OHT 5.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Contract review process and stages Contract review objectives Implementation.

Slides:



Advertisements
Similar presentations
By: MSMZ. Objective After completing this chapter, you will be able to: Explain 2 contract review stage List the objective of each stage of the contract.
Advertisements

OHT 2.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software Quality assurance (SQA) SWE 333 Dr Khalid Alnafjan
SOFTWARE QUALITY ASSURANCE Maltepe University Faculty of Engineering SE 410.
OHT 10.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The testing process Determining the test methodology phase Planning.
OHT 6.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Development plan and quality plan objectives The elements of the development.
OHT 2.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 What is software? Software errors, faults and failures Classification.
Software Development Contracts and Legal Issues Cost plus Fixed price Combined.
OHT 8.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Review objectives Formal design reviews (FDRs) Participants Preparations.
OHT 4.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Pre-project components Software project life cycle components Infrastructure.
Software Development Problems Range of Intervention Theory Prevention, Treatment and Maintenance Planning, Development and Use Cost of Intervention.
OHT 3.1 Galin, SQA from theory to implementation © Pearson Education Limited The need for comprehensive software quality requirements Classification.
OHT 22.1 Galin, SQA from theory to implementation © Pearson Education Limited Objectives of cost of software quality metrics 2.The classic model.
OHT 14.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software quality infrastructure components The need for procedures and.
Components of software quality assurance system overview
OHT 5.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Contract review process and stages Contract review objectives Implementation.
OHT 3.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The need for comprehensive software quality requirements Classification.
OHT 1.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The uniqueness of software quality assurance The environments for which.
OHT 7.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software development methodologies: - The software development life cycle.
OHT 6.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Development plan and quality plan objectives The elements of the development.
Chapter 8 Assuring the quality of external participants’ contributions
SQA Architecture Software Quality.
OHT 17.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Corrective and preventive actions — definitions The corrective and preventive.
Development and Quality Plans
Development plan and quality plan for your Project
OHT 22.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software Quality assurance (SQA) SWE 333 Dr Khalid Alnafjan
Prof. Mohamed Batouche Costs of software quality Introduction  More and more, commercial companies or public organizations are requiring.
OHT 19.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Controlled documents and quality records Definitions and objectives.
SE513 Software Quality Assurance Lecture04: Contract Review Galin, SQA from Theory to Education Limited 2004.
OHT 3.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software Quality assurance (SQA) SWE 333 Dr Khalid Alnafjan
OHT 16.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The objectives of training and certification The training and certification.
OHT 4.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software Quality assurance (SQA) SWE 333 Dr Khalid Alnafjan
SQA Architecture Software Quality By: MSMZ.
Pre-Project Activities Text Chapters 5 and 6. Pre-Project Activities 1.Contract Review 2.Development Plan 3.Quality Plan.
Chapter 4 Components of the Software Quality Assurance System
Software Quality Assurance Activities
OHT 25.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The quality assurance organizational framework Top management’s quality.
Assuring the quality of external participants' contributions Michael Rooney mpr07u.
SE513 Software Quality Control Lecture01: Introduction to Software Quality Assurance Galin, SQA from Theory to Education Limited.
Chapter 5 Contract review Contract review process and stages
CHAPTER 3 Pre-Project Components. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser Learning Objectives: To discuss: Contract Review Development and Quality.
OHT 5.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Contract review process and stages Contract review objectives Implementation.
OHT 12.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Introduction Types of external participants Risks and benefits of introducing.
OHT 18.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Introduction The foundations of high quality Foundation 1: software.
OHT 1.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The uniqueness of software quality assurance The environments for which.
SE513 Software Quality Assurance Lecture07: Maintenance Life Cycle Quality Assurance Tools Galin, SQA from Theory to Education.
Pre-Project Components
OHT 20.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The components of project progress control Progress control of internal.
OHT 12.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Introduction Types of external participants Risks and benefits of introducing.
OHT 15.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Templates The contribution of templates to software quality The organizational.
SE513 Software Quality Assurance Lecture10: Documentation and Quality Records Control Galin, SQA from Theory to Education Limited.
SEN 460 Software Quality Assurance. Bahria University Karachi Campus Waseem Akhtar Mufti B.E(C.S.E) UIT, M.S(S.E) AAU Denmark Assistant Professor Department.
SE513 Software Quality Assurance Lecture02: Software Quality Factors SE513 Software Quality Assurance Lecture02: Software Quality Factors Galin, SQA from.
Prof. Mohamed Batouche An SQA Architecture Project Development plan and Quality Plan Ch.6 Pre-project SQA components Project Life.
Multitude of source of errors - various style of source of errors will affect the SQA components * The environment in which software development & maintenance.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
P RE - PROJECT P RE - PROJECT SOFTWARE QUALITY COMPONENTS Dr. Ahmad F. Shubita.
OHT 18.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software configuration, software configuration items and software configuration.
Contract Review Software Quality Assurance and Testing.
OHT 10.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The testing process Determining the test methodology phase Planning.
OHT 15.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Templates The contribution of templates to software quality The organizational.
Contract review. What Is a Contract?  an agreement between two or more parties to the doing or to provide a product or service.
Software Quality Assurance
Components of software quality assurance system overview
Presentation 5 Contract review Contract review process and stages
Components of software quality assurance system overview
MRABFH SE604 Software Testing and QA Lecture #2: Contract Review Lecture #3: SQA Planning . Slides by Mohammad El-Ramly,
Presentation 5 Contract review Contract review process and stages
Chapter # 6 Software Configuration Management
Chapter # 4 Development and Quality Plans
Chapter # 3 The Components of SQA
Presentation transcript:

OHT 5.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Contract review process and stages Contract review objectives Implementation of contract review Contract review subjects Contract review for internal projects

OHT 5.2 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Participation in a tender Proposal submission according to customer’s RFP Receipt of an order from a company’s customer Internal request from another department in the organization

OHT 5.3 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Proposal draft review + Contract draft review Contract review

OHT 5.4 Galin, SQA from theory to implementation © Pearson Education Limited 2004 To make sure that the following activities have been satisfactorily carried out: 1.Customer requirements clarified and documented 2.Alternative approaches for carrying out the project examined 3.Formal aspects of the relationship between the customer and the software firm specified 4.Development risks identified 5.Project resources and timetable adequately estimated 6.The firm’s capacity with respect to the project examined 7.The customer’s capacity to fulfill his commitments examined 8.Partner and subcontractor’s participation conditions defined 9.Protection of proprietary rights defined

OHT 5.5 Galin, SQA from theory to implementation © Pearson Education Limited 2004 To make sure that the following activities have been satisfactorily carried out: 1. No unclarified issues remain in the contract draft 2. All understandings reached subsequent to the proposal are correctly documented 3. No “new” changes, additions, or omissions have entered the contract draft

OHT 5.6 Galin, SQA from theory to implementation © Pearson Education Limited 2004 (1) Administrative or operative software to be applied internally (2) Software packages originally intended to be sold to the public as “off-the-shelf” packages (3) Firmware to be embedded in the company’s products

OHT 5.7 Galin, SQA from theory to implementation © Pearson Education Limited 2004 SubjectDisadvantages to the internal customer (1) Inadequate definition of project requirements * Implementation deviates from the needed applications * Low satisfaction (2) Poor estimate of the required resources * Unrealistic expectations about project feasibility (3) Poor timetable* Missing scheduled dates for beginning the distribution of new products (4) Inadequate awareness of development risks * Customer unprepared for project risks and their consequences

OHT 5.8 Galin, SQA from theory to implementation © Pearson Education Limited 2004 SubjectDisadvantages to the internal customer (1) Inadequate definition of project requirements * Higher change requirements * Wasted resources due to introducing avoidable changes (2) Poor estimate of the required resources * Substantial deviations from budget * Friction between units induced by requirements for budget additions (3) Poor timetable* Development activities are under time pressures and suffer from low quality * Delays in freeing staff for their next project (4) Inadequate awareness of development risks * Tardy initiation of efforts to overcome difficulties