Alain Blondel MAP review Chicago 2010 International Contributions to Neutrino Factory and Muon Collider Studies R&D Experiments:

Slides:



Advertisements
Similar presentations
Fluidised Powder Rig Development Work by: Ottone Caretta, Peter Loveridge and Chris Denham (RAL) Tom Davies (Exeter University) Richard Woods (Gericke.
Advertisements

Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Participants WP3total Imperial College CERN STFC University Warwick CRNS University Oxford6 6 Total Euro  - WP3.
Fluidised powder target research A potential target technology for both a Superbeam and a neutrino factory CJ Densham, O Caretta, P Loveridge STFC Rutherford.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
K.T. McDonald March 18, 2010 LArTPC BNL 1 Magnetizing a Large Liquid Argon Detector Kirk T. McDonald Princeton University (March 18, 2010)
Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
Kirk McDonald Monday, 28th May Report of the International Working Group on Muon Beamlines Bruno Autin, Roberto Cappi, Rob Edgecock, Kirk McDonald,
MANX meeting 15 July 2008 Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment MICE in 2011.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Ajit Kurup, Imperial College London. Neil Bliss, Norbert Collomb, Alan Grant, STFC/DL, Daresbury. Costing Methodology and Status of the Neutrino Factory.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
The EMMA Project Rob Edgecock STFC Rutherford Appleton Laboratory & Huddersfield University.
The EMMA Project Rob Edgecock STFC Rutherford Appleton Laboratory & Huddersfield University *BNL, CERN, CI, FNAL, JAI, LPSC Grenoble, STFC, TRIUMF.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
The ISIS strong focusing synchrotron also at the Rutherford Appleton Laboratory. Note that ISIS occupies the same hall as NIMROD used to and re- uses some.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
Advanced Accelerator Design/Development Proton Accelerator Research and Development at RAL Shinji Machida ASTeC/STFC/RAL 24 March 2011.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE CM16 Goals Alain Blondel 8 October MICE CM 16 Collaboration meeting 8-11 October 2006 at RAL Goals of the meeting thanks to John Cobb & Marco.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
MICE RF Workshop Alain Blondel MICE = critical R&D for neutrino factory and muon collider 1 neutrino factory: accelerate muons and store to produce.
MICE CC visit at CERN Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
NEUTRINO DETECTORS Cutting-Edge Accelerator Research for a Neutrino Factory and Other Applications Ajit Kurup for the FETS and UKNF Collaborations Cutting-Edge.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
29 September 2006M.Sakuda NuFact06 Asian Regional Outlook (Japan) -by Y.Kuno (Osaka) (1) SuperBeam (T2K) (2) J-PARC current upgrade plan (3) T2HK or T2KK.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
CHIPP Aug 2010J.S. GraulichSlide 1 MICE and the Neutrino Factory Jean-Sebastien Graulich, Geneva.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
MICE RF review Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Alain Blondel 4 March 2011 NEU2012 summary NEU2012: towards a concrete proposal by the neutrino community (emphasis on long baseline accelerator expts)
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
1 Neutrino detector test beam requirements 0. Disclaimer 1. News from the neutrino scene 2. Beam requirements for AIDA and others.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
WP3: The Neutrino Factory Costing Status Ajit Kurup CERN Costing Workshop 8 th December 2011.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
(one of the) Request from MPB
K. Long, 28 June, 2016 Introduction to MICE — and the role of the Hydrogen Delivery System.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
1May, IPPP- Imperial College, London1 NF activities at IC (part II) m. apollonio.
UK Neutrino Factory Conceptual Design
Accelerator R&D for Future Neutrino Projects
The Accelerator Complex from the International Design Study
Alain Blondel 11 October 2010 GDR NEU2012 summary
Accelerator R&D for Future Neutrino Projects
Superbeams with SPL at CERN
W. T. Weng Brookhaven National Laboratory
Progress towards Pulsed Multi-MW CERN Proton Drivers
A High Intensity Neutrino Oscillation Facility in Europe
The SPL-based Proton Driver at CERN
Presentation transcript:

Alain Blondel MAP review Chicago 2010 International Contributions to Neutrino Factory and Muon Collider Studies R&D Experiments: Lab proton accelerator R&D (CERN SPL; RAL Front End study) FFAG (Kyoto), MuSiC (Osaka) Other prospects: RF in magnetic field Muon Cooling Test RAL + other, speculative ideas Design Study: IDS-NF -- European contributions Plans, recent successes, comment on sites Detector R&D for neutrino factory C.E.R.N. SPC report; what it said about neutrino factory (Muon Collider?) MERIT and MICE essential but have been discussed elsewhere – will mostly skip

Alain Blondel MAP review Chicago 2010 High-power target. 4MW. good transmission MERIT experiment (CERN) Major challenges tackled by R&D expts Fast muon cooling MICE experiment (RAL) Fast, large aperture accelerator (FFAG) EMMA (Daresbury)

Alain Blondel MAP review Chicago 2010 EMMA – Electron Model for Many Applications EMMA – Electron Model for Many Applications Built at Daresbury Laboratory. Uses existing ALICE accelerator as injector. Proof-of-principle non-scaling FFAG and prototype for Neutrino Factory. Collaboration: Daresbury, RAL, Brunel, Imperial, Oxford BNL, Fermilab TRIUMF CEA Saclay

Alain Blondel MAP review Chicago 2010 EMMA Layout EMMA Layout Section of ALICE Injection line EMMA ring Diagnostics beam line EMMA ring: 42 cells, each ~40cm long. Mounted on 7 girders/sectors. 16.5m in circumference. EMMA cell

Alain Blondel MAP review Chicago 2010 Status Status Injection line: completed in March Ring: “completed” 18 th June - 1 st beam: 26 th March - Start up: 20 th June All sectors in place, 1 not connected up. Beam possible through 4: “4 sector commissioning” EMMA on 18 th June 2010

Alain Blondel MAP review Chicago st June 15:55 21 st June 22:37 22 nd June EMMA Start-up EMMA Start-up YAG screen images Control room ~22:45 End of 4 sectors

Alain Blondel MAP review Chicago sector commissioning:on-going Last sector cabling/connection to vacuum:~12 th August Full ring commissioning:≥13 th August RF commissioning:late August Acceleration: ~end August Diagnostics beam line part 1:~Sep/Oct “ “ “ part 2:~late 2010 Status Status

Alain Blondel MAP review Chicago 2010  Incoming muon beam Variable Diffuser Beam PID TOF 0, TOF 1 Cherenkovs Trackers 1 & 2 Liquid Hydrogen absorbers 1,2,3 Downstream particle ID: TOF 2, KL EMR RF cavitiesRF power Spectrometer solenoid 1 Spectrometer solenoid 2 Coupling Coils 1&2 Focus coils MICE Collaboration across the planet

Alain Blondel MAP review Chicago 2010 Beyond MICE -- Ideas for a « Muon Cooling Test Facility » ONCE MICE will be completed, having equipped the MICE hall with -- spectrometers, TOF and PID able to measure 6D emittance to MW of 201MHz RF power MV of RF acceleration -- Liquid Hydrogen infrastructure and safety MICE can evolve into a Muon Cooling Test Facility Some funding will be devoted to this within the FP7 program ‘TIARA’ Such ideas were proposed: A. with the existing MICE hardware to test optics beyond the neutrino Factory study II: non flip optics, low-beta optics (down to 5 cm vs 42 cm nominal) other absorber materials He, Li, LiH, etc.. and shapes (wedge, see P. Snopok) LN2 cooled RF cavities B. with additional hardware: -- A. Skrinsky to test a lithium lense available at Novosibirsk -- Muons Inc. proposed to test a helicoidal channel (MANX) -- other cooling cells and possibly the 6D Cooling Experiment,

Alain Blondel MAP review Chicago 2010 Proton driver R&D (RAL and CERN)

Alain Blondel MAP review Chicago High power H - ion source MHz, 3 MeV, 4 vane RFQ 3. Three solenoid magnetic LEBT 5. MEBT and beam chopper 6. Beam dump 2. Laser profile measurement - A high power proton driver for the UKNF 1st FETS Beam April mA 200 µs 50 Hz The Front End Test Stand (UK) Simulated Measured ISIS, Astec, ICL, Warwick, Royal Holloway, Pays Vasco Frackfurt TU Also: LINAC IV at CERN under construction as part of LHC!

European Strategy for Future Neutrino Physics – October 2009 R.G. 3/10/ CERN SPL and PS2 Site layout SPS PS2 SPL Linac4 PS ISOLDE Plans for future LHC injectors

European Strategy for Future Neutrino Physics – October 2009 R.G. 3/10/ Option 1Option 2 Energy (GeV)2.5 or 52.5 and 5 Beam power (MW) 2.25 MW (2.5 GeV) or 4.5 MW (5 GeV) 5 MW (2.5 GeV) and 4 MW (5 GeV) Rep. frequency (Hz)50 Protons/pulse (x )1.12 (2.5 GeV) + 1 (5 GeV) Av. Pulse current (mA) 2040 Pulse duration (ms)0.9 1 (2.5 GeV) (5 GeV) Beam characteristics of the main options Faster rep. rate  new power supplies, more cooling etc. 2  beam current  2  nb. of klystrons etc. High Power SPL (beyond LHC) Plans for future LHC injectors Until Jan 2010 a 4 GeV/ 200 kW SPL was baseline option for LHC lumi upgrade. Emphasis now on understanding upgrades to SPS and booster. R&D on high power SPL will continue however.

Alain Blondel MAP review Chicago 2010 Muon research in Japan MUSIC at Osaka University (Kuno-san group) FFAG studies at Kyoto (Mori-san Group) COMET experiment at JPARC (see back-up slides)

Alain Blondel MAP review Chicago 2010 Studies of a GeV Scaling FFAG -- Kyoto -- More tolerant to errors than non-scaling FFAG

What is the ? MUSIC (=MUon Science oriented Intense bean Channel) muon particle experiments muon nuclear experiments and other applications Accelerator R&D with muons Muon transport system Proton beam Pion capture system this part tested in 2010

April 1st, 2010 Pion Capture SystemPion Transport System Entrance of Proton Beam target proton beam 

MuSIC First Beam from 29th and 30th, July, 2010 A 36 hour beam time with 1 nA Measurements on beam intensity and beam spatial distribution Analysis is still being made. Preliminary results (right) vertical beam distribution integrated rate: 6x10 8 Hz/µA some corrections further needed to get final numbers. Future works particle ID mixture of pions, muons and electrons momentum distribution dipole field correction counting rates as a function of vertical position

Summary The first demonstration of the pion capture system by a solenoidal field has been made at the MuSIC facility at Osaka University. The RCNP cyclotron has a 400 MeV cyclotron with 1 micro A at maximum (only 400 Watts beam power) The superconducting magnets for pion capture and pion transport systems have been constructed by April 1 st, 2010 and been tested this spring. In our first beam time of July 29 th and 30 th, about 10 6 particles has been measured at the end of the beam channel for a 0.4 Watt proton beam (of one nano A). It is expected that for a full beam intensity of 400 Watt proton beam at RCNP, about more than 10 8 muons can be obtained, which is the same as the world highest. It demonstrates that pion capture efficiency has been improved by about a factor of This would be the first demonstration of the front end of a muon collider and a neutrino factory. The funding for the muon transport system (180 degree bending part) is being requested to the funding agency (MEXT).

Alain Blondel MAP review Chicago 2010 RF in magnetic CERN At CERN a large superconducting magnet M1 has been located could be used to test high gradient RF cavities 200 MHz first (MICE), and 88 MHz at a later stage Under study (cost evaluation). aim : to complement the MTA programme.

Alain Blondel MAP review Chicago 2010 At T2K/Minerva/NOvA near detector one can measure muon-neutrino AND anti-neutrino cross-sections what about electron neutrinos? crucial for CP/T asymmetry! a mini beta beam? (but E=2Q  so need SPS type rigidity….  ) a muon storage ring (mini-neutrino-factory)? A muon storage ring for 600 MeV-1.5 GeV muons gives same spectrum as  =100 6He or 18Ne… or as the next generation of neutrino experiments appearance signal. A mini-neutrino factory?

Alain Blondel MAP review Chicago 2010 The International Design Study of the Neutrino Factory

Alain Blondel MAP review Chicago 2010 International Design Study IDS-NF Aim: produce CDR for 2012/2013 ‘CDR’ implies: Physics performance of costed scenario Conceived as input to cost/performance comparison (presumably) required at e.g. next C.E.R.N. Council’s Strategy (CCS) Workshop/Process 2012/13 NB depending on schedule of CCS we may use the IDS Interim Design Report in preparation. EU component is partly funded by FP7 EUROnu

Alain Blondel MAP review Chicago 2010 IDS-NF good baselines: km (e.g. FNAL– west coast or CERN-Finland) + magic baseline (FNAL-GranSasso or CERN-India)

Alain Blondel MAP review Chicago 2010 IDS-NF: A sample of contributions -- powder target study (originally for T2K high power) (Densham) -- shielded RF for phase rotation and cooling channel (Rogers) (assurance against possible loss of gradient in magnetic field) -- On detector side : extensive study of MIND (Laing et al) (100 kton Magnetized Iron Neutrino Detector) (baseline) -- magnetized TASD and Liquid Argon -- on phenomenology side: observation of e   oscillation through wrong sign muons from tau decay (Donini) see backup slides

Alain Blondel MAP review Chicago 2010 CERN and neutrino facilities At the request of the UK delegation a panel of the CERN scientific policy committee (SPC) prepared a report – which was endorsed with minor modification by the full SPC. Large extracts in the backups.

Alain Blondel MAP review Chicago 2010

Alain Blondel MAP review Chicago 2010 Recommendations for specific support from CERN to enable strategic decisions Costing. Support for providing comparable costing of the superbeam, beta beam and neutrino factory options is needed within the EUROnu/IDS-NF framework. In Europe the expertise required for such a comprehensive work is only available from CERN. Radioprotection and general safety issues. The development at CERN of a high power target facility, preferably with international collaboration from other laboratories would be a major asset, not only for the neutrino programme but also for the increasing number of areas where high power proton beams are needed. Completing key R&D programmes: For the Beta Beam, it is vital to demonstrate the feasibility of producing sufficient 18 Ne. For the Neutrino Factory continued contributions to the MICE experiment are important to demonstrate ionization cooling in a timely fashion for 2012/2013. R&D for future neutrino detectors. This has been taking place in Europe for some time and support from CERN, e.g. by supplying test beams, would be highly beneficial.

Alain Blondel MAP review Chicago 2010 Long term strategy planning It is unrealistic to expect to have a high intensity neutrino source of any kind in Europe before early 2020’s. By this time it is reasonable to expect that there will be many years of operating and upgrading Superbeams in Japan and in the USA. This should be closely followed. Thus if Europe is to be competitive in the 2020’s it should concentrate on the R&D for a new intense source, i.e. the Neutrino Factory or the Beta Beam. It would be advisable to systematically review the progress and prospects of this work.

Alain Blondel MAP review Chicago 2010 Conclusions 1. The key demonstration experiments for the neutrino factory and muon collider are run by largely international collaborations. 2. The level of community involvement is uneven, it varies from a few isolated institutes (in Bg, CH, F, IT, Sp, In etc.. ) to a large national effort effort (UKNF), Jp in between 3. at CERN some effort is made to keep contact – but this is hard in the present time focus has been defined by SPC report: costing, safety, MICE 4. The pioneering (intellectual, organizational and financial) input from the US groups is essential …. and recognized!

Alain Blondel MAP review Chicago 2010 Back-up slides

Alain Blondel MAP review Chicago 2010 Fluidised Powder Jet ~250μm tungsten powder driven by gas Number of potential advantages  can deliver material without splitting solenoid  carries heat away  but not a liquid Number of issues  never used as a target before  will need to be licensed  density, erosion, DC operation, etc Test rig built at RAL to test

Alain Blondel MAP review Chicago 2010 Powder –Rig contains 150 kg Tungsten –Particle size < 250 microns Total ~8,000 kg powder conveyed –90 ejection cycles –Equivalent to 15 mins continuous operation Batch mode –Test out individual handling processes before moving to a continuous flow loop Suction / Lift 2. Load Hopper 3. Pressurise Hopper 4. Powder Ejection and Observation

Alain Blondel MAP review Chicago 2010 Turbulent flow ~3bar Dune flow ~1.5bar Pulsing flow ~1.5bar Coherent jet ~2bar It works! Initial density measurement: 42 ± 5% Various improvements planned: - prevent phase separation - DC operation - minimise erosion - etc

Alain Blondel MAP review Chicago 2010 make channel longer to allow for shielding of RF against guiding field (and make higher RF gradient) recover most of performance Extra cost because of length and higher power needed higher acceleration

Alain Blondel MAP review Chicago 2010

Alain Blondel MAP review Chicago 2010

Alain Blondel MAP review Chicago 2010