MONALISA installation at the ATF2 ATF2 weekly meeting.

Slides:



Advertisements
Similar presentations
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
Advertisements

ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 1.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
Wed 17 Jun 2009ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 Plans for first installation 30 June to 19 July 2009.
Tue 22 Sept 2009 Stabilization Day 7 Oxford MONALISA 1 MONALISA update Could the messenger of bad vibration news be the cause of it? beam pipe Shintake.
Status on MONALISA presented by D. Urner 6 th stabilization day 9. June 09.
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Oxford University.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
Tue 31 Mar :50 (CEST) 13:50 UTC CLIC stabilisation day 5 - LAPP OXFORD MONALISA 1 Options for interferometric monitoring of CLIC test magnet M.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
MONALISA an Update David Urner Paul Coe Matthew Warden Armin Reichold Monitoring, Alignment & Stabilisation with high Accuracy.
HAPEX III / PVDIS Targets Dave Meekins. Target List Loops – LH2 25 cm – LD2 25 cm – 20 cm Spare Solid target – Dummy tgts of correct length – Optics tgt.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Stabilization of Focus at ATF2 David Urner University of Oxford.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
MONALISA David Urner Oxford University. Straightness Monitor Build from Distance Metres Decision taken this workshop to move from existing extraction.
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Compressor status AWAKE Technical Board meeting 19 August 2015.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
FETS meeting Beam Profile Measurement Tank By P. Savage 13th June 2007.
1 NSTX Outage - Plan 1. 2 NSTX Outage – Diagnostic considerations 2 1.Erik Perry will be the manager of the construction activities in the Test Cell.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
The stabilisation of the final focus (StaFF) system Sun 12 th March 2006 MDI – LCWS06 at I I Sc Bangalore David Urner, Paul Coe, Armin Reichold.
1 July 13, 2011 Some morning photos Tank Valve Box.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
1 Initial Study Task Mark Herring / Jordan Camp. 2 May 13, 2003 Topics Purpose of Initial Study Task Schedule and Format Task Description.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Monitoring, Alignment & Stabilisation with high Accuracy.
ASTA Accelerator Directorate Review Project Plan and ES&H Carsten Hast May 20, 2014.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 1 / 26 MONALISA Laser based alignment and stability monitoring.
Karl Williams Mechanical Engineer AD/MS Fluids Group Absorber RAW Cooling Systems.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
ATF2 weekly meeting 4 July 2007 MONALISA: Attachment of Vacuum Vessels for ATF2 David Urner.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 1 MONALISA Double Bellow System Forces test results Oxford: June 2009.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
S-band processing electronics R. Ainsworth (summer student), S. Boogert, G. Boorman (Royal Holloway) A. Lyapine (University College London) Weekly ATF2.
S A Griffiths CM42 June 2015 Electrical & Control.
Alignment and stability session
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Target Installation Plan
Summary FD Support System
S1G Experiment Schedule Plan
IT-4189 Supply and installation of a cryogenic distribution system
Update of MVD services and requests
Installation of an Instrument on a CERN machine
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
MICE Target Report Video Conference 29/11/07
Absolute energy calibration of
X-ray Pump-Probe Instrument
UK CMS Oversight Committee Mtg
IP configuration session
Polarized 3He target installation
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

MONALISA installation at the ATF2 ATF2 weekly meeting

Wed 10 Dec :30 JST (05:30 UTC) ATF2 Meeting Oxford: MONALISA 1 / 10 Topics MONALISA installation Survey requests Electronics requirements Vacuum pump + lines Laser hut location Request summary

Wed 10 Dec :30 JST (05:30 UTC) ATF2 Meeting Oxford: MONALISA 2 / 10 Installation: Proposed timescale We will install the support frame at the start of the ATF2 summer shutdown 2009 –Our current estimate: July and August This will be followed by installation of services across the ATF2 tunnel –vacuum –electronic / electrical Total time required around 6 weeks

Wed 10 Dec :30 JST (05:30 UTC) ATF2 Meeting Oxford: MONALISA 3 / 10 Expected installation order Laying out floor connections for frame (1wk) Building up frame around QDzero (1 wk) Setting up vacuum systems (2 wk) Vacuum testing (1 wk) Installing interferometer components (1 wk) Installing thermometer system (2 days) Setting up laser system / DAQ (10 days)

Wed 10 Dec :30 JST (05:30 UTC) ATF2 Meeting Oxford: MONALISA 4 / 10 Survey requests Matt will bring a cardboard version of the intended metalwork footprint on QD0 –This will be discussed with KEK survey team –Verify space for mounting survey markers We would like to request an initial survey of our assembled vacuum system in summer 09 –This will improve our 3 D model for coordinate reconstructions

Wed 10 Dec :30 JST (05:30 UTC) ATF2 Meeting Oxford: MONALISA 5 / 10 Electronics requirements A standard size electronics rack –Width (support holes) 465 mm apart –Height: approx 2 m. 110 V –Total instrumentation power load expected to be approximately 3 kW –Estimate at least 6 to 8 power outlets Route for electronics readout cables –to be discussed during ATF2 meeting week

Wed 10 Dec :30 JST (05:30 UTC) ATF2 Meeting Oxford: MONALISA 6 / 10 Vacuum pump requirements Is there an old scroll pump available at KEK? –Similar to Edwards ESDP12 15 m 3 per hour Ultimate pressure 1.6 x mbar 0.4 kW motor KF25 inlet

Wed 10 Dec :30 JST (05:30 UTC) ATF2 Meeting Oxford: MONALISA 7 / 10 Vacuum system Pump location outside ATF2 beam enclosure –Requires vacuum line from pump to QDzero –We need to define the best location Near the stairs (close to the “eels bedroom”) –Need to define route for vacuum line during week of ATF2 meeting –Need assistance to weld pipes of vacuum line

Wed 10 Dec :30 JST (05:30 UTC) ATF2 Meeting Oxford: MONALISA 8 / 10 Laser hut location We would like –to assess hut location using latest drawings when Matt visits KEK. –To have office furniture for DAQ room at KEK Define route for cables and optical fibres from experiment to hut –(during week of ATF2 meeting) –Are there any safety regulations concerning protection of optical fibres along their route?

Wed 10 Dec :30 JST (05:30 UTC) ATF2 Meeting Oxford: MONALISA 9 / 10 Laser huts Shintake laser room DAQ room Proposed MONALISA room Requested MONALISA area

Wed 10 Dec :30 JST (05:30 UTC) ATF2 Meeting Oxford: MONALISA 10 / 10 Summary Schedule: Installation in July and Aug Requests: –Answers to technical questions –Laser hut –Service routing –Scroll pump and vacuum lines –Electronics rack –DAQ room furniture –Initial survey of installed system