High Power Hg Target Conceptual Design Review Hg Target System Cost Estimate V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.

Slides:



Advertisements
Similar presentations
Regional Routing Model Review Frank Southworth Oak Ridge National Laboratory Oak Ridge, TN NETS Program Review December 12, 2005 Washington DC.
Advertisements

Regional Routing Model Review: B) A Multimodal Freight Routing Model Frank Southworth Oak Ridge National Laboratory Oak Ridge, TN NETS Program Review.
Mercury Intense Target (MERIT) Update Status of the Target System Design P.T. Spampinato V.B. Graves T.A. Gabriel Muon Collaboration Friday Meeting October.
A Free Jet Hg Target Operating in a High Magnetic Field Intersecting a High Power Proton Beam Van Graves, ORNL P. Spampinato,T. Gabriel, ORNL H. Kirk,
MERIT Hg System Design V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Review Meeting Brookhaven National Laboratory Dec 12, 2005.
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Heat Flux Measurement Adrian Sabau Metals and Ceramics Division Oak Ridge National Laboratory,
Forging new generations of engineers. Fluid Power.
Titan-izing the Target Module V.B. Graves 16 Dec 2005.
Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
MERIT Hg System Final Design Review Hg Target System Design Interfaces V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma.
Analyzing the Pneumatic Reservoir Building a Mathematical Model of The Interior Volume of the Reservoir.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Lara-Curzio et al. IGTI Page 1 of 45 Screening and Evaluation of Materials for Advanced.
Target System Transportation and Decommissioning P.T. Spampinato V.B. Graves Hg System Safety Review CERN June 19-20, 2006.
Hg System Design V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
Managed by UT-Battelle for the Department of Energy Neutrino Factory Mercury Containment Concepts V.B. Graves 2 nd Oxford-Princeton High- Powered Target.
High Power Hg Target Conceptual Design Review Hg Jet Nozzle Analysis M. W. Wendel Oak Ridge National Laboratory February 7-8, 2005.
Neutron Scattering Experiment Automation with Python RT2010 Conference, Lisbon, Portugal (PCM-26) Piotr Żołnierczuk, Rick Riedel Neutron Scattering Science.
MERIT Collaboration Meeting ISSUES RELATING TO THE Hg-JET TARGET SYSTEM P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University November 17, 2005.
MERIT Hg System Design Update V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting Princeton University Nov 17-18, 2005.
N UCLEAR S CIENCE AND T ECHNOLOGY D IVISION O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Muon Collider-Neutrino Factory Collaboration.
CERN Hg Jet System V.B. Graves P.T. Spampinato T.A. Gabriel MUON Collaboration Meeting Lawrence Berkeley National Laboratory February 16, 2005.
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
Mercury Nozzle Status V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004.
High Power Hg Target Conceptual Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
High Power Hg Target Conceptual Design Review Hg Target Design P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National Laboratory February 7-8, 2005.
N UCLEAR S CIENCE AND T ECHNOLOGY D IVISION O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Muon Collider-Neutrino Factory Collaboration.
NTOFF11 Experiment Beam Window Assessment Hg Jet Interaction with the 15 Tesla Field Hydrodynamic Analysis of Hg in Supply/Plenum/Jet Hg Jet Interaction.
MERIT Hg System Final Design Review Hg Target System Design V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science & Fusion.
MERcury Intense Target (MERIT) Overview Van Graves, ORNL Syringe Procurement Kickoff Meeting Airline Hydraulics Bensalem, PA Oct 28, 2005.
Hg System Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting October 20, 2006.
Mercury Catcher Status V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
High Power Hg Target Conceptual Design Review Hg Target Interface with Solenoid V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory.
Hg System Decommissioning V.B. Graves P.T. Spampinato CERN Feb 7-8, 2008.
High Power Hg Target Conceptual Design Review Design Requirements, Interfaces, and Schedule P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National.
Target System Operations and Hg Handling P.T. Spampinato V.B. Graves MERIT Hg System Safety Review CERN June 19-20, 2006.
High Power Hg Target Conceptual Design Review Equipment Installation at CERN V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 Integrated Biomass Supply Analysis & Logistics IBSAL Shahab Sokhansanj and Anthony Turhollow.
Water Tests of Hg System V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting Dec 8, 2006.
Target Design Meeting Nozzle & Hg Collection Tests, Design Requirements, Instrumentation, Containment, Windows, Diagnostics, Controls, Base Support Structure,
Hg Delivery System Fabrication Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting May 5, 2006.
HYSPEC Instrument: Status and Performance M. Hagen Neutron Facilities Development Division, SNS, Oak Ridge National Lab. W.J. Leonhardt and A. Ruga Condensed.
NTOF11 Collaboration Meeting Non-Design Issues for the Mercury Jet Target P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University April 29-30, 2005.
MERIT Hg System Final Design Review Hg Target System Operations V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science.
Managed by UT-Battelle for the Department of Energy Hg System Decommissioning Activities V.B. Graves NFMCC Friday Meeting Feb 29, 2008.
Understanding Principles of Fluid Power Transmission
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1.
Balcrank Products Inc. Air Operated Pump Training Presentation, 2/2007.
Summary of Hg System Review at CERN Van Graves 13 Sep 2005.
CERN High Power Target Hg Jet Experiment - nTOF11 Facility & Safety Meeting V.B. Graves P.T. Spampinato T.A. Gabriel CERN March 15-17, 2005.
CRIO as a hardware platform for Machine Protection. W. Blokland S. Zhukov.
NOvA APD Cooling Water Update William Gilbert University of Minnesota.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Lara-Curzio et al. IGTI Page 1 of 39 Screening and Evaluation of Materials for Advanced.
ANL Bubble Chamber Superheated Active Target System B. DiGiovine N 2 O and C 2 F 6 as Active Fluids.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 GipGui: A Graphical User Interface for the GIP Cross Section Preparation Code ANS M&C.
MERIT Hg System Final Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science &
Stepper Motor Control, PLC vs VME Herb Strong, Pam Gurd Spallation Neutron Source Oak Ridge National Laboratory October 17, 2007.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 GRAPHITE SUBLIMATION TESTS with Inert Gas Mitigation C. C. Tsai, T. A. Gabriel, J. R.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 Ideas on a Framework and Methods for Estimating the Benefits of Government- Sponsored.
MODU RACK rooftop solar made easy call
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Project: Update T. E. Mason Oak Ridge National Laboratory.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 Transitioning to Version 8 The Setup Library Oak Ridge National Laboratory Weatherization.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
Hg System Decommissioning Activities
Neutrino Factory Mercury Catcher Concept
Introduction to the Fishtank
Quality Defines Success | Since 1976 |
Presentation transcript:

High Power Hg Target Conceptual Design Review Hg Target System Cost Estimate V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February 7-8, 2005

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 2 Conceptual Design Review 7-8 Feb 05 Outline  Procured systems  Syringe hydraulics  Instrumentation & controls  Fabricated systems  Target module  Secondary containment  Support structures  Mercury Cost estimate does not include items provided by others (beam windows, diagnostics)

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 3 Conceptual Design Review 7-8 Feb 05 Baseline Hydraulic Cylinder Costs

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 4 Conceptual Design Review 7-8 Feb 05 Syringe System Quotation  Hydraulic Power Unit  40gal reservoir  20hp elect motor w/ 12gpm variable displacement pump  Proportional directional control valve  Control panel  Cylinder assembly  Two 4" bore, 40" stroke cylinders  One 8" bore, 40" stroke cylinder  Position sensor  Checkvalve & manual ball valve  Integrated on common baseplate  Assembled and tested with water  No hydraulic fluid supplied  Total Cost: $37K DISCLAIMER – 8” cylinder operating on mercury: This cylinder is excluded from any warranty by Bosch Rexroth Corporation and L&H. No expressed or implied statements shall be applicable or considered. The recipient/user indemnifies and holds harmless Bosch Rexroth and L&H relative to usage, or otherwise, and under no circumstances hold Bosch Rexroth or L&H liable for incidental or consequential claim’s or damages, if such should arise from the above designated part number. No liability for delay of work for any cause whatsoever is considered and time is not of essence.

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 5 Conceptual Design Review 7-8 Feb 05 Instrumentation & Controls Sensors$1000 Control box (power supplies, housing for CompactPCI modules, etc) $500 LabView control system (software & hardware) $5500 Hg Vapor Monitor$5000 Total$12000

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 6 Conceptual Design Review 7-8 Feb 05 Material Costs  Material costs are experiencing almost daily fluctuations  Per local fabricator, these are hopefully conservative numbers (today)  Aluminum: $4 / lb  Carbon Steel: $1.25 / lb  Stainless Steel: $4 / lb

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 7 Conceptual Design Review 7-8 Feb 05 Estimated Materials Cost Values based on 2X weight calculated in Solidworks SubsystemMaterialCost SumpSS$1700 Primary Containment SS$800 Secondary Containment SS$5700 Base Support AL$4800 Total$13000

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 8 Conceptual Design Review 7-8 Feb 05 Estimated Labor Costs SubsystemHoursCost Sump50$2750 Primary Containment 120$6600 Secondary Containment 60$3300 Base Support40$2200 Total$17850 Hours estimated by VBG, labor rate of $55/hr per local fab shop

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 9 Conceptual Design Review 7-8 Feb 05 Hg Cost  Quote obtained from Hg supplier for two different volumes  12 liters for centrifugal pump system  53 liters for 30sec jet syringe system  Cost  12 liters: 368 $22.50/lb = $8280  53 liters: 1600 $18.90/lb = $30240  20sec jet requires 36 liters $20/lb = $21600)  Hg provided in 16-lb bottles packaged for ground/ocean transport only

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 10 Conceptual Design Review 7-8 Feb 05 System Cost Estimate Component Est. Cost ($K) Syringe System$37 Instruments & Controls$12 Fabricated Components$31 Mercury$22 Total$102