/Systems Engineering shall verify the traceability matrix is complete and accurate

GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 LAT Test Procedure Matrix

GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 Verification Testing Deliverables Title: Performance Verification Procedure CDRL No.: 331 Reference: MAR Section Use: Describes how each test activity defined in the Verification Plan will be implemented Place/Time/Purpose of Delivery: 15 work days prior to the start of the testing for GSFC approval. LAT Instrument Thermal Vacuum Balance Test Plan- 90 days prior to testing Preparation Information: Describe the configuration of the tested item and the step-by-step functional and environmental test activity conducted at the unit/component, subsystem/instrument, and payload levels. Give details such as instrumentation monitoring, facility control sequences, test article functions, test parameters, quality control checkpoints, pass/fail criteria, data collection and reporting requirements. Address safety and contamination control provisions. A methodology will be provided for controlling, documenting and approving all activities not part of an approved procedure and establish controls for preventing accidents that could cause personal injury or damage to hardware and facilities.

GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 Verification Testing Deliverable (Con’t) Title: Verification Reports CDRL No.: 332 Reference: MAR Section Use: Summarize compliance with system specification requirements and/or provide a summary of testing and analysis results, including conformance, nonconformance, and trend data. Place/Time/Purpose of Delivery: Verification Reports: Preliminary - 5 work days after testing for GSFC information Final - 30 days after verification activity for GSFC information LAT Instrument Thermal Vacuum Balance Test Plan- 90 days prior to testing Instrument Performance Verification Report: Preliminary - At PER for GSFC information Final - 30 days following on- orbit check out for GSFC information Preparation Information: Verification Report: Provide after each unit/component, subsystem/instrument, and payload verification activity. For each analysis activity the report will describe the degree to which the objectives were accomplished, how well the mathematical model was validated by the test data, and other significant results. Instrument Performance Verification Report: Compare hardware/software specifications with the verified values (whether measured or computed). It is recommended that this report be subdivided by subsystem.

GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 Hardware Certification – End Item Data Package Identification -Unit identification (drawing or part number number with revision level) -Unit serial Number -Date and time of release for delivery -Responsible engineer approval -Quality assurance certification (as required) -Other approvals as necessary Mechanical Summary Data -Mass -CG -Dimensions -Interface Flatness Electrical Summary Data -Power consumption (steady state, idle, peak) -Start-up voltage profile -Start-up current profile -Noise Measurement -Steady state -Minimum power -Maximum power Unit Performance Data (as required and applicable) Unit Support Data -Thermistor calibration curves -Software version report -Hardware installation record -Mate/de-mate log -On-time log with operational hours Test Execution Information -Hi-Pot test -Isolation test -Insulation resistance test Quality Assurance Data -Non-conformance report summary -Inspection records -Storage, handling, shock records Science Calibration and Trending Data -Per the SVAC Plan Other material information as required