Cost Variances for Fixed and Variable Overhead Variances for Variable Overhead Variances for Fixed Overhead.

Slides:



Advertisements
Similar presentations
Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs Chapter 11: Flexible Budgeting and the Management of Overhead and.
Advertisements

Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
Standard Costing and Variances
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Eleven Flexible Budgets and Overhead Analysis.
Harvard Business School Teaching Case Polysar Ltd.
11 Flexible Budgets and Overhead Analysis Chapter  See Chapter 10 notes for a discussion of the flexible budget  For a manufacturing firm, the flexible.
ACTG 321 Agenda for Lecture 14
MSE608C – Engineering and Financial Cost Analysis Budgeting and Variance Analysis.
Flexible Budgets and Overhead Analysis Chapter 11.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Flexible Budgets and Overhead Analysis Chapter Eleven.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Standard Costs and Variance Analysis Chapter Ten & Eleven.
Using Variances under Standard Cost System
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Standard Costing and Variance Analysis
Lecture 6 Cost Variances for Direct Costs. The derivation of the price and efficiency variances AP ACTUAL COST AQ AP = actual price per unit of input.
Fundamentals of Variance Analysis Chapter 16 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
VARIANCE ANALYSIS 1 LECTURE 8.
Blocher,Stout,Cokins,Chen, Cost Management 4e ©The McGraw-Hill Companies 2008 The Flexible Budget: Factory Overhead Chapter Fourteen.
23 Performance Evaluation Using Variances from Standard Costs
Flexible Budget, Overhead Cost Variances and Management Control
Chapter 10 The Use of Budgets for Cost Control and Performance Evaluation.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 17 Flexible Budgets, Overhead Cost Management, and Activity-Based.
McGraw-Hill/IrwinCopyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved. Fundamentals of Variance Analysis Chapter 16.
Flexible Budgets and Variance Analysis
1 Module 22 Standard Costs and Variance Analysis.
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 11.
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 4 – Computing Factory Overhead Variances.
Factory Overhead Planned, Applied & Actual
24-1. CHAPTER 24 C ONTROL THROUGH S TANDARD C OSTS.
Do other companies like BMW Group use manufacturing standards to guide performance at their plants? 1.Yes 2.No.
Ch.11 Exercises Norwall Company’s Flexible budget manufacturing overhead (in condensed form) is given below : The following information is available for.
Principles of Managerial Accounting Chapter 11. Static Budget Set at the beginning of a budgeting period and that is geared to only one level of activity.
1 Brenda Mallouk Overhead Variance Analysis Management Accounting One.
Flexible Budget, Overhead Cost Variances and Management Control Lecture 19 1 Readings Chapter 8,Cost Accounting, Managerial Emphasis, 14 th edition by.
Performance Evaluation
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
Standard Costing System Chapter 4 Managerial Accounting Concepts and Empirical Evidence.
ACC3200 STANDARD COSTING.
Chapter 16 Fundamentals of Variance Analysis.
Flexible Budgeting Chapter 07, 08
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
Flexible Budgets and Overhead Analysis Chapter 7.
1 Chapter 10. Standard Costs. M11-Chp-10-1-Standard-Costs Edited May 24, Copyright © 2011, Dr. Howard Godfrey This file contains illustrative.
Performance Evaluation and Using Variances Chapter M6.
Chapter 22. Prepare a flexible budget for the income statement.
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 11.
Part 1 Study Unit 7 Review Jim Clemons, CMA.
9-1 Standard Costing: A Functional-Based Control Approach 9.
Chapter 17 Inventory & Control What we will cover: n Standard costs n Variance Analysis.
Chapter 17 Overhead Cost Management Flexible Budgets.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
Variance Analysis: Manufacturing Overhead
Flexible Budgets, Overhead Cost Variances, and Management Control
Predetermined Overhead Rates and Overhead Analysis in a Standard Costing System Appendix 8A.
Predetermined Overhead Rates and Overhead Analysis in a Standard Costing System Appendix 10A.
Flexible Budgets and Overhead Analysis
17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting.
Flexible Budgets and Overhead Analysis
Flexible Budgets and Overhead Analysis
Overhead and Marketing Variances
Flexible Budgets and Overhead Analysis
Foundations and Evolutions
Standard Costs and Variances
Predetermined Overhead Rates and Overhead Analysis in a Standard Costing System Appendix 10A.
© 2017 by McGraw-Hill Education
Flexible Budgets and Overhead Analysis
Flexible Budgets, Overhead Cost Variances, and Management Control
© 2017 by McGraw-Hill Education
Flexible Budgets, Overhead Cost Variances, and Management Control
Presentation transcript:

Cost Variances for Fixed and Variable Overhead Variances for Variable Overhead Variances for Fixed Overhead

Cost Variances for Fixed and Variable Overhead Variances for Variable Overhead Variances for Fixed Overhead

Abbreviations: Price or Wage Rate or Spending Variance = PV Quantity or Usage or Efficiency Variance = QV Actual quantity of inputs = AQ Standard quantity of inputs = SQ Actual price per input unit = AP Standard price per input unit = SP The variable cost flexible budget variance decomposes into a “price” variance and an “efficiency” variance

Formulas: PV = AQ x (AP - SP) QV = SP x (AQ - SQ) For Variable Overhead, the Q’s are the quantity of the allocation base. AQ is the actual quantity of the allocation base used. SQ is the standard quantity of the allocation base. The P’s are the Overhead Rate. AP is the Actual Overhead Rate. SP is the Budgeted Overhead Rate. These variances apply to direct materials, direct labor, and variable overhead.

The variable overhead variances Spending Variance = Actual quantity of allocation base incurred x (Actual O/H rate – Budgeted O/H rate) Efficiency Variance = Budgeted O/H rate x (Actual quantity of allocation base incurred – Standard quantity of allocation base based on actual output)

The variable overhead variances Spending Variance = Actual quantity of allocation base incurred x (Actual O/H rate – Budgeted O/H rate) Efficiency Variance = Budgeted O/H rate x (Actual quantity of allocation base incurred – Standard quantity of allocation base based on actual output) Question: Given the above definitions, what is the economic interpretation of each of these variances?

Cost Variances for Fixed and Variable Overhead Variances for Variable Overhead Variances for Fixed Overhead

Cost Variances for Fixed Overhead There are important issues related to how the denominator in the overhead rate is calculated for the purpose of allocating fixed overhead. Two choices are: 1. Practical Capacity: The level of the allocation base that would be incurred if fixed assets run full-time, but allowing for routine maintenance and unavoidable interruptions. 2. Budgeted Utilization: The level of the allocation base that would be incurred for budgeted production.

Cost Variances for Fixed Overhead Budget variance (a.k.a. spending variance) = actual total FMOH  budgeted total FMOH Volume variance = budgeted total FMOH  FMOH allocated to output using a standard costing system (budgeted FMOH per unit x actual units produced) Budgeted FMOH per unit = FMOH ÷ the denominator concept, as discussed on the previous slide. The volume variance is favorable if actual production exceeds the denominator in the FMOH rate.

Coachman Company The Coachman Company manufactures pencils. The pencils are sold by the box. Budget Actual Capacity # of boxes 10,000 12,000 20,000 D.L.H ,000 Machine hr.s ,000 Fixed O/H $40,000 $42,000

Coachman Company Budget Actual Capacity # of boxes 10,000 12,000 20,000 D.L.H ,000 Machine hr.s ,000 Fixed O/H $40,000 $42,000 The outputs here are boxes of pencils. The inputs are direct labor hours and machine hours.

Coachman Company Budget Actual Capacity # of boxes 10,000 12,000 20,000 D.L.H ,000 Machine hr.s ,000 Fixed O/H $40,000 $42,000 Let’s calculate a fixed overhead rate using actual information: $42,000  12,000 boxes = $3.50 per box

Coachman Company Budget Actual Capacity # of boxes 10,000 12,000 20,000 D.L.H ,000 Machine hr.s ,000 Fixed O/H $40,000 $42,000 Let’s calculate a fixed overhead rate using budgeted costs, budgeted production, and outputs as the allocation base: $40,000  10,000 boxes = $4.00 per box

Coachman Company Budget Actual Capacity # of boxes 10,000 12,000 20,000 D.L.H ,000 Machine hr.s ,000 Fixed O/H $40,000 $42,000 Let’s calculate a fixed overhead rate using budgeted costs in the numerator, production capacity in the denominator, and outputs as the allocation base: $40,000  20,000 boxes = $2.00 per box

Coachman Company Budget Actual Capacity # of boxes 10,000 12,000 20,000 Fixed O/H $40,000 $42,000 $40,000  20,000 boxes = $2.00 per box The advantage of using capacity in the denominator is that this shows how low the fixed cost per unit can go. Fixed cost per unit goes down as production goes up. But production levels cannot generally exceed capacity.

Coachman Company Budget Actual Capacity # of boxes 10,000 12,000 20,000 D.L.H ,000 Machine hr.s ,000 Fixed O/H $40,000 $42,000

Overhead Variances For Fixed Overhead Actual Fixed Overhead Budgeted Fixed Overhead Applied Fixed Overhead O/H rate x the application base Under- or Over- applied Fixed Overhead Budget VarianceVolume Variance These variances are computed for the company as a whole, not for individual jobs. This is what we actually spent From either the static or flexible budget

Overhead Variances For Fixed Overhead Actual Fixed Overhead Budgeted Fixed Overhead Applied Fixed Overhead O/H rate x the application base Under- or Over- applied Fixed Overhead Budget VarianceVolume Variance These variances are computed for the company as a whole, not for individual jobs. $42,000 From either the static or flexible budget

Overhead Variances For Fixed Overhead Actual Fixed Overhead Budgeted Fixed Overhead Applied Fixed Overhead O/H rate x the application base Under- or Over- applied Fixed Overhead Budget VarianceVolume Variance These variances are computed for the company as a whole, not for individual jobs. $42,000$40,000

Overhead Variances For Fixed Overhead Actual Fixed Overhead Budgeted Fixed Overhead Applied Fixed Overhead O/H rate x the application base Under- or Over- applied Fixed Overhead $2,000 Unfavorable Volume Variance These variances are computed for the company as a whole, not for individual jobs. $42,000$40,000

First let’s allocate based on factory capacity in the denominator

Coachman Company Budget Actual Capacity # of boxes 10,000 12,000 20,000 Fixed O/H $40,000 $42,000 $40,000  20,000 boxes = $2.00 per box The advantage of using capacity in the denominator is that this shows how low the fixed cost per unit can go. Fixed cost per unit goes down as production goes up. But production levels cannot generally exceed capacity.

Overhead Variances For Fixed Overhead Actual Fixed Overhead Budgeted Fixed Overhead Applied Fixed Overhead $2.00 per unit x 12,000 units Under- or Over- applied Fixed Overhead $2,000 Unfavorable Volume Variance These variances are computed for the company as a whole, not for individual jobs. $42,000$40,000

Overhead Variances For Fixed Overhead Actual Fixed Overhead Budgeted Fixed Overhead Applied Fixed Overhead $24,000 Under- or Over- applied Fixed Overhead $2,000 Unfavorable Volume Variance These variances are computed for the company as a whole, not for individual jobs. $42,000$40,000

Overhead Variances For Fixed Overhead Actual Fixed Overhead Budgeted Fixed Overhead Applied Fixed Overhead $24,000 Under- or Over- applied Fixed Overhead $2,000 Unfavorable$16,000 Unfavorable These variances are computed for the company as a whole, not for individual jobs. $42,000$40,000

Overhead Variances For Fixed Overhead Actual Fixed Overhead Budgeted Fixed Overhead Applied Fixed Overhead $24,000 $18,000 Fixed Overhead Underapplied. $2,000 Unfavorable$16,000 Unfavorable These variances are computed for the company as a whole, not for individual jobs. $42,000$40,000

Overhead Variances For Fixed Overhead Actual Fixed Overhead Budgeted Fixed Overhead Applied Fixed Overhead $24,000 $18,000 Fixed Overhead Underapplied. $2,000 Unfavorable$16,000 Unfavorable The $16,000 Unfavorable Volume Variance can also be calculated as follows: $2 per unit x 8,000 units (capacity less actual production). Hence, this is the cost of producing below capacity. $42,000$40,000

Now let’s allocate based on budgeted production in the denominator

Coachman Company Budget Actual Capacity # of boxes 10,000 12,000 20,000 D.L.H ,000 Machine hr.s ,000 Fixed O/H $40,000 $42,000 Let’s calculate a fixed overhead rate using budgeted costs and production, and outputs as the allocation base: $40,000  10,000 boxes = $4.00 per box

Overhead Variances For Fixed Overhead Actual Fixed Overhead Budgeted Fixed Overhead Applied Fixed Overhead $4.00 per unit x 12,000 units Under- or Over- applied Fixed Overhead $2,000 Unfavorable Volume Variance These variances are computed for the company as a whole, not for individual jobs. $42,000$40,000

Overhead Variances For Fixed Overhead Actual Fixed Overhead Budgeted Fixed Overhead Applied Fixed Overhead $48,000 Under- or Over- applied Fixed Overhead $2,000 Unfavorable$8,000 Favorable These variances are computed for the company as a whole, not for individual jobs. $42,000$40,000

Overhead Variances For Fixed Overhead Actual Fixed Overhead Budgeted Fixed Overhead Applied Fixed Overhead $48,000 $6,000 Fixed Overhead Overapplied. $2,000 Unfavorable$8,000 Favorable These variances are computed for the company as a whole, not for individual jobs. $42,000$40,000

Overhead Variances For Fixed Overhead Actual Fixed Overhead Budgeted Fixed Overhead Applied Fixed Overhead $48,000 $6,000 Fixed Overhead Over-applied. $2,000 Unfavorable$8,000 Favorable The $8,000 Favorable Volume Variance can also be calculated as follows: $4 per unit x 2,000 units (actual production less budgeted production). Hence, this is the cost/benefit of producing below/above budget. $42,000$40,000